Skip to content
Home
Collections
Digital Exhibits
Help
Contact Us
Login
UIC Library Digital Collections (Beta)
Basic
Advanced
Search in fulltext
Search
Search for
:
Objects
Collections
Field
Any
Title
Creator
Contributor
Description
Identifier
Address
Building Name
Geographic Location
Collection
Subject--Genre
Subject--Name
Subject--Topic
Collection Code
Series
Condition
Must
Must not
Should
Type of search
Contain
Equal
Starts with
Value
Value
Value
Value
Add more criteria
Search for
:
Objects
Collections
Clear
Search
Display
List
Timeline
Gallery
Map
Showing
101 - 150 of 927
Records
Sort by
:
Number of results to display
:
Filter
1
Library addition, University of Illinois at Chicago Circle
Image
nop
View west towards South Morgan Street, showing the early stages of construction of the addition at the south end of the library (part of Phase 2 of campus construction).
Date
:
September 30, 1966
Collection
:
Facility Information Management
Access
:
Public access
Library addition, University of Illinois at Chicago Circle
Image
nop
View west towards South Morgan Street, showing the site at the south end of the library before construction of the addition (part of Phase 2 of campus construction).
Date
:
June 29, 1966
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View of a glass-enclosed bulletin board mounted in the center of a hallway, during late stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
March 28, 1968
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View along a hallway looking towards an entrance to the building, during late stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
March 28, 1968
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
Installation of cabinetry and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
February 22, 1968
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
February 22, 1968
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
February 22, 1968
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
February 22, 1968
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View showing installation of cabinetry and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
January 25, 1968
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View of the completed exterior brick wall on the east facade, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
July 27, 1967
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
Installation of electrical systems, ductwork and pipes on the third floor, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
March 28, 1967
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
Basement mechanical room during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
March 28, 1967
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View of the building interior during the construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
February 27, 1967
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View of construction debris on the balcony along the south wall of Science & Engineering Laboratory (Phase 1 of campus construction), during construction of the center addition to the Science and Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
January 25, 1967
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
Installation of ductwork and pipes during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
January 25, 1967
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View northwest during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
January 25, 1967
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View southwest during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
December 29, 1966
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View south showing installation of a poured concrete floor during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). West Taylor Street is visible at the top of the photograph.
Date
:
November 25, 1966
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View west from South Halsted Street during early stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
November 25, 1966
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View southeast during early stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The intersection of West Taylor Street and South Halsted Street is visible at the upper left.
Date
:
September 30, 1966
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View southeast during early stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
September 30, 1966
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View northeast during early stages of construction of the center addition to the Science & Engineering Laboratory, part of Phase 2 of campus construction.
Date
:
September 30, 1966
Collection
:
Facility Information Management
Access
:
Public access
Jane Addams' Hull-House Restoration, University of Illinois at Chicago Circle
Image
nop
Restoration of the Charles J. Hull Mansion (now Jane Addams' Hull-House Museum) showing a view of the first floor with a fireplace and windows.
Date
:
September 26, 1966
Collection
:
Facility Information Management
Access
:
Public access
Parking Lot, University of Illinois at Chicago Circle
Image
nop
View of the entrance to Parking Lot 1A, looking southwest from West Harrison Street.
Date
:
May 27, 1967
Collection
:
Facility Information Management
Access
:
Public access
Parking Lots, University of Illinois at Chicago Circle
Image
nop
View northwest showing university parking lots located between West Harrison Street, at the left, and the Eisenhower Expressway (I-290), to the right. Parking Lot 11, near the lower center of the photograph has cars parked on it; another parking lot and the Racine Avenue Building are beyond it. Parking Lots 1A and 1B are partially visible at the far left, and the intersection of West Harrison Street and South Racine Avenue is at the upper left.
Date
:
May 27, 1967
Collection
:
Facility Information Management
Access
:
Public access
Parking Lot, University of Illinois at Chicago Circle
Image
nop
View southwest in winter towards the intersection of South Racine Avenue and West Harrison Street, during Phase 2 of campus construction. A parking lot is under construction in the foreground. This site is now the location of the UIC Pavilion.
Date
:
January 4, 1967
Collection
:
Facility Information Management
Access
:
Public access
Parking Lot, University of Illinois at Chicago Circle
Image
nop
View southwest during construction of a parking lot at the northeast corner of West Harrison Street and South Racine Avenue. Racine Avenue runs across the top of the photograph, and the intersection with West Harrison Street is near the top center. This site is now occupied by the UIC Pavilion.
Date
:
November 26, 1966
Collection
:
Facility Information Management
Access
:
Public access
Art & Architecture Building, University of Illinois at Chicago Circle
Image
nop
View northeast showing part of the north end of the Art & Architecture Building (built during Phase 2 of campus construction) before exterior landscaping.
