Search for:


Search for:

Physical Education Building, University of Illinois at Chicago Circle

 

View of a locker room with a coffered concrete ceiling during construction of the Physical Education Building (part of Phase 3 of campus construction). Lockers were installed on the low raised slabs. Ventilation ducts are visible along the top and upper right of the photograph.