Parking Lot, University of Illinois at Chicago Circle
Image nop
View northwest showing Parking Lot 11 with paving and striping completed. The entrance to the lot is on its north side, along West Congress Parkway. The Racine Avenue building is in the background at the left.
Date:
May 27, 1967
Collection:
Facility Information Management
Access:
Public access


Parking Lots, University of Illinois at Chicago Circle
Image nop
View northwest showing site development for university parking lots located between West Harrison Street, at the left, and the Eisenhower Expressway (I-290), at the right. Parking Lot 11 is in the right foreground with the Racine Avenue Building beyond it. The intersection of West Harrison Street and South Racine Avenue is at the upper left. Parking Lots 1A and 1B are partially visible at the far left.
Date:
September 30, 1966
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View northwest showing workers paving a small area to the immediate south of the Art & Architecture Building during Phase 2 of campus construction. University Hall is at the upper left.
Date:
May 28, 1968
Collection:
Facility Information Management
Access:
Public access


Library addition, University of Illinois at Chicago Circle
Image nop
View northeast showing the west side of the Library, with workers' cars parked in front of it.
Date:
April 25, 1968
Collection:
Facility Information Management
Access:
Public access


Campus view during construction, University of Illinois at Chicago Circle
Image nop
View south along the east facade of the library from the north end of the addition (part of Phase 2 of campus construction). The Lecture Center is at the left, and the Science & Engineering Offices building is in the center distance.
Date:
April 25, 1968
Collection:
Facility Information Management
Access:
Public access


Elevated Walkway, University of Illinois at Chicago Circle
Image nop
View of a section of the elevated walkway, showing the supporting concrete columns. This section of the walkway is supported by rectangular concrete piers, rather than "butterfly" columns.
Date:
April 25, 1968
Collection:
Facility Information Management
Access:
Public access


Memorial Grove site, University of Illinois at Chicago Circle
Image nop
View south from the Science & Engineering Offices building, showing the site for the southwest garden (Memorial Grove), part of Phase 2 of campus construction. The brick wall on the campus perimeter along Taylor Street marks the south end of the grove.
Date:
April 25, 1968
Collection:
Facility Information Management
Access:
Public access


Library addition, University of Illinois at Chicago Circle
Image nop
View northwest showing the addition at the south end of the Library (part of Phase 2 of campus construction). The building's east facade is also visible. University Hall is in the distance at the upper right.
Date:
April 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory and Union, University of Illinois at Chicago Circle
Image nop
View of campus buildings looking northwest from a site under development on the east side of South Halsted Street. The Science & Engineering Laboratory, Union building and Tower (now Student Center East and Student Center East Tower), and the Charles J. Hull Mansion (now Jane Addam's Hull-House Museum) are all visible.Staff and Administrative Offices Building (now University Hall) is in the distance behind the Union.
Date:
July 27, 1967
Collection:
Facility Information Management
Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View northeast during later stages of construction showing exterior brick walls and glass roof for the Plant Research Laboratory (part of Phase 2 of campus construction).
Date:
June 27, 1967
Collection:
Facility Information Management
Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View southwest showing the interior of the Plant Research Laboratory during construction (part of Phase 2 of campus construction).
Date:
June 27, 1967
Collection:
Facility Information Management
Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View southeast looking across the intersection of South Halsted and West Taylor Streets, during late stages of construction for the Plant Research Laboratory (part of Phase 2 of campus construction).
Date:
June 27, 1967
Collection:
Facility Information Management
Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View northwest showing work on the roof, during later stages of construction of the Plant Research Laboratory (part of Phase 2 of campus construction).
Date:
March 28, 1967
Collection:
Facility Information Management
Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View southeast in winter showing the roof structure, and brick facing installed on the exterior walls of the Plant Research Laboratory (part of Phase 2 of campus construction).
Date:
February 27, 1967
Collection:
Facility Information Management
Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View east showing the interior of the Plant Research Laboratory during construction (part of Phase 2 of campus construction).
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View northeast showing roof structure, and brick facing installed on the exterior walls of the Plant Research Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View southwest during construction of the foundation for the Plant Research Laboratory (part of Phase 2 of campus construction).
Date:
October 26, 1966
Collection:
Facility Information Management
Access:
Public access


