Search for:


Search for:

Showing 51 - 100 of 937 Records
Lecture Center construction, University of Illinois at Chicago Circle
Image nop
Construction of the Lecture Center Buildings.
Date:
1964
Collection:
Facility Information Management
Access:
Public access


Lecture Center construction, University of Illinois at Chicago Circle
Image nop
Construction of the foundation of Lecture Center Buildings.
Date:
February 3, 1964
Collection:
Facility Information Management
Access:
Public access


Lecture Center construction, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the foundation of Lecture Center Buildings. Wooden forms for poured concrete and reinforcing bars are shown.
Date:
December 31, 1963
Collection:
Facility Information Management
Access:
Public access


Lecture Center construction, University of Illinois at Chicago Circle
Image nop
Construction of the foundation, Lecture Center Buildings.
Date:
October 1, 1963
Collection:
Facility Information Management
Access:
Public access


Lecture Center construction, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the foundation, Lecture Center Buildings.
Date:
September 3, 1963
Collection:
Facility Information Management
Access:
Public access


Lecture Center construction, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the foundation, Lecture Center Buildings.
Date:
August 2, 1963
Collection:
Facility Information Management
Access:
Public access


Campus view during construction
Image nop
Campus view to the southeast during construction of multiple buildings. The Lecture Centers, Great Court and Circle Forum are at the center of the image. A portion of the elevated walkway is visible at the lower left. The library is at the right.
Date:
November 3, 1964
Collection:
Facility Information Management
Access:
Public access


Parking lots, University of Illinois at Chicago Circle
Image nop
View looking west, showing demolition of a building during site preparations for Parking Lots 1A and 1B, located between West Vernon Park Place (on the left) and West Harrison Street (right). Neighborhood buildings surround the site.
Date:
November 3, 1964
Collection:
Facility Information Management
Access:
Public access


Great Court construction, University of Illinois at Chicago Circle
Image nop
View northwest from the Great Court towards University Hall, showing the exedrae under construction. The Great Court, Circle Forum, and campus elevated walkway system were demolished over a six-year period extending from 1993 to 1999.
Date:
November 3, 1964
Collection:
Facility Information Management
Access:
Public access


Elevated walkway construction, University of Illinois at Chicago Circle
Image nop
View during construction of a section of the elevated walkway across West Harrison Street. A number of the concrete "butterfly" support columns are visible. Jefferson Hall is at the lower right.
Date:
October 1, 1964
Collection:
Facility Information Management
Access:
Public access


Site preparation, University of Illinois at Chicago Circle
Image nop
View across South Halsted Street looking towards preparations on a site between Halsted Street and the Dan Ryan Expressway.
Date:
October 1, 1964
Collection:
Facility Information Management
Access:
Public access


Harrison Street, University of Illinois at Chicago Circle
Image nop
View west along West Harrison Street showing road construction adjacent to campus. Part of University Hall is visible at the upper left.
Date:
October 1, 1964
Collection:
Facility Information Management
Access:
Public access


Campus view during construction, University of Illinois at Chicago Circle
Image nop
Campus view to the east during construction of multiple buildings. The Commonwealth Edison (ComEd) electric substation (demolished 2017) is at the lower left, and numerous concrete "butterfly" columns to support the elevated walkway are in front of that. The Union Tower (now Student Center East Tower) is in the center distance.
Date:
October 1, 1964
Collection:
Facility Information Management
Access:
Public access


Great Court construction, University of Illinois at Chicago Circle
Image nop
Construction detail of a corner of the Great Court. Granite slabs for the elevated walkway form the perimeter.
Date:
September 1, 1964
Collection:
Facility Information Management
Access:
Public access


Great Court construction, University of Illinois at Chicago Circle and Circle Forum
Image nop
View across the Great Court, with the Circle Forum at its center.
Date:
September 1, 1964
Collection:
Facility Information Management
Access:
Public access


Elevated walkway construction, University of Illinois at Chicago Circle
Image nop
View southwest of a section of elevated walkway crossing over West Taylor Street, with a ramp leading to ground level on the south side of Taylor Street. This section of the walkway is supported by rectangular concrete piers, rather than "butterfly" columns.
Date:
September 1, 1964
Collection:
Facility Information Management
Access:
Public access


Campus view during construction, University of Illinois at Chicago Circle
Image nop
View during construction, with part of the Union building and one of the Lecture Center buildings visible in the upper part of the photograph.
Date:
September 1, 1964
Collection:
Facility Information Management
Access:
Public access


Lecture Center construction, University of Illinois at Chicago Circle
Image nop
Construction of the Lecture Center Buildings, showing sloped concrete floor for one of the lecture halls.
Date:
July 31, 1964
Collection:
Facility Information Management
Access:
Public access


Lecture Center construction, University of Illinois at Chicago Circle and elevated walkway
Image nop
View during construction of the Lecture Center Buildings. Concrete columns for the elevated walkway surround the Lecture Centers.
Date:
June 1, 1964
Collection:
Facility Information Management
Access:
Public access


