View just inside the second floor entrance to the Library, with concrete ceiling beams and piers visible. The entrance to the Library is at the extreme right.
Date:
January 4, 1965
Collection:
Facility Information Management
Access:
Public access


Library, University of Illinois at Chicago Circle
Image nop
View of the west side and south end of the library during the late stages of its construction (part of Phase 1 of campus construction).
Date:
January 4, 1965
Collection:
Facility Information Management
Access:
Public access


Circle Forum and Library, University of Illinois at Chicago Circle
Image nop
Winter view during Phase 1 of campus construction, looking west through the Circle Forum and across part of the Great Court towards the Library, in the later stages of its construction.
Date:
December 3, 1964
Collection:
Facility Information Management
Access:
Public access


Library, University of Illinois at Chicago Circle
Image nop
View of the library interior during construction (part of Phase 1 of campus construction), looking to the east on the second floor of the building. The window wall and concrete beams are visible.
Date:
October 1, 1964
Collection:
Facility Information Management
Access:
Public access


Library, University of Illinois at Chicago Circle
Image nop
View of the metal framing at ground level for the library entrance (part of Phase 1 of campus construction).
Date:
October 1, 1964
Collection:
Facility Information Management
Access:
Public access


Library, University of Illinois at Chicago Circle
Image nop
View looking across the Great Court showing the upper floors of the Library under construction (part of Phase 1 of campus construction).
Date:
July 31, 1964
Collection:
Facility Information Management
Access:
Public access


Library, University of Illinois at Chicago Circle
Image nop
View during construction of the Library (part of Phase 1 of campus construction), showing a scale model for the concrete beams and piers.
Date:
February 3, 1964
Collection:
Facility Information Management
Access:
Public access


Library, University of Illinois at Chicago Circle
Image nop
View west across South Morgan Street at West Polk Street, showing construction of the foundation of the Library (part of Phase 1 of campus construction).
Date:
February 3, 1964
Collection:
Facility Information Management
Access:
Public access


Library, University of Illinois at Chicago Circle
Image nop
View west towards South Morgan Street, showing construction of the foundation of the Library (part of Phase 1 of campus construction).
Date:
November 29, 1963
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory, University of Illinois at Chicago Circle
Image nop
View during early stages of construction of the Science & Engineering Laboratory (part of Phase 1 of campus construction).
Date:
February 3, 1964
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory, University of Illinois at Chicago Circle
Image nop
Construction of the foundation of the Science & Engineering Laboratory (part of Phase 1 of campus construction).
Date:
November 1, 1963
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory, University of Illinois at Chicago Circle
Image nop
View west during construction of the foundation of the Science & Engineering Laboratory (part of Phase 1 of campus construction).
Date:
October 1, 1963
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory, University of Illinois at Chicago Circle
Image nop
Construction of the foundation of the Science & Engineering Laboratory (part of Phase 1 of campus construction).
Date:
September 3, 1963
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory, University of Illinois at Chicago Circle
Image nop
View of furniture for a laboratory before installation, during construction of the Science & Engineering Laboratory (part of Phase 1 of campus construction).
Date:
December 3, 1964
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory, University of Illinois at Chicago Circle
Image nop
View southwest showing scaffolding in place for work on the underside of the steel roof frame, during construction of Phase 1 of the Science & Engineering Laboratory. A number of concrete "butterfly" columns for the elevated walkway and part of Addams Hall are at the lower right.
Date:
September 1, 1964
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory, University of Illinois at Chicago Circle
Image nop
View northwest across South Halsted Street, during later stages of construction of Phase 1 of the Science & Engineering Laboratory.
Date:
July 31, 1964
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory, University of Illinois at Chicago Circle
Image nop
Scaffolding in place for adding the brick facing to the exterior walls, during construction of Phase 1 of the Science & Engineering Laboratory. A section of the elevated walkway is at the lower center of the photograph.
Date:
July 1, 1964
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the Science & Engineering Laboratory (part of Phase 1 of campus construction) showing work on the building's upper levels. Part of the elevated walkway is visible under construction at the lower right.
Date:
April 1, 1964
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory, University of Illinois at Chicago Circle
Image nop
Site preparations for construction of Phase 1 of the Science & Engineering Laboratory.
Date:
July 1, 1963
Collection:
Facility Information Management
Access:
Public access


