Search for:


Search for:

Showing 251 - 300 of 404 Records
Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest in winter during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the steel framework in place for the roof structure and vertical supports. The office area with its open atrium is visible near the center, and the swimming pool is to the right of that. Roosevelt Road is at the top of the photograph.
Date:
February 21, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast in winter during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the west part of the building with steel framework in place for the roof structure and vertical supports. Roosevelt Road is at the top of the photograph, and South Morgan Street is at the left.
Date:
February 21, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing concrete columns and installation of pipes.
Date:
January 23, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing installation of pipes and electrical conduit in a space with a coffered concrete ceiling. Cinder blocks are stacked on the floor.
Date:
January 23, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest in winter during construction of the Physical Education Building (part of Phase 3 of campus construction), showing steel framing in place for the building's roof structure.
Date:
January 23, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View of pipes and ductwork in a mechanical room during construction of the Physical Education Building (part of Phase 3 of campus construction).
Date:
December 22, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the Physical Education Building (part of Phase 3 of campus construction). The swimming pool is in the upper part of the photograph. Roosevelt Road is at the left.
Date:
November 16, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast showing the foundation and first floor of the Physical Education Building during construction (part of Phase 3 of campus construction). Science & Engineering South is beyond the construction site at the left, and Saint Francis of Assisi Church is at the far right.The downtown Loop skyline is in the distance.
Date:
September 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View east during early stages of construction of the Physical Education Building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is at the center of the image, behind the construction site.
Date:
August 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). South Morgan Street is at the lower left, and Roosevelt Road runs diagonally across the upper part of the image. Saint Francis of Assisi Church is at the upper right.
Date:
July 16, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). Roosevelt Road runs across the center of the image, and Saint Francis of Assisi Church is at the right.
Date:
May 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is in the background.
Date:
April 22, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north during early stages of construction of the Physical Education Building (part of Phase 3 of campus construction).
Date:
April 22, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View east during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is behind the construction site.
Date:
March 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north showing excavations in preparation for construction of the Physical Education Building (part of Phase 3 of campus construction). The Science & Engineering Offices building is in the distance at the upper left.
Date:
January 22, 1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View west in winter showing early stages of construction of the Theater, part of the Education & Communications Building (built during Phase 3 of campus construction). University Hall is partially visible at the upper right.
Date:
1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest in winter during early stages of construction of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View southwest in winter showing early stages of construction of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest in winter during early stages of construction of the Education & Communications Building and Theater (part of Phase 3 of campus construction). The intersection of West Harrison Street and South Morgan Street is at the lower right of the image, and the Eisenhower Expressway (I-290) and CTA train tracks are to the right of the construction site, in the upper part of the image.
Date:
1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
Close view during construction of the foundation for the Education & Communications Building (part of Phase 3 of campus construction).
Date:
1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest during earlier stages of construction of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
July 28, 1971
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View during construction of classrooms in the Education & Communications Building (part of Phase 3 of campus construction). Sliding room dividers on a ceiling-mounted track allow the space to be divided in two.
Date:
April 6, 1971
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View during construction on the upper level of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
April 6, 1971
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View towards the back of a lecture hall at the Education & Communications Building (built during Phase 3 of campus construction), showing installation of seating on concrete risers. This space is now also used as a recital hall.
Date:
February 1, 1971
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View towards the back of the Rehearsal Hall at the Education & Communications Building (part of Phase 3 of campus construction), showing the exit staircases and decorative cinder block facing on the walls.
Date:
February 1, 1971
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View of a hallway with cinder-block walls, during construction of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
December 29, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest from University Hall, during late stages of construction of the Education & Communications Building and Theater (part of Phase 3 of campus construction). West Harrison Street extends along the left side of the image, and the Eisenhower Expressway (I-290) is to the right of the building site. At the lower right, a section of elevated walkway leads from the Education & Communications Building across South Morgan Street.
Date:
December 29, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View from the sidewalk on the northside of West Harrison Street, during construction on the section of elevated walkway which runs from the second level of Education & Communications Building, over South Morgan Street, and down to street level at West Harrison Street.
Date:
December 29, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View west along West Congress Parkway showing the Education & Communications Building during late stages of construction (part of Phase 3 of campus construction).
Date:
December 2, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View of a mechanical room with equipment to be installed, during construction of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
October 30, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Education & Communications Building (part of Phase 3 of campus construction), showing installation of ductwork in an interior space.
Date:
March 30, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northeast across West Harrison Street showing construction of the Theater, part of the Education & Communications Building (Phase 3 of campus construction).
Date:
March 30, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View east during of construction of the Theater, part of the Education & Communications Building (part of Phase 3 of campus construction). University Hall is in the distance at the right.
Date:
March 30, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northeast during early stages of construction of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
March 30, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the Education & Communications Building (part of Phase 3 of campus construction). The building site is bordered by West Harrison Street on the left, and the Eisenhower Expressway (I-290) and CTA train tracks on the right. The intersection of West Harrison Street and South Morgan Street is at the lower center. Part of the Behavioral Sciences Building is visible at the far left.
Date:
February 27, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northeast showing construction of the foundation of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
January 28, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the foundation of the Education & Communications Building (part of Phase 3 of campus construction). The Behavioral Sciences Building is beyond it at the right, and University Hall is at the far left.
Date:
January 28, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the foundation of the Education & Communications Building (part of Phase 3 of campus construction). University Hall is at the top right.
Date:
August 27, 1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View west during site preparations for construction of the Education & Communications Building (part of Phase 3 of campus construction). West Harrison Street is at the far left of the image.
Date:
July 29, 1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View southeast during site preparations for construction of the Education & Communications Building (part of Phase 3 of campus construction). West Harrison Street is at the right, and University Hall is at the upper right.
Date:
June 30, 1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View southwest during site preparations for construction of the Education & Communications Building, including excavation and removal of old concrete foundations (part of Phase 3 of campus construction).
Date:
June 30, 1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest during site preparations for construction of the Education & Communications Building (part of Phase 3 of campus construction). The intersection of West Harrison Street and South Morgan Street is at the lower right, and the Eisenhower Expressway (I-290) extends across the image from the far lower to upper left. Part of the Behavioral Sciences Building is at the lower left.
Date:
June 30, 1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View west during construction of the foundation of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
September 30, 1969
Collection:
Facility Information Management
Access:
Public access


Proposed Student Services Classroom/Office Building, University of Illinois at Chicago Circle
Image nop
Second floor plan for the proposed (Phase 3 of campus construction) Student Services Building and Classroom/Office Building, with ventilation schedule.
Date:
1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building showing the main swimming pool near completion. There are spectator bleachers along the sides, and the steel-frame roof structure is also visible.
Date:
November 25, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the Physical Education Building (part of Phase 3 of campus construction), showing exterior work near completion. In the foreground, workers are building driveways for vehicle access to the building.
Date:
October 23, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing a locker room with a coffered concrete ceiling. Lockers were later installed on the raised concrete slabs between the benches.
Date:
September 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing a locker room with a coffered concrete ceiling. Lockers will be installed on the low raised slabs.
Date:
September 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View of the gymnasium during construction of the Physical Education Building (part of Phase 3 of campus construction). The steel-frame roof structure is visible.
Date:
August 20, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing a work area with wooden sawhorses.
Date:
July 22, 1970
Collection:
Facility Information Management
Access:
Public access