Date
:
May 28, 1968
Collection
:
Facility Information Management
Access
:
Public access
Site development, University of Illinois at Chicago Circle
Image
nop
View northwest showing demolition of existing building located on a parcel of land between West Harrison Street (lower left) and the Eisenhower Expressway (upper right), during Phase 2 of campus construction. The Education & Communications Building (now Education, Theatre, Music, and Social Work, ETMSW) would later be built on this site.
Date
:
July 28, 1966
Collection
:
Facility Information Management
Access
:
Public access
Plant Research Laboratory, University of Illinois at Chicago Circle
Image
nop
View southeast looking across the intersection of South Halsted and West Taylor Streets, showing site preparations for the Plant Research Laboratory (part of Phase 2 of campus construction).
Date
:
June 29, 1966
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
Preparations for installation of a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
February 22, 1968
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View of a laboratory in the later stages of installation, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
January 25, 1968
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
Installation of pipes, countertops and hardware including faucets for a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
July 27, 1967
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
Building in progress on the south facade exterior brick walls, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
April 27, 1967
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View east during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction), showing the completed exterior brick wall on the west facade.
Date
:
April 27, 1967
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
Building interior during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
February 27, 1967
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View east during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
February 27, 1967
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View north along the elevated walkway during construction of the upper levels of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
January 25, 1967
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
Installation of ductwork and pipes during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
January 25, 1967
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View northeast during construction of the third floor of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
January 25, 1967
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View southeast in winter from the balcony of the original building (part of Phase 1 of campus construction), during work on the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
December 29, 1966
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View southeast during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). South Halsted Street is in the distance in the upper part of the photograph.
Date
:
November 25, 1966
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View northwest during site preparations for construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
June 1, 1966
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Offices, University of Illinois at Chicago Circle
Image
nop
View southeast showing exterior construction completed at the Science & Engineering Offices building (part of Phase 2 of campus construction). The southwest entrance to the campus from South Morgan Street is visible in the foreground, and the brick wall that marks the campus' west perimeter is at the right.
Date
:
April 25, 1968
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Offices, University of Illinois at Chicago Circle
Image
nop
View west during construction showing a space with ground floor windows on the north side of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date
:
March 28, 1968
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Offices, University of Illinois at Chicago Circle
Image
nop
View of an office in the Science & Engineering Offices building with built-in shelving and cabinets. The narrow windows feature the Block I design.
Date
:
February 22, 1968
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Offices, University of Illinois at Chicago Circle
Image
nop
View northwest showing exterior construction near completion at the Science & Engineering Offices building (part of Phase 2 of campus construction). The scissor staircase, a unique feature of Netsch's design, is visible. The library and University Hall are visible behind it at the right.
Date
:
February 22, 1968
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Offices, University of Illinois at Chicago Circle
Image
nop
View northwest during construction of the eleventh floor of the Science & Engineering Offices building (part of Phase 2 of campus construction). Concrete-framed window panels have been installed on a number of the building's floors. The Library and the Staff and Administrative Offices Building (University Hall) are visible behind it at the right.
Date
:
July 27, 1967
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Offices, University of Illinois at Chicago Circle
Image
nop
View southeast during construction of the tenth floor of the Science & Engineering Offices building (part of Phase 2 of campus construction). The scissor stair is also visible under construction. Concrete window panels have been installed on a number of the building's floors. A corner of the Science & Engineering Laboratory is visible at the extreme left.
Date
:
June 27, 1967
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Offices, University of Illinois at Chicago Circle
Image
nop
View northwest during construction of the fifth floor of the Science & Engineering Offices building (part of Phase 2 of campus construction). The Library is at the right, with the addition on its south end in progress, and part of Burnham Hall is at the lower right.
Date
:
January 25, 1967
Collection
:
Facility Information Management
Access
:
Public access
1
2
3
4
5
6
7
8
Last
Active filters
Creator Facet:
McShane Fleming Studios
Remove all
Collection
926
Facility Information Management
1
Richard J. Daley collection
Geographic Location
926
Near West Side (Chicago, Ill.)
1
Riverdale (Chicago, Ill.)
Creator
897
Skidmore, Owings & Merrill
4
Frazier, Raftery, Orr & Fairbank Architects
1
C.F. Murphy Associates (Chicago, Ill.)
1
Skidmore, Owings & Merrill; Netsch, Walter
Medium
502
black-and-white prints (photographs)
425
black-and-white negatives
Topic
1
Architecture
1
Politicians
1
Politics and government
1
Public works
1
Schools
Contact Us
×