Lecture Center construction, University of Illinois at Chicago Circle and elevated walkway
Image nop
View during construction of the Lecture Center Buildings. Concrete columns for the elevated walkway are at the left.
Date:
June 1, 1964
Collection:
Facility Information Management
Access:
Public access


Construction of Great Court and Lecture Center Buildings
Image nop
View northeast during construction of the Great Court above the Lecture Center Buildings. Concrete "butterfly" columns to support the Great Court surround the Lecture Center. Classroom Buildings are behind it, and the downtown skyline is in the distance.
Date:
June 1, 1964
Collection:
Facility Information Management
Access:
Public access


Campus building site, University of Illinois at Chicago Circle
Image nop
Construction view, showing excavated area with pipes leading to one of the classroom buildings.
Date:
June 1, 1964
Collection:
Facility Information Management
Access:
Public access


Elevated walkway, University of Illinois at Chicago Circle
Image nop
View northwest during winter, looking up at the elevated walkway from ground level. The concrete "butterfly" columns supporting the walkway are clearly visible. The space between the two sides of the walkway allowed room for trees. Part of University Hall is visible at the far left beyond the walkway, and Jefferson Hall is in the distance near the center of the photograph.
Date:
February 27, 1965
Collection:
Facility Information Management
Access:
Public access


Lecture Center construction, University of Illinois at Chicago Circle
Image nop
View through hallway windows of a classroom in the Lecture Center Buildings. The hallway is visible at the right.
Date:
March 2, 1965
Collection:
Facility Information Management
Access:
Public access


Lecture Center construction, University of Illinois at Chicago Circle
Image nop
View towards the front of a lecture hall in the Lecture Center buildings, showing classroom seating and concrete ceiling beams. A countertop with a sink, a podium with a microphone, and a blackboard are at the front of the room.
Date:
February 27, 1965
Collection:
Facility Information Management
Access:
Public access


Elevated walkway construction, University of Illinois at Chicago Circle
Image nop
View in winter showing the elevated walkway system crossing above West Harrison Street (lower right), with a ramp leading down to the Peoria Street overpass above the Eisenhower Expressway. The Circle interchange is visible in the upper right of the photograph.
Date:
February 2, 1965
Collection:
Facility Information Management
Access:
Public access


Lecture Center construction, University of Illinois at Chicago Circle
Image nop
View of seating installed in a lecture hall in the Lecture Center Buildings.
Date:
February 1, 1965
Collection:
Facility Information Management
Access:
Public access


Staircase near Library, University of Illinois at Chicago Circle
Image nop
View outside the Library in winter with scaffolding in place and a staircase under construction leading up to the elevated walkway. University Hall is visible in the distance at the right.
Date:
February 1, 1965
Collection:
Facility Information Management
Access:
Public access


Halsted Street and Hull House Dining Hall, University of Illinois at Chicago Circle
Image nop
View northeast looking across South Halsted Street towards the downtown Chicago Loop. The brick Hull House Residents' Dining Hall is at the left.
Date:
January 4, 1965
Collection:
Facility Information Management
Access:
Public access


Elevated walkway and Great Court, University of Illinois at Chicago Circle
Image nop
View to the north during Phase 1 of campus construction, showing part of the elevated walkway system leading to the Great Court above the Lecture Center. The Union (now Student Center East) is at the right.
Date:
January 4, 1965
Collection:
Facility Information Management
Access:
Public access


Campus view during construction, University of Illinois at Chicago Circle
Image nop
View looking north during winter during Phase 1 of campus construction, showing construction in progress on the elevated walkway, Lecture Center, Great Court, and the Union (now Student Center East).
Date:
December 3, 1964
Collection:
Facility Information Management
Access:
Public access


Classroom Buildings 603A B-C (Lincoln, Grant, and Douglas Halls), University of Illinois at Chicago Circle
Image nop
View of installation of underground pipes during construction of Lincoln, Grant, and Douglas Halls (originally Classroom Buildings 603B, 603A, and 603C).
Date:
December 31, 1963
Collection:
Facility Information Management
Access:
Public access


Classroom Buildings 603A B-C (Lincoln, Grant, and Douglas Halls), University of Illinois at Chicago Circle
Image nop
View northeast during construction of Grant Hall (left, originally Classroom Building 603A) and Douglas Hall (right background, originally Classroom Building 603C).
Date:
December 31, 1963
Collection:
Facility Information Management
Access:
Public access


Classroom Buildings 603A B-C (Lincoln, Grant, and Douglas Halls), University of Illinois at Chicago Circle
Image nop
View northeast during construction of the third floor of Grant Hall (originally named Classroom Building 603A). Part of the facade of the Commonwealth Edison (ComEd) electrical substation is visible at the far left.
Date:
November 29, 1963
Collection:
Facility Information Management
Access:
Public access


Classroom Buildings 603A B-C (Lincoln, Grant, and Douglas Halls), University of Illinois at Chicago Circle
Image nop
View southeast during construction of the foundations for Lincoln, Grant, and Douglas Halls (originally Classroom Buildings 603B, 603A, and 603C).
Date:
October 1, 1963
Collection:
Facility Information Management
Access:
Public access