Site development, University of Illinois at Chicago Circle
Image nop
View southwest showing excavation of a pit in preparation for Phase 2 of campus construction.
Date:
July 28, 1966
Collection:
Facility Information Management
Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View southeast looking across the intersection of South Halsted and West Taylor Streets, showing construction of the foundation for the Plant Research Laboratory (part of Phase 2 of campus construction).
Date:
October 26, 1966
Collection:
Facility Information Management
Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View southeast looking across the intersection of South Halsted and West Taylor Streets, showing construction of the foundation for the Plant Research Laboratory (part of Phase 2 of campus construction).
Date:
September 30, 1966
Collection:
Facility Information Management
Access:
Public access


Library addition, University of Illinois at Chicago Circle
Image nop
View southeast showing the addition at the north end of the library (part of Phase 2 of campus construction).
Date:
March 28, 1968
Collection:
Facility Information Management
Access:
Public access


Library addition, University of Illinois at Chicago Circle
Image nop
View southeast showing the addition at the north end of the library (part of Phase 2 of campus construction). The entrance to the loading dock is at the lower right.
Date:
March 28, 1968
Collection:
Facility Information Management
Access:
Public access


Library addition, University of Illinois at Chicago Circle
Image nop
View of a space inside the Library addition at the north end of the building (part of Phase 2 of campus construction).
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Library addition, University of Illinois at Chicago Circle
Image nop
Library addition (part of Phase 2 of campus construction), showing open area and work areas.
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View looking south showing an excavated area south of the construction site for the Art & Architecture Building. Douglas Hall is at the upper right.
Date:
September 30, 1966
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View southwest during Phase 2 of campus construction, showing excavation of a site south of the Art & Architecture Building. Douglas Hall is partially visible at the right.
Date:
August 25, 1966
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View west during construction of the Art & Architecture Building (part of Phase 2 of campus construction). The Commonwealth Edison (ComEd) electric substation and University Hall are visible behind it.
Date:
August 25, 1966
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
Construction of the foundation of the Art & Architecture Building (part of Phase 2 of campus construction).
Date:
July 28, 1966
Collection:
Facility Information Management
Access:
Public access


Henry Hall, University of Illinois at Chicago Circle
Image nop
View of the second floor hallway and stairwells during interior construction of Classroom Building 626 (Henry Hall), part of Phase 2 of campus construction.
Date:
July 27, 1967
Collection:
Facility Information Management
Access:
Public access


Stevenson Hall, University of Illinois at Chicago Circle
Image nop
View northeast during the late stages of exterior construction of Classroom Building 627 (Stevenson Hall), part of Phase 2 of campus construction.
Date:
June 27, 1967
Collection:
Facility Information Management
Access:
Public access


Utilities Building addition, University of Illinois at Chicago Circle
Image nop
Workers constructing the foundation of an addition to the Utilities Building (part of Phase 3 of campus construction).
Date:
December 3, 1968
Collection:
Facility Information Management
Access:
Public access


Utilities Building addition, University of Illinois at Chicago Circle
Image nop
View north showing excavations in preparation for construction of an addition to the Utilities Building (part of Phase 3 of campus construction). University Hall is visible in the distance near the center of the photograph.
Date:
October 31, 1968
Collection:
Facility Information Management
Access:
Public access


Library addition, University of Illinois at Chicago Circle
Image nop
View southwest showing building of exterior brick walls, during later stages of construction of the addition at the north end of the library (part of Phase 2 of campus construction).
Date:
July 27, 1967
Collection:
Facility Information Management
Access:
Public access


Library addition, University of Illinois at Chicago Circle
Image nop
View northwest showing building the brick walls during construction of the addition at the south end of the library (part of Phase 2 of campus construction).
Date:
July 27, 1967
Collection:
Facility Information Management
Access:
Public access


