Search for:


Search for:

Library addition, University of Illinois at Chicago Circle

 

View at ground level inside the library's north end addition (part of Phase 2 of campus construction). Students are using typewriters and a library employee is at the left. A temporary wall divider is at the far right. The Lecture Center is visible outside the windows.