Search for:


Search for:

Showing 51 - 100 of 3441 Records
Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View northwest showing work on the roof, during later stages of construction of the Plant Research Laboratory (part of Phase 2 of campus construction).
Date:
March 28, 1967
Collection:

Facility Information Management

Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View southeast in winter showing the roof structure, and brick facing installed on the exterior walls of the Plant Research Laboratory (part of Phase 2 of campus construction).
Date:
February 27, 1967
Collection:

Facility Information Management

Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View east showing the interior of the Plant Research Laboratory during construction (part of Phase 2 of campus construction).
Date:
January 25, 1967
Collection:

Facility Information Management

Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View northeast showing roof structure, and brick facing installed on the exterior walls of the Plant Research Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1967
Collection:

Facility Information Management

Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View southwest during construction of the foundation for the Plant Research Laboratory (part of Phase 2 of campus construction).
Date:
October 26, 1966
Collection:

Facility Information Management

Access:
Public access


Site development, University of Illinois at Chicago Circle
Image nop
View southwest showing excavation of a pit in preparation for Phase 2 of campus construction.
Date:
July 28, 1966
Collection:

Facility Information Management

Access:
Public access


Removal of the elevated walkway, University of Illinois at Chicago
Image nop
View during the removal of the granite and concrete elevated walkway system on east campus, showing the concrete "butterfly" columns. The campus walkways were removed over a six-year period extending from 1993 to 1999.
Date:
June 9, 1993
Collection:

Facility Information Management

Access:
Public access


Great Court and walkway before demolition, University of Illinois at Chicago
Image nop
View at ground level at the Lecture Center, showing concrete "butterfly" columns supporting the granite slabs of the Great Court and elevated walkway.
Date:
May 13, 1993
Collection:

Facility Information Management

Access:
Public access


Elevated walkways shortly before demolition, University of Illinois at Chicago
Image nop
View looking northeast across West Taylor Street. A section of the elevated walkway leading to Science and Engineering Laboratory East is visible behind the trees.
Date:
May 13, 1993
Collection:

Facility Information Management

Access:
Public access


Removal of the elevated walkway, University of Illinois at Chicago
Image nop
Campus view looking southeast during demolition of the east campus elevated walkway system and the Circle Forum (top right). Grant, Douglas, and Lincoln Halls are in the upper center of the photograph.
Date:
1993
Collection:

Facility Information Management

Access:
Public access


Removal of the elevated walkway, University of Illinois at Chicago
Image nop
Removal of granite slabs during demolition of the east campus elevated walkway system. The campus walkways were removed over a six-year period extending from 1993 to 1999.
Date:
1993
Collection:

Facility Information Management

Access:
Public access


Removal of the elevated walkway, University of Illinois at Chicago
Image nop
Demolition of the east campus elevated walkway system. The walkways were removed over a six-year period extending from 1993 to 1999.
Date:
1993
Collection:

Facility Information Management

Access:
Public access


Removal of the elevated walkway, University of Illinois at Chicago
Image nop
Demolition of the east campus elevated walkway system.
Date:
1993
Collection:

Facility Information Management

Access:
Public access


Removal of the elevated walkway, University of Illinois at Chicago
Image nop
Campus view during demolition of the east campus elevated walkway system.
Date:
1993
Collection:

Facility Information Management

Access:
Public access


Removal of the elevated walkway, University of Illinois at Chicago
Image nop
University Hall with broken columns in the foreground, during demolition of the east campus elevated walkway system. The walkways were removed over a six-year period extending from 1993 to 1999.
Date:
1993
Collection:

Facility Information Management

Access:
Public access


Removal of the elevated walkway, University of Illinois at Chicago
Image nop
Broken concrete columns, during demolition of the east campus elevated walkway system. The walkways were removed over a six-year period extending from 1993 to 1999.
Date:
1993
Collection:

Facility Information Management

Access:
Public access


Parking lot, University of Illinois at Chicago Circle
Image nop
View of the rear of buildings in the vicinity of the Formfit building, which was purchased by the University in 1979. The sign on the chain-link fence in the foreground reads "University of Illinois Parking - Authorized Vehicles Only".
Date:
circa 1979
Collection:

Facility Information Management

Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View southeast looking across the intersection of South Halsted and West Taylor Streets, showing construction of the foundation for the Plant Research Laboratory (part of Phase 2 of campus construction).
Date:
October 26, 1966
Collection:

Facility Information Management

Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View southeast looking across the intersection of South Halsted and West Taylor Streets, showing construction of the foundation for the Plant Research Laboratory (part of Phase 2 of campus construction).
Date:
September 30, 1966
Collection:

Facility Information Management

Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building showing the smaller swimming pool near completion. The steel-frame roof structure is visible.
Date:
December 29, 1970
Collection:

