Parking Lot, University of Illinois at Chicago Circle
Image nop
View northwest showing Parking Lot 11 with paving and striping completed. The entrance to the lot is on its north side, along West Congress Parkway. The Racine Avenue building is in the background at the left.
Date:
May 27, 1967
Collection:
Facility Information Management
Access:
Public access


Parking Lots, University of Illinois at Chicago Circle
Image nop
View northwest showing site development for university parking lots located between West Harrison Street, at the left, and the Eisenhower Expressway (I-290), at the right. Parking Lot 11 is in the right foreground with the Racine Avenue Building beyond it. The intersection of West Harrison Street and South Racine Avenue is at the upper left. Parking Lots 1A and 1B are partially visible at the far left.
Date:
September 30, 1966
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View northwest showing workers paving a small area to the immediate south of the Art & Architecture Building during Phase 2 of campus construction. University Hall is at the upper left.
Date:
May 28, 1968
Collection:
Facility Information Management
Access:
Public access


Library addition, University of Illinois at Chicago Circle
Image nop
View northeast showing the west side of the Library, with workers' cars parked in front of it.
Date:
April 25, 1968
Collection:
Facility Information Management
Access:
Public access


Campus view during construction, University of Illinois at Chicago Circle
Image nop
View south along the east facade of the library from the north end of the addition (part of Phase 2 of campus construction). The Lecture Center is at the left, and the Science & Engineering Offices building is in the center distance.
Date:
April 25, 1968
Collection:
Facility Information Management
Access:
Public access


Elevated Walkway, University of Illinois at Chicago Circle
Image nop
View of a section of the elevated walkway, showing the supporting concrete columns. This section of the walkway is supported by rectangular concrete piers, rather than "butterfly" columns.
Date:
April 25, 1968
Collection:
Facility Information Management
Access:
Public access


Memorial Grove site, University of Illinois at Chicago Circle
Image nop
View south from the Science & Engineering Offices building, showing the site for the southwest garden (Memorial Grove), part of Phase 2 of campus construction. The brick wall on the campus perimeter along Taylor Street marks the south end of the grove.
Date:
April 25, 1968
Collection:
Facility Information Management
Access:
Public access


Library addition, University of Illinois at Chicago Circle
Image nop
View northwest showing the addition at the south end of the Library (part of Phase 2 of campus construction). The building's east facade is also visible. University Hall is in the distance at the upper right.
Date:
April 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory and Union, University of Illinois at Chicago Circle
Image nop
View of campus buildings looking northwest from a site under development on the east side of South Halsted Street. The Science & Engineering Laboratory, Union building and Tower (now Student Center East and Student Center East Tower), and the Charles J. Hull Mansion (now Jane Addam's Hull-House Museum) are all visible.Staff and Administrative Offices Building (now University Hall) is in the distance behind the Union.
Date:
July 27, 1967
Collection:
Facility Information Management
Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View northeast during later stages of construction showing exterior brick walls and glass roof for the Plant Research Laboratory (part of Phase 2 of campus construction).
Date:
June 27, 1967
Collection:
Facility Information Management
Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View southwest showing the interior of the Plant Research Laboratory during construction (part of Phase 2 of campus construction).
Date:
June 27, 1967
Collection:
Facility Information Management
Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View southeast looking across the intersection of South Halsted and West Taylor Streets, during late stages of construction for the Plant Research Laboratory (part of Phase 2 of campus construction).
Date:
June 27, 1967
Collection:
Facility Information Management
Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View northwest showing work on the roof, during later stages of construction of the Plant Research Laboratory (part of Phase 2 of campus construction).
Date:
March 28, 1967
Collection:
Facility Information Management
Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View southeast in winter showing the roof structure, and brick facing installed on the exterior walls of the Plant Research Laboratory (part of Phase 2 of campus construction).
Date:
February 27, 1967
Collection:
Facility Information Management
Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View east showing the interior of the Plant Research Laboratory during construction (part of Phase 2 of campus construction).
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View northeast showing roof structure, and brick facing installed on the exterior walls of the Plant Research Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View southwest during construction of the foundation for the Plant Research Laboratory (part of Phase 2 of campus construction).
Date:
October 26, 1966
Collection:
Facility Information Management
Access:
Public access


Site development, University of Illinois at Chicago Circle
Image nop
View southwest showing excavation of a pit in preparation for Phase 2 of campus construction.
Date:
July 28, 1966
Collection:
Facility Information Management
Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View southeast looking across the intersection of South Halsted and West Taylor Streets, showing construction of the foundation for the Plant Research Laboratory (part of Phase 2 of campus construction).
Date:
October 26, 1966
Collection:
Facility Information Management
Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View southeast looking across the intersection of South Halsted and West Taylor Streets, showing construction of the foundation for the Plant Research Laboratory (part of Phase 2 of campus construction).
Date:
September 30, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of cupboards and countertops in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A blackboard is on the right.
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A blackboard has been mounted on the wall.
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a classroom, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A blackboard has been mounted on the back wall.
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northeast showing the completed exterior brick wall on the south facade, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The exterior concrete pylons and steel-frame roof structure are also visible.
Date:
July 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Construction work in progress on the second floor, including the installation of ductwork, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
March 28, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View in winter looking northeast from the elevated walkway, showing construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
February 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Workers on scaffolding during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). View is toward the south.
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View of the building's concrete structure, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
February 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View of debris on the balcony along the south wall of the Science & Engineering Laboratory (Phase 1 of campus construction), during construction of the center addition to that building (part of Phase 2 of campus construction).
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northwest from the elevated walkway during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Ground-level view in winter showing building foundation and sewer installation during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
December 29, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
November 25, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View west from South Halsted Street during early stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
November 25, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View southeast during early stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
October 26, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View east during early stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A planned south addition remained unbuilt.
Date:
October 26, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northwest showing construction of the foundation for the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). Part of the elevated walkway is visible at the upper left.
Date:
September 30, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View west showing construction of the foundation for the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A section of the elevated walkway is visible in the upper part of the photograph.
Date:
July 28, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northeast showing construction of the foundation for the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). South Halsted Street is at the upper right.
Date:
June 29, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View of scissor stairway during construction of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
April 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View of an office with built-in shelving, cupboards, and characteristic Block I windows in the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southwest from the Great Court showing exterior construction near completion on the Science & Engineering Offices building (part of Phase 2 of campus construction). Taft Hall is at the left, and the Library is at the right.
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View showing fire damage at top of site during construction of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
May 24, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the fifth floor of the Science & Engineering Offices building (part of Phase 2 of campus construction). The southwest gateway to the campus at South Morgan Street is in the foreground, featuring a brick-paved plaza, granite benches, granite bollards, and a fence designed by Walter Netsch. Divided horizontally into three sections, the fence features vertical members spaced further and further apart as it rises, a design theme echoed in the three-stepped structure of University Hall.
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
Detail of exterior concrete wall at the Science & Engineering Offices building (built during Phase 2 of campus construction).
Date:
November 25, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the fourth floor of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
December 29, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southwest during construction of the first floor of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
September 30, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View northwest showing construction of the foundation for the Science & Engineering Offices building (part of Phase 2 of campus construction), with forms for poured concrete visible. Neighborhood buildings across South Morgan Street are visible in the upper part of the photograph.
Date:
August 25, 1966
Collection:
Facility Information Management
Access:
Public access