Search for:


Search for:

Showing 1 - 50 of 937 Records
Medical Sciences Addition, University of Illinois at the Medical Center
Image nop
A worker installs a cement floor during the late stages of construction of Phase One of the Medical Sciences Addition (now the Medical Sciences Building), with elevators at the left, and the framework for a dropped ceiling in the upper part of the photograph. The building is located at 909 South Wolcott Avenue.
Date:
December 26, 1963
Collection:
Facility Information Management
Access:
Public access


Medical Sciences Addition, University of Illinois at the Medical Center
Image nop
View southwest during construction of the upper floors of Phase One of the Medical Sciences Addition (now the Medical Sciences Building), located at 909 South Wolcott Avenue.
Date:
May 28, 1963
Collection:
Facility Information Management
Access:
Public access


Medical Sciences Addition, University of Illinois at the Medical Center
Image nop
View northeast during construction of Phase One of the Medical Sciences Addition (now the Medical Sciences Building), located at 909 South Wolcott Avenue. Part of South Wolcott Avenue is visible at the upper left.
Date:
December 27, 1962
Collection:
Facility Information Management
Access:
Public access


Medical Sciences Addition, University of Illinois at the Medical Center
Image nop
View of pipes suspended from the ceiling during construction of Phase One of the Medical Sciences Addition (now the Medical Sciences Building), located at 909 South Wolcott Avenue.
Date:
August 27, 1962
Collection:
Facility Information Management
Access:
Public access


Medical Sciences Addition, University of Illinois at the Medical Center
Image nop
View southeast showing site preparations for the construction of Phase One of the Medical Sciences Addition (now the Medical Sciences Building), located at 909 South Wolcott Avenue.
Date:
August 27, 1962
Collection:
Facility Information Management
Access:
Public access


Physical Plant Building, University of Illinois at Chicago Circle
Image nop
View of the first floor general offices in the Physical Plant Building (part of Phase 1 of campus construction), with the gypsum block screen wall in the right foreground, and rows of fluorescent lighting fixtures installed on the ceiling.
Date:
October 1, 1964
Collection:
Facility Information Management
Access:
Public access


Physical Plant Building, University of Illinois at Chicago Circle
Image nop
View of the steel ceiling structure, ductwork, and masonry walls in the Physical Plant Building (part of Phase 1 of campus construction).
Date:
June 1, 1964
Collection:
Facility Information Management
Access:
Public access


Physical Plant Building, University of Illinois at Chicago Circle
Image nop
Installation of ductwork in the Physical Plant Building (part of Phase 1 of campus construction).
Date:
May 1, 1964
Collection:
Facility Information Management
Access:
Public access


Physical Plant Building, University of Illinois at Chicago Circle
Image nop
View northwest showing construction of the exterior brick walls of the Physical Plant Building (part of Phase 1 of campus construction).
Date:
March 2, 1964
Collection:
Facility Information Management
Access:
Public access


Physical Plant Building, University of Illinois at Chicago Circle
Image nop
Site preparations and excavation for the Physical Plant Building (part of Phase 1 of campus construction).
Date:
September 4, 1963
Collection:
Facility Information Management
Access:
Public access


Library, University of Illinois at Chicago Circle
Image nop
View just inside the second floor entrance to the Library, with concrete ceiling beams and piers visible. The entrance to the Library is at the extreme right.
Date:
January 4, 1965
Collection:
Facility Information Management
Access:
Public access


Library, University of Illinois at Chicago Circle
Image nop
View of the west side and south end of the library during the late stages of its construction (part of Phase 1 of campus construction).
Date:
January 4, 1965
Collection:
Facility Information Management
Access:
Public access


Circle Forum and Library, University of Illinois at Chicago Circle
Image nop
Winter view during Phase 1 of campus construction, looking west through the Circle Forum and across part of the Great Court towards the Library, in the later stages of its construction.
Date:
December 3, 1964
Collection:
Facility Information Management
Access:
Public access


Library, University of Illinois at Chicago Circle
Image nop
View of the library interior during construction (part of Phase 1 of campus construction), looking to the east on the second floor of the building. The window wall and concrete beams are visible.
Date:
October 1, 1964
Collection:
Facility Information Management
Access:
Public access


Library, University of Illinois at Chicago Circle
Image nop
View of the metal framing at ground level for the library entrance (part of Phase 1 of campus construction).
Date:
October 1, 1964
Collection:
Facility Information Management
Access:
Public access


Library, University of Illinois at Chicago Circle
Image nop
View looking across the Great Court showing the upper floors of the Library under construction (part of Phase 1 of campus construction).
Date:
July 31, 1964
Collection:
Facility Information Management
Access:
Public access