Facility Information Management

Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View west during construction of the Physical Education Building (part of Phase 3 of campus construction), showing exterior work near completion. A section of the elevated walkway is visible at the center right, crossing over Roosevelt Road.
Date:
October 23, 1970
Collection:

Facility Information Management

Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing installation of the floor in the gymnasium.
Date:
September 22, 1970
Collection:

Facility Information Management

Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building, showing the smaller swimming pool with concrete work in progress.
Date:
August 20, 1970
Collection:

Facility Information Management

Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing cinder blocks being used for construction of interior walls.
Date:
June 17, 1970
Collection:

Facility Information Management

Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast across Roosevelt Road during construction of the Physical Education building( part of Phase 3 of campus construction), showing exterior brick walls completed.
Date:
May 22, 1970
Collection:

Facility Information Management

Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing installation of pipes. The open atrium is visible at the right.
Date:
April 22, 1970
Collection:

Facility Information Management

Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the roof installed over the steel structure on the west part of the building. The steel roof structure is visible over the swimming pool at the far right. Roosevelt Road runs across the upper part of the photograph.
Date:
March 21, 1970
Collection:

Facility Information Management

Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north in winter during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the west part of the building with steel framework in place for the roof structure and vertical supports. The office area with its open atrium is visible at the right. Roosevelt Road is at the top of the photograph.
Date:
February 21, 1970
Collection:

Facility Information Management

Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View south in winter during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the steel framework in place for the roof structure and vertical supports. Roosevelt Road is at the bottom of the photograph.
Date:
February 21, 1970
Collection:

Facility Information Management

Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
Construction of a locker room with a coffered concrete ceiling during construction of the Physical Education Building (part of Phase 3 of campus construction). Lockers were installed on the low raised slabs.
Date:
January 23, 1970
Collection:

Facility Information Management

Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southwest during construction of the Physical Education Building (part of Phase 3 of campus construction). The swimming pool is visible near the center of the image. Roosevelt Road is at the right, and South Morgan Street is at the top of the image.
Date:
November 16, 1969
Collection:

Facility Information Management

Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north during construction of the first floor of the Physical Education Building (part of Phase 3 of campus construction). Science & Engineering South is beyond it at the right.
Date:
September 19, 1969
Collection:

Facility Information Management

Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast showing the foundation of the Physical Education Building in the foreground, and work in progress on the first floor of the building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is at the left.
Date:
September 19, 1969
Collection:

Facility Information Management

Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast from Roosevelt Road showing construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is at the left.
Date:
August 19, 1969
Collection:

Facility Information Management

Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the first floor of the Physical Education Building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is at the upper right, and the downtown Loop skyline is visible in the distance at the left.
Date:
August 19, 1969
Collection:

Facility Information Management

Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). Roosevelt Road runs across the upper part of the image, and Parking Lot 5C and Science & Engineering South are visible at the top.
Date:
July 16, 1969
Collection:

Facility Information Management

Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View east during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is at the upper center.
Date:
May 19, 1969
Collection:

Facility Information Management

Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). The Science & Engineering Offices building is in the distance at the left.
Date:
May 19, 1969
Collection:

Facility Information Management

Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). The Science & Engineering Offices building is visible in the distance at the right.
Date:
May 19, 1969
Collection:

Facility Information Management

Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest showing excavations and preparations for construction of the Physical Education Building (part of Phase 3 of campus construction).
Date:
February 20, 1969
Collection:

Facility Information Management

Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest showing an excavated site along the south side of Roosevelt Road, in preparation for construction of the Physical Education Building (part of Phase 3 of campus construction).
Date:
January 22, 1969
Collection:

Facility Information Management

Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
February 22, 1968
Collection:

Facility Information Management

Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of cupboards and countertops in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A blackboard is on the right.
Date:
February 22, 1968
Collection:

Facility Information Management

Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A blackboard has been mounted on the wall.
Date:
February 22, 1968
Collection:

Facility Information Management

Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1968
Collection:

Facility Information Management

Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a classroom, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A blackboard has been mounted on the back wall.
Date:
January 25, 1968
Collection:

Facility Information Management

Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northwest showing the completed exterior brick wall on the of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The exterior concrete pylons and steel-framed roof structure are also visible. South Taylor Street is at the far right.
Date:
November 27, 1967
Collection:

Facility Information Management

Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of built-in furniture in a classroom laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
September 29, 1967
Collection:

Facility Information Management

Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northeast showing the completed exterior brick wall on the south facade, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The exterior concrete pylons and steel-frame roof structure are also visible.
Date:
July 27, 1967
Collection:

Facility Information Management

Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View west from South Halsted Street showing the completed exterior brick walls for the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The exterior concrete pylons and steel-framed roof structure are also visible.
Date:
June 27, 1967
Collection:

Facility Information Management

Access:
Public access