Search for:


Search for:

Showing 151 - 200 of 404 Records
Physical Education Building, University of Illinois at Chicago Circle
Image nop
View of a mechanical room during construction of the Physical Education Building (part of Phase 3 of campus construction).
Date:
April 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the Physical Education Building, showing the roof installed over the steel structure above the swimming pool. Workers are installing brickwork.
Date:
March 21, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast in winter from inside the swimming pool, during construction of the Physical Education Building (part of Phase 3 of campus construction). The steel beams for the roof structure are visible in the upper part of the photograph. Neighborhood buildings are in the distance.
Date:
January 23, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View showing electrical conduit, ductwork, and pipes during construction of the Physical Education Building (part of Phase 3 of campus construction).
Date:
December 22, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the Physical Education Building (part of Phase 3 of campus construction). Steel framing for the roof structure and vertical supports is visible.
Date:
December 22, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View south during construction of the Physical Education Building (part of Phase 3 of campus construction), with the swimming pool visible towards the left. Roosevelt Road runs across the image, and part of South Morgan Street is at the upper right. Parking Lot 5C is at the bottom of the photograph.
Date:
November 16, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast showing construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction).
Date:
September 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). Roosevelt Road is visible at the center of the image.
Date:
June 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest during early stages of construction of the Physical Education Building (part of Phase 3 of campus construction). Roosevelt Road is visible near the center of the image.
Date:
March 19, 1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northeast in winter showing early stages of construction of the Theater, part of the Education & Communications Building (built during Phase 3 of campus construction).
Date:
1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View southwest in winter showing construction of the foundation of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest showing construction of the foundation for the Education & Communications Building (part of Phase 3 of campus construction).
Date:
1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View southwest showing construction of the foundation of the Education & Communications Building (part of Phase 3 of campus construction). The Behavioral Sciences Building is behind it at the upper left.
Date:
1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View southeast showing construction of the foundation for the Education & Communications Building (part of Phase 3 of campus construction). University Hall is at the upper right.
Date:
1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the foundations for the Education & Communications Building (part of Phase 3 of campus construction). The West Harrison Street sidewalk is at the lower left corner.
Date:
1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View of a gymnasium at the Physical Education Building (built during Phase 3 of campus construction), with students playing basketball.
Date:
December 29, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View showing drywall installed in a hallway of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
December 29, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View looking west along a covered walkway on the south side of the second level of the Education & Communications Building (built during Phase 3 of campus construction). This walkway was planned to connect with the section of elevated walkway that crossed over South Morgan Street adjacent to the building.
Date:
October 30, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View west along West Congress Parkway showing construction of the upper levels of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
September 2, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
Scaffolding in place for the installation of brick facing to the exterior of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
July 7, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View southwest along West Congress Parkway showing construction of the second floor of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
July 7, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the upper levels of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
July 7, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View southwest from West Congress Parkway showing construction of the second floor of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
June 2, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View southwest from West Congress Parkway during construction of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
April 28, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
March 30, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
February 27, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View west during construction of the foundation of the Education & Communications Building (part of Phase 3 of campus construction). West Harrison Street is at the upper left.
Date:
August 27, 1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest during site preparations for construction of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
July 29, 1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest during site preparations for construction of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
July 29, 1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northeast during site preparations for construction of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
June 30, 1969
Collection:
Facility Information Management
Access:
Public access


Theater entrance, University of Illinois at Chicago
Image nop
View showing the entrance to the Theater. Part of the Education, Performing Arts, and Social Work Building (now Education, Theatre, Music and Social Work) is at the right.
Date:
1990s
Collection:
Facility Information Management
Access:
Public access


Proposed Student Services Classroom-Office Building, University of Illinois at Chicago Circle
Image nop
Second floor plan for the proposed (Phase 3 of campus construction) Student Services Building Classroom-Office Building, with Classroom Office Building (COB) Annex, roof plan, door schedule, and Classroom Office Building (COB) room finish schedule.
Date:
1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building showing the main swimming pool near completion. There are spectator bleachers along the sides, and behind the pool's deep end.
Date:
November 25, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest showing the south side of the Physical Education Building (part of Phase 3 of campus construction), with exterior construction completed. In the foreground, an access lane for vehicles runs behind the building.
Date:
November 25, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View of the smaller swimming pool during construction of the Physical Education Building, showing the completed roof and interior brickwork on the walls.
Date:
July 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View of the gymnasium during construction of the Physical Education Building (part of Phase 3 of campus construction). The steel-frame roof structure is visible.
Date:
July 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the gymnasium with the roof installed over the steel support structure.
Date:
May 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building, showing the completed roof over the swimming pool and interior brickwork.
Date:
April 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the completed roof over the gymnasium.
Date:
April 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the gymnasium roof installed over the steel structure.
Date:
March 21, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View south during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the roof installed over the steel structure on the west part of the building. The steel roof structure is visible over the swimming pool at the left. Roosevelt Road is in the lower part of the photograph. South Morgan Street is at the upper right.
Date:
March 21, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View showing coffered concrete ceiling and installation of pipes during construction of the Physical Education Building (part of Phase 3 of campus construction).
Date:
January 23, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast in winter during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the building's steel framing. Saint Francis of Assisi Church is in the distance at the left.
Date:
January 23, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast from inside the swimming pool during construction of the Physical Education Building (part of Phase 3 of campus construction), showing steel framing above for the roof structure.
Date:
December 22, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southwest during construction of the Physical Education Building (part of Phase 3 of campus construction). The swimming pool is on the left side of the building. Roosevelt Road runs diagonally across the lower part of the photograph, and the intersection with South Morgan Street is visible at the far right.
Date:
November 16, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during early stages of construction of the Physical Education Building (part of Phase 3 of campus construction). The swimming pool is visible near the top of the photograph, with a construction crane working in it. Roosevelt Road is at the left.
Date:
October 18, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast showing early stages of construction of the Physical Education Building (part of Phase 3 of campus construction). The swimming pool is at the left, with a construction crane working in it. Roosevelt Road is at the bottom of the photograph.
Date:
October 18, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest showing poured concrete for the first floor of the Physical Education Building (part of Phase 3 of campus construction).
Date:
September 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast showing the foundation of the Physical Education Building during construction (part of Phase 3 of campus construction). The Science & Engineering Laboratory and Science & Engineering South are behind it, and the downtown Loop skyline is visible in the distance.
Date:
September 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during early stages of construction of the Physical Education Building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is near the center of the image.
Date:
August 19, 1969
Collection:
Facility Information Management
Access:
Public access