Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of cupboards and countertops in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A blackboard is on the right.
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A blackboard has been mounted on the wall.
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a classroom, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A blackboard has been mounted on the back wall.
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northwest showing the completed exterior brick wall on the of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The exterior concrete pylons and steel-framed roof structure are also visible. South Taylor Street is at the far right.
Date:
November 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of built-in furniture in a classroom laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
September 29, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northeast showing the completed exterior brick wall on the south facade, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The exterior concrete pylons and steel-frame roof structure are also visible.
Date:
July 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View west from South Halsted Street showing the completed exterior brick walls for the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The exterior concrete pylons and steel-framed roof structure are also visible.
Date:
June 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction), showing completed exterior brick walls. The exterior concrete pylons and steel-framed roof structure are also visible.
Date:
June 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction), showing work in progress on the exterior brick walls. The exterior concrete pylons and steel-frame roof structure are also visible.
Date:
May 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction), showing work in progress on the exterior brick walls. The exterior concrete pylons and steel-framed roof structure are also visible.
Date:
May 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Construction work in progress on the second floor, including the installation of ductwork, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
March 28, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View in winter looking northeast from the elevated walkway, showing construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
February 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Workers on scaffolding during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). View is toward the south.
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View of the building's concrete structure, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
February 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View of debris on the balcony along the south wall of the Science & Engineering Laboratory (Phase 1 of campus construction), during construction of the center addition to that building (part of Phase 2 of campus construction).
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northwest from the elevated walkway during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Ground-level view in winter showing building foundation and sewer installation during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
December 29, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
November 25, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View west from South Halsted Street during early stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
November 25, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View southeast during early stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
October 26, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View east during early stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A planned south addition remained unbuilt.
Date:
October 26, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northwest showing construction of the foundation for the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). Part of the elevated walkway is visible at the upper left.
Date:
September 30, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View west showing construction of the foundation for the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A section of the elevated walkway is visible in the upper part of the photograph.
Date:
July 28, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northeast showing construction of the foundation for the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). South Halsted Street is at the upper right.
Date:
June 29, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View of scissor stairway during construction of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
April 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View of an office with built-in shelving, cupboards, and characteristic Block I windows in the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southwest from the Great Court showing exterior construction near completion on the Science & Engineering Offices building (part of Phase 2 of campus construction). Taft Hall is at the left, and the Library is at the right.
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View northeast across South Morgan Street showing the completed Science & Engineering Offices building (part of Phase 2 of campus construction). The brick wall marking the campus' west perimeter is in the foreground, and the Library is visible to the left.
Date:
December 29, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View northwest showing exterior construction near completion on the Science & Engineering Offices building (part of Phase 2 of campus construction). The Library and the Staff and Administrative Offices Building (University Hall) are behind it to the right.
Date:
November 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View north showing an excavation for underground work adjacent to the north side of the Science & Engineering Offices building (part of Phase 2 of campus construction). The south end of the Library is at the upper left.
Date:
September 29, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southwest during construction of the thirteenth floor of the Science & Engineering Offices building (part of Phase 2 of campus construction). Concrete-framed window panels have been installed on a number of the building's floors. Burnham Hall is in the left foreground.
Date:
August 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View showing fire damage at top of site during construction of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
May 24, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
Detail of fire damage at site during construction of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
May 24, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the fifth floor of the Science & Engineering Offices building (part of Phase 2 of campus construction). The southwest gateway to the campus at South Morgan Street is in the foreground, featuring a brick-paved plaza, granite benches, granite bollards, and a fence designed by Walter Netsch. Divided horizontally into three sections, the fence features vertical members spaced further and further apart as it rises, a design theme echoed in the three-stepped structure of University Hall.
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
Detail of exterior concrete wall at the Science & Engineering Offices building (built during Phase 2 of campus construction).
Date:
November 25, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the fourth floor of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
December 29, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southwest during construction of the first floor of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
September 30, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View northwest showing construction of the foundation for the Science & Engineering Offices building (part of Phase 2 of campus construction), with forms for poured concrete visible. Neighborhood buildings across South Morgan Street are visible in the upper part of the photograph.
Date:
August 25, 1966
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View northeast showing glazing work on the pyramid-shaped skylights at the south end of the Art & Architecture Building, during the late stages of the building's construction (part of Phase 2 of campus construction).
Date:
August 28, 1968
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View from below during work on a large pyramid-shaped skylight at the south end of the Art & Architecture Building (part of Phase 2 of campus construction).
Date:
April 25, 1968
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View east along the enclosed elevated walkway connecting the Art & Architecture Building with the main spine of the campus walkway system, during installation of windows (part of Phase 2 of campus construction).
Date:
March 28, 1968
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View of hallway with stairs in the Art & Architecture Building, during installation of tile flooring (part of Phase 2 of campus construction).
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View on the first floor of the Art & Architecture Building, showing a hallway with stairways during installation of tile flooring (part of Phase 2 of campus construction).
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View during late stages of construction of the Art & Architecture Building (part of Phase 2 of campus construction), showing a basement studio on the east side of the building, with open views to the first and second floors (in the distance at top center).
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View of the granite-floored first floor gallery adjacent to the main entrance of the Art & Architecture Building, during late stages of construction (part of Phase 2 of campus construction).
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View during late stages of construction of the Art & Architecture Building (part of Phase 2 of campus construction), showing a second floor studio with a concrete staircase up to the third floor.
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View of an octagonal atrium in the Art & Architecture Building during later stages of that building's construction (part of Phase 2 of campus construction).
Date:
December 29, 1967
Collection:
Facility Information Management
Access:
Public access