Building a brick wall around the ComEd substation
Image nop
Workers excavating a trench along the south facade of the Vernon Park Commonwealth Edison (ComEd) electrical substation on campus, in preparation for constructing a foundation for a brick wall to cover that building's south facade. The substation building and brick wall surrounding the substation were demolished in 2017.
Date:
May 1, 1964
Collection:
Facility Information Management
Access:
Public access


Utilities Building site, University of Illinois at Chicago Circle
Image nop
View northwest showing a brick wall constructed along the west perimeter of the Utilities Building site (part of Phase 1 of campus construction). A number of buildings on a no longer extant stretch of South Blue Island Avenue are visible beyond it.
Date:
May 1, 1964
Collection:
Facility Information Management
Access:
Public access


Construction of the Lecture Center Buildings, University of Illinois at Chicago Circle
Image nop
View southwest during construction of the Lecture Center Buildings (part Phase 1 of campus construction), showing installation of metal shoring for site development. A number of other campus buildings are under construction behind the Lecture Center Buildings.
Date:
May 1, 1964
Collection:
Facility Information Management
Access:
Public access


Lecture Center construction, University of Illinois at Chicago Circle
Image nop
Construction of the Lecture Center Buildings.
Date:
April 1, 1964
Collection:
Facility Information Management
Access:
Public access


Elevated walkway construction, University of Illinois at Chicago Circle
Image nop
View to the southwest, showing construction of the south part of the elevated walkway just north of West Taylor Street (part of Phase 1 of campus construction) .
Date:
April 1, 1964
Collection:
Facility Information Management
Access:
Public access


Lecture Center construction, University of Illinois at Chicago Circle
Image nop
Construction of the Lecture Center Buildings.
Date:
1964
Collection:
Facility Information Management
Access:
Public access


Lecture Center construction, University of Illinois at Chicago Circle
Image nop
Construction of the foundation of Lecture Center Buildings.
Date:
February 3, 1964
Collection:
Facility Information Management
Access:
Public access


Lecture Center construction, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the foundation of Lecture Center Buildings. Wooden forms for poured concrete and reinforcing bars are shown.
Date:
December 31, 1963
Collection:
Facility Information Management
Access:
Public access


Lecture Center construction, University of Illinois at Chicago Circle
Image nop
Construction of the foundation, Lecture Center Buildings.
Date:
October 1, 1963
Collection:
Facility Information Management
Access:
Public access


Lecture Center construction, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the foundation, Lecture Center Buildings.
Date:
September 3, 1963
Collection:
Facility Information Management
Access:
Public access


Lecture Center construction, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the foundation, Lecture Center Buildings.
Date:
August 2, 1963
Collection:
Facility Information Management
Access:
Public access


Campus view during construction
Image nop
Campus view to the southeast during construction of multiple buildings. The Lecture Centers, Great Court and Circle Forum are at the center of the image. A portion of the elevated walkway is visible at the lower left. The library is at the right.
Date:
November 3, 1964
Collection:
Facility Information Management
Access:
Public access


Parking lots, University of Illinois at Chicago Circle
Image nop
View looking west, showing demolition of a building during site preparations for Parking Lots 1A and 1B, located between West Vernon Park Place (on the left) and West Harrison Street (right). Neighborhood buildings surround the site.
Date:
November 3, 1964
Collection:
Facility Information Management
Access:
Public access


Great Court construction, University of Illinois at Chicago Circle
Image nop
View northwest from the Great Court towards University Hall, showing the exedrae under construction. The Great Court, Circle Forum, and campus elevated walkway system were demolished over a six-year period extending from 1993 to 1999.
Date:
November 3, 1964
Collection:
Facility Information Management
Access:
Public access


Elevated walkway construction, University of Illinois at Chicago Circle
Image nop
View during construction of a section of the elevated walkway across West Harrison Street. A number of the concrete "butterfly" support columns are visible. Jefferson Hall is at the lower right.
Date:
October 1, 1964
Collection:
Facility Information Management
Access:
Public access


Site preparation, University of Illinois at Chicago Circle
Image nop
View across South Halsted Street looking towards preparations on a site between Halsted Street and the Dan Ryan Expressway.
Date:
October 1, 1964
Collection:
Facility Information Management
Access:
Public access


Harrison Street, University of Illinois at Chicago Circle
Image nop
View west along West Harrison Street showing road construction adjacent to campus. Part of University Hall is visible at the upper left.
Date:
October 1, 1964
Collection:
Facility Information Management
Access:
Public access