Library, University of Illinois at Chicago Circle
Image nop
View during construction of the Library (part of Phase 1 of campus construction), showing a scale model for the concrete beams and piers.
Date:
February 3, 1964
Collection:
Facility Information Management
Access:
Public access


Library, University of Illinois at Chicago Circle
Image nop
View west across South Morgan Street at West Polk Street, showing construction of the foundation of the Library (part of Phase 1 of campus construction).
Date:
February 3, 1964
Collection:
Facility Information Management
Access:
Public access


Library, University of Illinois at Chicago Circle
Image nop
View west towards South Morgan Street, showing construction of the foundation of the Library (part of Phase 1 of campus construction).
Date:
November 29, 1963
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory, University of Illinois at Chicago Circle
Image nop
View during early stages of construction of the Science & Engineering Laboratory (part of Phase 1 of campus construction).
Date:
February 3, 1964
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory, University of Illinois at Chicago Circle
Image nop
Construction of the foundation of the Science & Engineering Laboratory (part of Phase 1 of campus construction).
Date:
November 1, 1963
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory, University of Illinois at Chicago Circle
Image nop
View west during construction of the foundation of the Science & Engineering Laboratory (part of Phase 1 of campus construction).
Date:
October 1, 1963
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory, University of Illinois at Chicago Circle
Image nop
Construction of the foundation of the Science & Engineering Laboratory (part of Phase 1 of campus construction).
Date:
September 3, 1963
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory, University of Illinois at Chicago Circle
Image nop
View of furniture for a laboratory before installation, during construction of the Science & Engineering Laboratory (part of Phase 1 of campus construction).
Date:
December 3, 1964
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory, University of Illinois at Chicago Circle
Image nop
View southwest showing scaffolding in place for work on the underside of the steel roof frame, during construction of Phase 1 of the Science & Engineering Laboratory. A number of concrete "butterfly" columns for the elevated walkway and part of Addams Hall are at the lower right.
Date:
September 1, 1964
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory, University of Illinois at Chicago Circle
Image nop
View northwest across South Halsted Street, during later stages of construction of Phase 1 of the Science & Engineering Laboratory.
Date:
July 31, 1964
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory, University of Illinois at Chicago Circle
Image nop
Scaffolding in place for adding the brick facing to the exterior walls, during construction of Phase 1 of the Science & Engineering Laboratory. A section of the elevated walkway is at the lower center of the photograph.
Date:
July 1, 1964
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the Science & Engineering Laboratory (part of Phase 1 of campus construction) showing work on the building's upper levels. Part of the elevated walkway is visible under construction at the lower right.
Date:
April 1, 1964
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory, University of Illinois at Chicago Circle
Image nop
Site preparations for construction of Phase 1 of the Science & Engineering Laboratory.
Date:
July 1, 1963
Collection:
Facility Information Management
Access:
Public access


Union (Student Center East), University of Illinois at Chicago Circle
Image nop
View of an open area during construction of the Union (part of Phase 1 of campus construction), showing the concrete "waffle slab" ceiling. The building was later renamed the Chicago Circle Center, and is now named Student Center East.
Date:
March 29, 1965
Collection:
Facility Information Management
Access:
Public access


Union (Student Center East), University of Illinois at Chicago Circle
Image nop
View northwest showing the enclosed elevated walkway between the Union Tower (right) and Union during their construction (part of Phase 1 of campus construction). The Union was later renamed the Chicago Circle Center, and is now named Student Center East.
Date:
March 29, 1965
Collection:
Facility Information Management
Access:
Public access


Union (Student Center East), University of Illinois at Chicago Circle
Image nop
View of the east facade of the Union (now Student Center East) during construction of its brick walls (part of Phase 1 of campus construction). A large truck-mounted crane is in the foreground. Part of the Union Tower is visible behind it, at the far right of the photograph.
Date:
January 29, 1965
Collection:
Facility Information Management
Access:
Public access


Union (Student Center East), University of Illinois at Chicago Circle
Image nop
View from the Great Court showing the Union (now Student Center East) under construction (part of Phase 1 of campus construction).
Date:
November 27, 1964
Collection:
Facility Information Management
Access:
Public access


Union (Student Center East), University of Illinois at Chicago Circle
Image nop
View looking northwest across South Halsted Street at the Union and Tower (now Student Center East and Student Center East Tower) under construction (part of Phase 1 of campus construction). The tower is at the right, with some of the concrete framed window panels installed.
Date:
September 26, 1964
Collection:
Facility Information Management
Access:
Public access


