Search for:


Search for:

Showing 1 - 50 of 425 Records
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of cupboards and countertops in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A blackboard is on the right.
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A blackboard has been mounted on the wall.
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a classroom, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A blackboard has been mounted on the back wall.
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northeast showing the completed exterior brick wall on the south facade, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The exterior concrete pylons and steel-frame roof structure are also visible.
Date:
July 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Construction work in progress on the second floor, including the installation of ductwork, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
March 28, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View in winter looking northeast from the elevated walkway, showing construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
February 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Workers on scaffolding during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). View is toward the south.
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View of the building's concrete structure, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
February 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View of debris on the balcony along the south wall of the Science & Engineering Laboratory (Phase 1 of campus construction), during construction of the center addition to that building (part of Phase 2 of campus construction).
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northwest from the elevated walkway during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Ground-level view in winter showing building foundation and sewer installation during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
December 29, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
November 25, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View west from South Halsted Street during early stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
November 25, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View southeast during early stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
October 26, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View east during early stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A planned south addition remained unbuilt.
Date:
October 26, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northwest showing construction of the foundation for the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). Part of the elevated walkway is visible at the upper left.
Date:
September 30, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View west showing construction of the foundation for the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A section of the elevated walkway is visible in the upper part of the photograph.
Date:
July 28, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northeast showing construction of the foundation for the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). South Halsted Street is at the upper right.
Date:
June 29, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View of scissor stairway during construction of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
April 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View of an office with built-in shelving, cupboards, and characteristic Block I windows in the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southwest from the Great Court showing exterior construction near completion on the Science & Engineering Offices building (part of Phase 2 of campus construction). Taft Hall is at the left, and the Library is at the right.
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View showing fire damage at top of site during construction of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
May 24, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the fifth floor of the Science & Engineering Offices building (part of Phase 2 of campus construction). The southwest gateway to the campus at South Morgan Street is in the foreground, featuring a brick-paved plaza, granite benches, granite bollards, and a fence designed by Walter Netsch. Divided horizontally into three sections, the fence features vertical members spaced further and further apart as it rises, a design theme echoed in the three-stepped structure of University Hall.
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
Detail of exterior concrete wall at the Science & Engineering Offices building (built during Phase 2 of campus construction).
Date:
November 25, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the fourth floor of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
December 29, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southwest during construction of the first floor of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
September 30, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View northwest showing construction of the foundation for the Science & Engineering Offices building (part of Phase 2 of campus construction), with forms for poured concrete visible. Neighborhood buildings across South Morgan Street are visible in the upper part of the photograph.
Date:
August 25, 1966
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View from below during work on a large pyramid-shaped skylight at the south end of the Art & Architecture Building (part of Phase 2 of campus construction).
Date:
April 25, 1968
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View east along the enclosed elevated walkway connecting the Art & Architecture Building with the main spine of the campus walkway system, during installation of windows (part of Phase 2 of campus construction).
Date:
March 28, 1968
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View of hallway with stairs in the Art & Architecture Building, during installation of tile flooring (part of Phase 2 of campus construction).
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View on the first floor of the Art & Architecture Building, showing a hallway with stairways during installation of tile flooring (part of Phase 2 of campus construction).
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View during late stages of construction of the Art & Architecture Building (part of Phase 2 of campus construction), showing a basement studio on the east side of the building, with open views to the first and second floors (in the distance at top center).
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View of the granite-floored first floor gallery adjacent to the main entrance of the Art & Architecture Building, during late stages of construction (part of Phase 2 of campus construction).
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View during late stages of construction of the Art & Architecture Building (part of Phase 2 of campus construction), showing a second floor studio with a concrete staircase up to the third floor.
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View north showing scaffolding in place for construction of cinder block walls in the Art & Architecture Building (part of Phase 2 of campus construction).
Date:
July 27, 1967
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View north during construction of the upper levels of the Art & Architecture Building (part of Phase 2 of campus construction), with an excavated area to the south of it in the foreground. A corner of Douglas Hall is visible at the far left.
Date:
April 27, 1967
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View east towards the downtown Loop showing construction in progress on the Art & Architecture Building (part of Phase 2 of campus construction). The elevated walkway is visible at the bottom of the photograph, and a number of campus buildings are at the far right: the Union building and Tower (now Student Center East and Tower), and Douglas and Grant Halls. West Harrison Street runs up the left side of the image, and the intersection with South Halsted Street is at the middle left. The Dan Ryan Expressway (I-94) and part of the Circle interchange are in the upper part of the photograph, beyond Halsted Street. The old Post Office is at the top left.
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View northwest in winter during construction of the Art & Architecture Building (part of Phase 2 of campus construction). Jefferson Hall is visible at the upper left. The elevated walkway runs in front of it and over West Harrison Street, leading to the CTA train station.
Date:
December 29, 1966
Collection:
Facility Information Management
Access:
Public access


Excavated site, University of Illinois at Chicago Circle
Image nop
Construction of underground infrastructure in an excavated site south of the Art & Architecture Building, during Phase 2 of campus construction.
Date:
November 25, 1966
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View southwest showing construction of the lower level walls for the Art & Architecture Building (part of Phase 2 of campus construction). Several campus buildings are visible in the distance, including the Union Tower (Student Center East Tower) and Union (Student Center East) at the left. Douglas Hall stands to the right of these.
Date:
September 30, 1966
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View northeast showing construction of the foundation and lower level walls of the Art & Architecture Building (part of Phase 2 of campus construction).
Date:
August 25, 1966
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View southwest showing construction of the foundation of the Art & Architecture Building (part of Phase 2 of campus construction). Douglas Hall is at the top center of the photograph, and Grant Hall is to the right.
Date:
July 28, 1966
Collection:
Facility Information Management
Access:
Public access


Stevenson Hall, University of Illinois at Chicago Circle
Image nop
View looking west during construction of the foundation of Classroom Building 627 (Stevenson Hall), part of Phase 2 of campus construction.
Date:
July 28, 1966
Collection:
Facility Information Management
Access:
Public access


Henry Hall, University of Illinois at Chicago Circle, Phase 2
Image nop
View northeast during construction of Classroom Building 626 (Henry Hall), part of Phase 2 of campus construction. The building's concrete frame and ceilings are completed. Part of Jefferson Hall is visible at the far right.
Date:
October 26, 1966
Collection:
Facility Information Management
Access:
Public access


Henry Hall, University of Illinois at Chicago Circle, Phase 2
Image nop
View southwest showing construction of the ceiling for Classroom Building 626 (Henry Hall) during Phase 2 of campus construction. University Hall is partially visible at the top of the photograph.
Date:
July 28, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Preparations for installation of a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View of a laboratory in the later stages of installation, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access