Campus view during construction, University of Illinois at Chicago Circle
Image nop
Campus view to the east during construction of multiple buildings. The Commonwealth Edison (ComEd) electric substation (demolished 2017) is at the lower left, and numerous concrete "butterfly" columns to support the elevated walkway are in front of that. The Union Tower (now Student Center East Tower) is in the center distance.
Date:
October 1, 1964
Collection:
Facility Information Management
Access:
Public access


Great Court construction, University of Illinois at Chicago Circle
Image nop
Construction detail of a corner of the Great Court. Granite slabs for the elevated walkway form the perimeter.
Date:
September 1, 1964
Collection:
Facility Information Management
Access:
Public access


Great Court construction, University of Illinois at Chicago Circle and Circle Forum
Image nop
View across the Great Court, with the Circle Forum at its center.
Date:
September 1, 1964
Collection:
Facility Information Management
Access:
Public access


Elevated walkway construction, University of Illinois at Chicago Circle
Image nop
View southwest of a section of elevated walkway crossing over West Taylor Street, with a ramp leading to ground level on the south side of Taylor Street. This section of the walkway is supported by rectangular concrete piers, rather than "butterfly" columns.
Date:
September 1, 1964
Collection:
Facility Information Management
Access:
Public access


Campus view during construction, University of Illinois at Chicago Circle
Image nop
View during construction, with part of the Union building and one of the Lecture Center buildings visible in the upper part of the photograph.
Date:
September 1, 1964
Collection:
Facility Information Management
Access:
Public access


Lecture Center construction, University of Illinois at Chicago Circle
Image nop
Construction of the Lecture Center Buildings, showing sloped concrete floor for one of the lecture halls.
Date:
July 31, 1964
Collection:
Facility Information Management
Access:
Public access


Lecture Center construction, University of Illinois at Chicago Circle and elevated walkway
Image nop
View during construction of the Lecture Center Buildings. Concrete columns for the elevated walkway surround the Lecture Centers.
Date:
June 1, 1964
Collection:
Facility Information Management
Access:
Public access


Lecture Center construction, University of Illinois at Chicago Circle and elevated walkway
Image nop
View during construction of the Lecture Center Buildings. Concrete columns for the elevated walkway are at the left.
Date:
June 1, 1964
Collection:
Facility Information Management
Access:
Public access


Construction of Great Court and Lecture Center Buildings
Image nop
View northeast during construction of the Great Court above the Lecture Center Buildings. Concrete "butterfly" columns to support the Great Court surround the Lecture Center. Classroom Buildings are behind it, and the downtown skyline is in the distance.
Date:
June 1, 1964
Collection:
Facility Information Management
Access:
Public access


Campus building site, University of Illinois at Chicago Circle
Image nop
Construction view, showing excavated area with pipes leading to one of the classroom buildings.
Date:
June 1, 1964
Collection:
Facility Information Management
Access:
Public access


Elevated walkway, University of Illinois at Chicago Circle
Image nop
View northwest during winter, looking up at the elevated walkway from ground level. The concrete "butterfly" columns supporting the walkway are clearly visible. The space between the two sides of the walkway allowed room for trees. Part of University Hall is visible at the far left beyond the walkway, and Jefferson Hall is in the distance near the center of the photograph.
Date:
February 27, 1965
Collection:
Facility Information Management
Access:
Public access


Lecture Center construction, University of Illinois at Chicago Circle
Image nop
View through hallway windows of a classroom in the Lecture Center Buildings. The hallway is visible at the right.
Date:
March 2, 1965
Collection:
Facility Information Management
Access:
Public access


Lecture Center construction, University of Illinois at Chicago Circle
Image nop
View towards the front of a lecture hall in the Lecture Center buildings, showing classroom seating and concrete ceiling beams. A countertop with a sink, a podium with a microphone, and a blackboard are at the front of the room.
Date:
February 27, 1965
Collection:
Facility Information Management
Access:
Public access


Elevated walkway construction, University of Illinois at Chicago Circle
Image nop
View in winter showing the elevated walkway system crossing above West Harrison Street (lower right), with a ramp leading down to the Peoria Street overpass above the Eisenhower Expressway. The Circle interchange is visible in the upper right of the photograph.
Date:
February 2, 1965
Collection:
Facility Information Management
Access:
Public access