Search for:


Search for:

Showing 151 - 200 of 670 Records
Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View east towards the downtown Loop, showing early stages of construction of the Art & Architecture Building (part of Phase 2 of campus construction).
Date:
October 26, 1966
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View southeast showing early stages of construction of the Art & Architecture Building (part of Phase 2 of campus construction). The Union and Union Tower (now Student Center East and Student Center East Tower) are in the distance in the upper center.
Date:
October 26, 1966
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View southeast showing excavations south of the Art & Architecture Building (part of Phase 2 of campus construction). Douglas Hall is at the upper right.
Date:
October 26, 1966
Collection:
Facility Information Management
Access:
Public access


Henry Hall, University of Illinois at Chicago Circle, Phase 2
Image nop
View northeast from the elevated walkway showing construction of the first and second floors of Classroom Building 626 (Henry Hall), built during Phase 2 of campus construction. Jefferson Hall is behind it to the right.
Date:
July 28, 1966
Collection:
Facility Information Management
Access:
Public access


Henry Hall, University of Illinois at Chicago Circle, Phase 2
Image nop
View southeast showing construction of the first floor of Classroom Building 626 (Henry Hall), part of Phase 2 of campus construction. Jefferson Hall is behind it at the upper left.
Date:
June 29, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
March 28, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View along a hallway looking towards an entrance to the building, during late stages of construction on the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
March 28, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a classroom, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View of a laboratory in the later stages of installation with plumbing work in progress, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View of a laboratory in the later stages of installation, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View of a stairway in the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
December 29, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of pipes, countertops and hardware including faucets for a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
September 29, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northeast showing the completed exterior brick wall on the south facade, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The exterior concrete pylons and steel-frame roof structure are also visible.
Date:
September 29, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of ductwork during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
August 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northeast showing the completed exterior brick wall on the south facade, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The exterior concrete pylons and steel-framed roof structure are also visible.
Date:
August 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View of the completed exterior brick wall on the south facade, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The exterior concrete pylons and steel-framed roof structure are also visible.
Date:
July 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View west during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction), showing work nearing completion on the exterior brick walls. The exterior concrete pylons and steel-framed roof structure are also visible.
Date:
May 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction), showing the steel-frame roof structure from below.
Date:
April 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction), showing work in progress on the exterior brick walls. The exterior concrete pylons and steel-framed roof structure are also visible.
Date:
April 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Construction work in progress on the third floor, including the installation of ductwork, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
March 28, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Southeast corner of the building during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction), showing exterior walls being built and scaffolding around the large concrete piers. A planned south addition remained unbuilt.
Date:
March 28, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of electrical systems, ductwork and pipes on the third floor, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
March 28, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of pipes during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northeast in winter during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A planned south addition remained unbuilt.
Date:
December 29, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View southeast showing construction of the foundation for the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The elevated walkway is visible in the upper part of the photograph.
Date:
August 25, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View west showing excavations and construction of the foundation for the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A planned south addition remained unbuilt.
Date:
June 29, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southwest showing exterior construction completed at the Science & Engineering Offices building (part of Phase 2 of campus construction). A corner of Burnham Hall is in the left foreground.
Date:
March 28, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View northeast across South Morgan Street, showing exterior construction completed at the Science & Engineering Offices building (part of Phase 2 of campus construction). The brick wall around the campus' west perimeter is visible.
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southeast across South Morgan Street, showing exterior construction near completion at the Science & Engineering Offices building (part of Phase 2 of campus construction). The scissor staircase, a unique feature of Netsch's design, is visible. The southwest entrance to the campus is visible in the left foreground, and the brick wall marking the campus perimeter is visible at the lower right.
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View northwest in winter showing exterior construction near completion on the Science & Engineering Offices building (part of Phase 2 of campus construction). The Library and the Staff and Administrative Offices Building (University Hall) are behind it to the right.
Date:
December 29, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southeast from South Morgan Street during construction of the thirteenth floor of the Science & Engineering Offices building (part of Phase 2 of campus construction). The scissor stair is also visible under construction. Concrete window panels have been installed on most of the building's floors. A corner of the Library is just visible at the left.
Date:
October 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southeast from South Morgan Street during construction of the thirteenth floor of the Science & Engineering Offices building (part of Phase 2 of campus construction). The scissor stair is also visible under construction. Concrete window panels have been installed on a number of the building's floors. A corner of the Library is visible at the left.
Date:
September 29, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the eleventh floor of the Science & Engineering Offices building (part of Phase 2 of campus construction). The scissor stair is also visible under construction. Concrete-framed window panels have been installed on a number of floors.
Date:
July 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
Detail showing fire damage at site during construction of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
May 24, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View showing fire damage at top of site during construction of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
May 24, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southwest during construction of the seventh floor of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
March 28, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the fifth floor of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
February 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southwest in winter during construction of the fourth floor of the Science & Engineering Offices building (part of Phase 2 of campus construction). Part of the Science & Engineering Laboratory is visible at the extreme left.
Date:
December 29, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View during construction of the first floor of the Science & Engineering Offices building (part of Phase 2 of campus construction) with reinforcing visible.
Date:
October 26, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the first floor of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
September 30, 1966
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View from below during work on a cone-shaped skylight in the Art & Architecture Building (part of Phase 2 of campus construction).
Date:
March 28, 1968
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View during construction of pyramid-shaped skylights on the roof of the Art & Architecture Building (part of Phase 2 of campus construction).
Date:
March 28, 1968
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View of a fourth floor studio in the Art & Architecture Building, during late stages of construction (part of Phase 2 of campus construction).
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access


Elevated walkway, University of Illinois at Chicago Circle
Image nop
View in winter showing the enclosed elevated walkway from the Art & Architecture Building where it meets the main spine of the campus walkway system. A flight of stairs connects the main walkway with the enclosed section. Access to the enclosed section of the walkway has been barricaded off for winter.
Date:
December 29, 1967
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View northeast during later stages of construction of the Art & Architecture Building (part of Phase 2 of campus construction). Scaffolding is in place for the installation of brick facing on the exterior walls of the building.
Date:
November 27, 1967
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View on the roof of the Art & Architecture Building, with workers installing brick facing on the exterior of the building (part of Phase 2 of campus construction). A number of skylights are in the foreground.
Date:
October 25, 1967
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View northeast during installation of brick facing on the exterior walls at the west side of the Art & Architecture Building (part of Phase 2 of campus construction).
Date:
August 25, 1967
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View showing scaffolding in place during installation of brick facing on exterior walls of the Art & Architecture Building (part of Phase 2 of campus construction).
Date:
August 25, 1967
Collection:
Facility Information Management
Access:
Public access