Union (Student Center East), University of Illinois at Chicago Circle
Image nop
View southwest showing work in progress on the Union (now Student Center East), part of Phase 1 of campus construction. A number of other campus buildings are visible behind it, including the Science and Engineering Laboratory at the upper left, and the Great Court and Lecture Center at the far right.
Date:
July 29, 1964
Collection:
Facility Information Management
Access:
Public access


Union (Student Center East), University of Illinois at Chicago Circle
Image nop
View southwest during phase 1 of campus construction, showing work in progress on the Union (now Student Center East), with concrete columns in a circular arrangement for the bookstore. At the upper right, the Great Court above the Lecture Center is visible, along with some of the concrete "butterfly" columns installed to support the elevated walkway system.
Date:
July 29, 1964
Collection:
Facility Information Management
Access:
Public access


Union (Student Center East), University of Illinois at Chicago Circle
Image nop
View southwest during construction of the Union (now Student Center East), part of Phase 1 of campus construction.
Date:
May 29, 1964
Collection:
Facility Information Management
Access:
Public access


Union (Student Center East), University of Illinois at Chicago Circle
Image nop
View south during early stages of construction of the Union (now Student Center East), part of Phase 1 of campus construction.
Date:
February 24, 1964
Collection:
Facility Information Management
Access:
Public access


Union (Student Center East), University of Illinois at Chicago Circle
Image nop
View northwest during early stages of construction of the Union (now Student Center East), part of Phase 1 of campus construction.
Date:
January 23, 1964
Collection:
Facility Information Management
Access:
Public access


Union (Student Center East), University of Illinois at Chicago Circle
Image nop
View northwest during early stages of construction of the Union Tower (now Student Center East Tower), part of Phase 1 of campus construction.
Date:
January 23, 1964
Collection:
Facility Information Management
Access:
Public access


Union (Student Center East), University of Illinois at Chicago Circle
Image nop
View south during early stages of construction of the Union (now Student Center East), part of Phase 1 of campus construction.
Date:
November 26, 1963
Collection:
Facility Information Management
Access:
Public access


Union (Student Center East), University of Illinois at Chicago Circle
Image nop
View northwest during construction of the foundation of the Union (now Student Center East), part of Phase 1 of campus construction.
Date:
November 1, 1963
Collection:
Facility Information Management
Access:
Public access


Union (Student Center East), University of Illinois at Chicago Circle
Image nop
View west during early stages of construction of the Union (now Student Center East), part of Phase 1 of campus construction.
Date:
October 1, 1963
Collection:
Facility Information Management
Access:
Public access


Union (Student Center East), University of Illinois at Chicago Circle
Image nop
View west during construction of the foundation of the Union Tower (now Student Center East Tower), part of Phase 1 of campus construction.
Date:
August 30, 1963
Collection:
Facility Information Management
Access:
Public access


Union (Student Center East), University of Illinois at Chicago Circle
Image nop
View southwest during Phase 1 of campus construction, showing construction of the foundations of the Union (now Student Center East).
Date:
August 30, 1963
Collection:
Facility Information Management
Access:
Public access


Building a brick wall around the ComEd substation
Image nop
Workers excavating a trench along the south facade of the Vernon Park Commonwealth Edison (ComEd) electrical substation on campus, in preparation for constructing a foundation for a brick wall to cover that building's south facade. The substation building and brick wall surrounding the substation were demolished in 2017.
Date:
May 1, 1964
Collection:
Facility Information Management
Access:
Public access


Utilities Building site, University of Illinois at Chicago Circle
Image nop
View northwest showing a brick wall constructed along the west perimeter of the Utilities Building site (part of Phase 1 of campus construction). A number of buildings on a no longer extant stretch of South Blue Island Avenue are visible beyond it.
Date:
May 1, 1964
Collection:
Facility Information Management
Access:
Public access


Construction of the Lecture Center Buildings, University of Illinois at Chicago Circle
Image nop
View southwest during construction of the Lecture Center Buildings (part Phase 1 of campus construction), showing installation of metal shoring for site development. A number of other campus buildings are under construction behind the Lecture Center Buildings.
Date:
May 1, 1964
Collection:
Facility Information Management
Access:
Public access


Lecture Center construction, University of Illinois at Chicago Circle
Image nop
Construction of the Lecture Center Buildings.
Date:
April 1, 1964
Collection:
Facility Information Management
Access:
Public access


Elevated walkway construction, University of Illinois at Chicago Circle
Image nop
View to the southwest, showing construction of the south part of the elevated walkway just north of West Taylor Street (part of Phase 1 of campus construction) .
Date:
April 1, 1964
Collection:
Facility Information Management
Access:
Public access