Library addition, University of Illinois at Chicago Circle
Image nop
View during construction, showing the east facade of the addition at the south end of the library (part of Phase 2 of campus construction).
Date:
May 27, 1967
Collection:
Facility Information Management
Access:
Public access


Library addition, University of Illinois at Chicago Circle
Image nop
View in winter showing construction of the first floor of the addition at the north end of the library (part of Phase 2 of campus construction), at the upper right. Part of the elevated walkway system and Great Court are visible at the upper left. Stevenson Hall is at the lower left.
Date:
February 27, 1967
Collection:
Facility Information Management
Access:
Public access


Library addition, University of Illinois at Chicago Circle
Image nop
View southeast showing construction of the first floor of the addition at the north end of the library (part of Phase 2 of campus construction).
Date:
February 27, 1967
Collection:
Facility Information Management
Access:
Public access


Library addition, University of Illinois at Chicago Circle
Image nop
View northwest showing construction of the addition at the north end of the library (part of Phase 2 of campus construction). South Morgan Street and neighborhood buildings beyond it are visible at the upper right.
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Library addition, University of Illinois at Chicago Circle
Image nop
Concrete structural element visible during construction of additions to the Library (part of Phase 2 of campus construction).
Date:
December 29, 1966
Collection:
Facility Information Management
Access:
Public access


Library addition, University of Illinois at Chicago Circle
Image nop
View northwest in winter across South Morgan Street, showing construction of the first floor of the addition at the south end of the library (part of Phase 2 of campus construction).
Date:
December 29, 1966
Collection:
Facility Information Management
Access:
Public access


Library addition, University of Illinois at Chicago Circle
Image nop
View west towards South Morgan Street, showing the early stages of construction of the addition at the south end of the library (part of Phase 2 of campus construction).
Date:
August 25, 1966
Collection:
Facility Information Management
Access:
Public access


Library addition, University of Illinois at Chicago Circle
Image nop
Excavation for construction of the addition at the south end of the Library (part of Phase 2 of campus construction).
Date:
July 28, 1966
Collection:
Facility Information Management
Access:
Public access


Library addition, University of Illinois at Chicago Circle
Image nop
Staff work area in the library, located in the north end addition (part of Phase 2 of campus construction).
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access


Library addition, University of Illinois at Chicago Circle
Image nop
View at ground level inside the library's north end addition (part of Phase 2 of campus construction). Students are using typewriters and a library employee is at the left. A temporary wall divider is at the far right. The Lecture Center is visible outside the windows.
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access


Library addition, University of Illinois at Chicago Circle
Image nop
View of mechanical room during construction of the additions to the Library (part of Phase 2 of campus construction).
Date:
June 27, 1967
Collection:
Facility Information Management
Access:
Public access


Library addition, University of Illinois at Chicago Circle
Image nop
View northeast showing building of the brick walls during construction of the addition at the south end of the library (part of Phase 2 of campus construction).
Date:
June 27, 1967
Collection:
Facility Information Management
Access:
Public access


Library addition, University of Illinois at Chicago Circle
Image nop
View southeast showing construction of the fourth floor of the addition at the north end of the library (part of Phase 2 of campus construction).
Date:
May 27, 1967
Collection:
Facility Information Management
Access:
Public access


Library addition, University of Illinois at Chicago Circle
Image nop
View northeast showing construction of the addition at the south end of the library (part of Phase 2 of campus construction). The area that extends out at the right will enclose a stairway.
Date:
May 27, 1967
Collection:
Facility Information Management
Access:
Public access


Library addition, University of Illinois at Chicago Circle
Image nop
View northeast showing construction of the fourth floor of the addition at the south end of the library (part of Phase 2 of campus construction). University Hall is visible at the extreme left.
Date:
April 27, 1967
Collection:
Facility Information Management
Access:
Public access


Library addition, University of Illinois at Chicago Circle
Image nop
View northeast in winter showing construction of the second floor of the addition at the south end of the library (part of Phase 2 of campus construction). University Hall is at the upper left.
Date:
February 27, 1967
Collection:
Facility Information Management
Access:
Public access