Classroom Buildings 603A B-C (Lincoln, Grant, and Douglas Halls), University of Illinois at Chicago Circle
Image nop
View northeast during construction of the foundations for Lincoln, Grant, and Douglas Halls (originally Classroom Buildings 603B, 603A, and 603C).
Date:
August 2, 1963
Collection:
Facility Information Management
Access:
Public access


Classroom Buildings, University of Illinois at Chicago Circle
Image nop
View northeast showing Burnham Hall (originally named Classroom Building 608A) near completion. Part of Addams Hall is visible to its right. One of the Lecture Centers is in the distance at the left.
Date:
November 3, 1964
Collection:
Facility Information Management
Access:
Public access


Construction of campus buildings, University of Illinois at Chicago Circle
Image nop
View of several campus buildings under construction, including Burnham Hall (left) and the Science & Engineering Laboratory (right).
Date:
March 2, 1964
Collection:
Facility Information Management
Access:
Public access


Classroom Buildings, University of Illinois at Chicago Circle
Image nop
Construction of Taft, Burnham, and Addams Halls (originally named Classroom Building 608B, Classroom Building 608A, and Classroom Building 608C).
Date:
November 29, 1963
Collection:
Facility Information Management
Access:
Public access


Classroom Building 603B (Lincoln Hall), University of Illinois at Chicago Circle
Image nop
View during construction of the entrance area of Lincoln Hall.
Date:
December 3, 1964
Collection:
Facility Information Management
Access:
Public access


Classroom Buildings 603B and 603C (Lincoln Hall and Douglas Hall), University of Illinois at Chicago Circle
Image nop
View northwest from the elevated walkway towards Lincoln Hall (left) and Douglas Hall (right). A number of storage pavilions are in the foreground. University Hall rises in the distance.
Date:
November 3, 1964
Collection:
Facility Information Management
Access:
Public access


Classroom Building 603C (Douglas Hall), University of Illinois at Chicago Circle
Image nop
View of ceiling during installation of lighting fixtures in Douglas Hall.
Date:
October 1, 1964
Collection:
Facility Information Management
Access:
Public access


Classroom Buildings 603A B-C (Lincoln, Grant, and Douglas Halls), University of Illinois at Chicago Circle
Image nop
View southeast during the construction of Lincoln, Grant, and Douglas Halls. The concrete-framed window panels have been installed in the second and third floors of Grant Hall (left). Lincoln Hall is at the right, and Douglas Hall is partially visible in the distance between them. A number of concrete columns for the elevated walkway are visible in front of this group of buildings.
Date:
June 1, 1964
Collection:
Facility Information Management
Access:
Public access


Classroom Buildings 603A B-C (Lincoln, Grant, and Douglas Halls), University of Illinois at Chicago Circle
Image nop
View northeast during the construction of Lincoln, Grant, and Douglas Halls. The concrete-framed window panels have been installed in the second and third floors of Grant Hall (left).
Date:
March 11, 1964
Collection:
Facility Information Management
Access:
Public access


Classroom Buildings 603A B-C (Lincoln, Grant, and Douglas Halls), University of Illinois at Chicago Circle
Image nop
Construction of the second floors of Lincoln, Grant, and Douglas Halls.
Date:
February 3, 1964
Collection:
Facility Information Management
Access:
Public access


Classroom Building 602A (Jefferson Hall), University of Illinois at Chicago Circle
Image nop
View of the entrance lobby of Jefferson Hall, showing a low granite bench and table on cruciform supports. A number of lockers await installation in another area of the building. The stairs to the elevated walkway are visible through the windows at the left.
Date:
January 4, 1965
Collection:
Facility Information Management
Access:
Public access


Classroom Building 602A (Jefferson Hall), University of Illinois at Chicago Circle
Image nop
View of Jefferson Hall, with the concrete-framed window panels installed on the second and third floors.
Date:
April 1, 1964
Collection:
Facility Information Management
Access:
Public access


Campus building site, University of Illinois at Chicago Circle
Image nop
View southeast showing the campus building site during Phase 1 of campus construction. The Commonwealth Edison (ComEd) electrical substation (demolished 2017) is in the center of the image. Part of Jefferson Hall is visible at the far right.
Date:
December 31, 1963
Collection:
Facility Information Management
Access:
Public access


Construction of Classroom Buildings, University of Illinois at Chicago Circle
Image nop
View during construction of the foundations for Taft, Addams, and Burnham Halls (originally named Classroom Buildings 608B, 608C, and 608A), part Phase 1 of campus construction.
Date:
September 3, 1963
Collection:
Facility Information Management
Access:
Public access


Staff and Administrative Offices Building (University Hall), University of Illinois at Chicago Circle
Image nop
View looking down to ground level on the west side of the Staff and Administrative Offices Building (University Hall), showing the curved pedestrian ramps leading to the second floor of that building. A (now-closed) stretch of South Morgan Street is visible in the upper part of the photograph.
Date:
April 2, 1965
Collection:
Facility Information Management
Access:
Public access