Search for:


Search for:

Showing 201 - 250 of 5492 Records
Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north in winter during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the west part of the building with steel framework in place for the roof structure and vertical supports. The office area with its open atrium is visible at the right. Roosevelt Road is at the top of the photograph.
Date:
February 21, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View south in winter during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the steel framework in place for the roof structure and vertical supports. Roosevelt Road is at the bottom of the photograph.
Date:
February 21, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
Construction of a locker room with a coffered concrete ceiling during construction of the Physical Education Building (part of Phase 3 of campus construction). Lockers were installed on the low raised slabs.
Date:
January 23, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southwest during construction of the Physical Education Building (part of Phase 3 of campus construction). The swimming pool is visible near the center of the image. Roosevelt Road is at the right, and South Morgan Street is at the top of the image.
Date:
November 16, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north during construction of the first floor of the Physical Education Building (part of Phase 3 of campus construction). Science & Engineering South is beyond it at the right.
Date:
September 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast showing the foundation of the Physical Education Building in the foreground, and work in progress on the first floor of the building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is at the left.
Date:
September 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast from Roosevelt Road showing construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is at the left.
Date:
August 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the first floor of the Physical Education Building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is at the upper right, and the downtown Loop skyline is visible in the distance at the left.
Date:
August 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). Roosevelt Road runs across the upper part of the image, and Parking Lot 5C and Science & Engineering South are visible at the top.
Date:
July 16, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View east during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is at the upper center.
Date:
May 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). The Science & Engineering Offices building is in the distance at the left.
Date:
May 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). The Science & Engineering Offices building is visible in the distance at the right.
Date:
May 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest showing excavations and preparations for construction of the Physical Education Building (part of Phase 3 of campus construction).
Date:
February 20, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest showing an excavated site along the south side of Roosevelt Road, in preparation for construction of the Physical Education Building (part of Phase 3 of campus construction).
Date:
January 22, 1969
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of cupboards and countertops in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A blackboard is on the right.
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A blackboard has been mounted on the wall.
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a classroom, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A blackboard has been mounted on the back wall.
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northwest showing the completed exterior brick wall on the of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The exterior concrete pylons and steel-framed roof structure are also visible. South Taylor Street is at the far right.
Date:
November 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of built-in furniture in a classroom laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
September 29, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northeast showing the completed exterior brick wall on the south facade, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The exterior concrete pylons and steel-frame roof structure are also visible.
Date:
July 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View west from South Halsted Street showing the completed exterior brick walls for the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The exterior concrete pylons and steel-framed roof structure are also visible.
Date:
June 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction), showing completed exterior brick walls. The exterior concrete pylons and steel-framed roof structure are also visible.
Date:
June 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction), showing work in progress on the exterior brick walls. The exterior concrete pylons and steel-frame roof structure are also visible.
Date:
May 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction), showing work in progress on the exterior brick walls. The exterior concrete pylons and steel-framed roof structure are also visible.
Date:
May 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Construction work in progress on the second floor, including the installation of ductwork, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
March 28, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View in winter looking northeast from the elevated walkway, showing construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
February 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Workers on scaffolding during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). View is toward the south.
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View of the building's concrete structure, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
February 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View of debris on the balcony along the south wall of the Science & Engineering Laboratory (Phase 1 of campus construction), during construction of the center addition to that building (part of Phase 2 of campus construction).
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northwest from the elevated walkway during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Ground-level view in winter showing building foundation and sewer installation during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
December 29, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
November 25, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View west from South Halsted Street during early stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
November 25, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View southeast during early stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
October 26, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View east during early stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A planned south addition remained unbuilt.
Date:
October 26, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northwest showing construction of the foundation for the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). Part of the elevated walkway is visible at the upper left.
Date:
September 30, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View west showing construction of the foundation for the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A section of the elevated walkway is visible in the upper part of the photograph.
Date:
July 28, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northeast showing construction of the foundation for the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). South Halsted Street is at the upper right.
Date:
June 29, 1966
Collection:
Facility Information Management
Access:
Public access


Campus entrance at Halsted Street, University of Illinois at Chicago Circle
Image nop
View northeast showing a campus entrance area west of South Halsted Street, near West Harrison Street. A fence marks the campus perimeter along Halsted, and a number of low granite benches are in front of that. The downtown Loop skyline is visible in the distance.
Date:
1960s
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View of scissor stairway during construction of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
April 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View of an office with built-in shelving, cupboards, and characteristic Block I windows in the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southwest from the Great Court showing exterior construction near completion on the Science & Engineering Offices building (part of Phase 2 of campus construction). Taft Hall is at the left, and the Library is at the right.
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View northeast across South Morgan Street showing the completed Science & Engineering Offices building (part of Phase 2 of campus construction). The brick wall marking the campus' west perimeter is in the foreground, and the Library is visible to the left.
Date:
December 29, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View northwest showing exterior construction near completion on the Science & Engineering Offices building (part of Phase 2 of campus construction). The Library and the Staff and Administrative Offices Building (University Hall) are behind it to the right.
Date:
November 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View north showing an excavation for underground work adjacent to the north side of the Science & Engineering Offices building (part of Phase 2 of campus construction). The south end of the Library is at the upper left.
Date:
September 29, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southwest during construction of the thirteenth floor of the Science & Engineering Offices building (part of Phase 2 of campus construction). Concrete-framed window panels have been installed on a number of the building's floors. Burnham Hall is in the left foreground.
Date:
August 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View showing fire damage at top of site during construction of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
May 24, 1967
Collection:
Facility Information Management
Access:
Public access