Search for:


Search for:

Showing 1 - 50 of 404 Records
Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building showing the smaller swimming pool near completion. The steel-frame roof structure is visible.
Date:
December 29, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View west during construction of the Physical Education Building (part of Phase 3 of campus construction), showing exterior work near completion. A section of the elevated walkway is visible at the center right, crossing over Roosevelt Road.
Date:
October 23, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing installation of the floor in the gymnasium.
Date:
September 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building, showing the smaller swimming pool with concrete work in progress.
Date:
August 20, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing cinder blocks being used for construction of interior walls.
Date:
June 17, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast across Roosevelt Road during construction of the Physical Education building( part of Phase 3 of campus construction), showing exterior brick walls completed.
Date:
May 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing installation of pipes. The open atrium is visible at the right.
Date:
April 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the roof installed over the steel structure on the west part of the building. The steel roof structure is visible over the swimming pool at the far right. Roosevelt Road runs across the upper part of the photograph.
Date:
March 21, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north in winter during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the west part of the building with steel framework in place for the roof structure and vertical supports. The office area with its open atrium is visible at the right. Roosevelt Road is at the top of the photograph.
Date:
February 21, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View south in winter during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the steel framework in place for the roof structure and vertical supports. Roosevelt Road is at the bottom of the photograph.
Date:
February 21, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
Construction of a locker room with a coffered concrete ceiling during construction of the Physical Education Building (part of Phase 3 of campus construction). Lockers were installed on the low raised slabs.
Date:
January 23, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southwest during construction of the Physical Education Building (part of Phase 3 of campus construction). The swimming pool is visible near the center of the image. Roosevelt Road is at the right, and South Morgan Street is at the top of the image.
Date:
November 16, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north during construction of the first floor of the Physical Education Building (part of Phase 3 of campus construction). Science & Engineering South is beyond it at the right.
Date:
September 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast showing the foundation of the Physical Education Building in the foreground, and work in progress on the first floor of the building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is at the left.
Date:
September 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast from Roosevelt Road showing construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is at the left.
Date:
August 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the first floor of the Physical Education Building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is at the upper right, and the downtown Loop skyline is visible in the distance at the left.
Date:
August 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). Roosevelt Road runs across the upper part of the image, and Parking Lot 5C and Science & Engineering South are visible at the top.
Date:
July 16, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View east during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is at the upper center.
Date:
May 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). The Science & Engineering Offices building is in the distance at the left.
Date:
May 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). The Science & Engineering Offices building is visible in the distance at the right.
Date:
May 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest showing excavations and preparations for construction of the Physical Education Building (part of Phase 3 of campus construction).
Date:
February 20, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest showing an excavated site along the south side of Roosevelt Road, in preparation for construction of the Physical Education Building (part of Phase 3 of campus construction).
Date:
January 22, 1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest in winter showing construction of the foundation of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the Education & Communications Building (part of Phase 3 of campus construction), showing an open plaza with square planters being constructed. University Hall stands in the distance.
Date:
July 28, 1971
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View of an entranceway hallway with elevators in the Education & Communications Building (part of Phase 3 of campus construction).
Date:
April 6, 1971
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Education & Communications Building (part of Phase 3 of campus construction), showing of a work area containing wood fixtures.
Date:
February 23, 1971
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
February 23, 1971
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
February 23, 1971
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View east along the second-level elevated walkway at the Education & Communications Building (part of Phase 3 of campus construction). The walkway connected with a section of elevated walkway which crossed South Morgan Street.
Date:
February 1, 1971
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View of ductwork and pipework during construction on the upper level of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
December 29, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest from an open plaza with square brick planters, looking towards the Education & Communications Building (part of Phase 3 of campus construction).
Date:
December 29, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View of an atrium with a skylight in the Physical Education Building (built during Phase 3 of campus construction). A narrow walkway connects the second-floor offices facing the atrium. A water fountain is on the first floor.
Date:
December 29, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest from University Hall, during later stages of construction of the Education & Communications Building and Theater (part of Phase 3 of campus construction.) The intersection of West Harrison Street and South Morgan Street is at the lower center of the image, and the Eisenhower Expressway (I-290) is on the right of the construction site. An unfinished section of elevated walkway leads from the Education & Communications Building across South Morgan Street.
Date:
December 2, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northeast during later stages of construction of the Education & Communications Building (part of Phase 3 of campus construction). An open plaza with granite benches for seating is in the foreground.
Date:
December 2, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View of the Theater under construction, part of the Education & Communications Building (built during Phase 3 of campus construction).
Date:
December 2, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest showing later stages of construction on the Education & Communications Building and Theater (part of Phase 3 of campus construction). The intersection of West Harrison Street and South Morgan Street is at the lower center, and the Eisenhower Expressway (I-290) runs up the right side of image. The Behavioral Sciences Building is at the left. A section of elevated walkway crossing over South Morgan Street near the Education Building is also visible.
Date:
October 30, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Education & Communications Building (part of Phase 3 of campus construction), showing cinder block walls with decorative roundel, pipes, and ductwork.
Date:
October 1, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View east during construction of the Education & Communications Building (part of Phase 3 of campus construction), showing the loading dock area for the Theater with brick facing installed on exterior walls.
Date:
September 2, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the upper levels of the Education & Communications Building (part of Phase 3 of campus construction). Scaffolding is in place for the addition of a brick facing to the exterior.
Date:
July 7, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest showing construction in progress on the Education & Communications Building and Theater (part of Phase 3 of campus construction). The intersection of West Harrison Street and South Morgan Street is at the lower right, and the Eisenhower Expressway (I-290) is to the right of the construction site, in the upper part of the image. The Behavioral Sciences Building is at the lower left.
Date:
June 2, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Education & Communications Building (part of Phase 3 of campus construction), showing an open plaza area in the southeast corner of the building complex. West Harrison Street is in the upper part of the photograph, and a number of campus buildings are visible beyond it.
Date:
June 2, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest from University Hall, showing construction in progress on the Education & Communications Building (part of Phase 3 of campus construction). The intersection of West Harrison Street and South Morgan Street is at the lower center of the image, and the Eisenhower Expressway (I-290) is to the right of the construction site, in the upper part of the image. The Behavioral Sciences Building is at the lower left.
Date:
April 28, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View southwest during construction of the Education & Communications Building (part of Phase 3 of campus construction), showing the open plaza in the foreground and the Theater behind it. Scaffolding for installation of brick walls is visible at the left.
Date:
April 28, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Theater, part of the Education & Communications Building, showing steel framing above concrete foundation walls. Built as part of Phase 3 of campus construction, it is now named Education, Theatre, Music and Social Work.
Date:
March 30, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest across the Eisenhower Expressway (I-290) from the roof of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
March 30, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
Construction of the Education & Communications Building (part of Phase 3 of campus construction), showing reinforced concrete support columns in place.
Date:
March 30, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View southwest during construction of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
January 28, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the foundation of the Education & Communications Building (part of Phase 3 of campus construction). West Harrison Street is at the lower left, and the Eisenhower Expressway (I-290) and CTA train tracks are at the upper right. Part of South Morgan Street is visible in the lower right corner.
Date:
January 28, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the foundation of the Education & Communications Building (part of Phase 3 of campus construction). The intersection of West Harrison Street and South Morgan Street is at the lower right of the image, and the Eisenhower Expressway (I-290) and CTA train tracks are in the upper part of the image. Part of the Behavioral Sciences Building is visible at the lower left.
Date:
August 27, 1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View southwest during excavations in preparation for construction of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
August 19, 1969
Collection:
Facility Information Management
Access:
Public access