Search for:


Search for:

Showing 51 - 100 of 404 Records
Education, Performing Arts, and Social Work Building, University of Illinois at Chicago
Image nop
View from the southeast corner of the Education, Performing Arts, and Social Work Building (now Education, Theatre, Music and Social Work), showing the concrete plaza with light posts and a small ramp leading to a building entrance.
Date:
1990s
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing a locker room with rows of lockers installed on low raised concrete slabs and wooden benches between them. The room has a coffered concrete ceiling.
Date:
November 25, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the Physical Education Building (part of Phase 3 of campus construction), showing exterior work near completion. Saint Francis of Assisi Church is in the distance at the left.
Date:
October 23, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest showing the south and east sides of the Physical Education Building (part of Phase 3 of campus construction) during later stages of work, with exterior brick walls completed.
Date:
October 23, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing electrical wiring and work on walls.
Date:
July 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building, showing the swimming pool with the roof in place over the steel support structure.
Date:
May 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing a locker room with a coffered concrete ceiling. Lockers were installed on the low raised slabs.
Date:
April 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast in winter during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the building's steel framing.
Date:
January 23, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest showing steel framing for the roof structure above the swimming pool, during construction of the Physical Education Building (part of Phase 3 of campus construction).
Date:
December 22, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the Physical Education Building (part of Phase 3 of campus construction), showing installation of steel framing for the roof structure and vertical supports.
Date:
December 22, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the Physical Education Building (part of Phase 3 of campus construction), showing framing in place for the roof structure and vertical supports. The swimming pool is at the upper right. Roosevelt Road is at the left.
Date:
November 16, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast showing early stages of construction of the Physical Education Building (part of Phase 3 of campus construction). The swimming pool is at the upper left, with a construction crane working in it. Roosevelt Road is visible at the lower left of the photograph.
Date:
October 18, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southwest showing early stages of construction of the Physical Education Building (part of Phase 3 of campus construction). The swimming pool is visible at the left, with a construction crane working in it. Roosevelt Road is at the bottom of the photograph, and South Morgan Street is at the upper right.
Date:
October 18, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View of a mechanical room during construction of the Physical Education Building (part of Phase 3 of campus construction).
Date:
September 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the first floor of the Physical Education Building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is at the upper right, and the downtown Loop skyline is visible in the distance at the left.
Date:
September 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). South Morgan Street is at the bottom of the image, and Roosevelt Road is at the left. Saint Francis of Assisi Church is at the top right.
Date:
July 16, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). The Science & Engineering Offices building is in the distance at the left.
Date:
June 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). The Science & Engineering Offices building is in the distance at the left.
Date:
June 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). Roosevelt Road runs across the center of the image.
Date:
May 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction).
Date:
May 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction).
Date:
April 22, 1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northeast showing construction of the foundation for the Education & Communications Building (part of Phase 3 of campus construction).
Date:
1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northeast showing construction of the foundation for the Theater, part of the Education & Communications Building. Built during Phase 3 of campus construction, the building is now named Education, Theatre, Music and Social Work. The West Harrison Street sidewalk is at the lower left.
Date:
1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View southeast showing construction of the foundation of the Education & Communications Building (part of Phase 3 of campus construction). University Hall stands behind it.
Date:
1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View along a hallway during construction of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
February 23, 1971
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View along a hallway with drywall installed in the Education & Communications Building (part of Phase 3 of campus construction).
Date:
February 23, 1971
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View towards the front of the Rehearsal Hall at the Education & Communications Building (part of Phase 3 of campus construction).
Date:
February 1, 1971
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest across West Harrison Street showing construction of the Education & Communications Building, and Theater (far left), all part of Phase 3 of campus construction.
Date:
February 1, 1971
Collection:
Facility Information Management
Access:
Public access


Elevated walkway construction, University of Illinois at Chicago Circle
Image nop
View southwest from the east side of South Morgan Street, showing a section of elevated walkway which leads from the second level of the Education & Communications Building and crosses above South Morgan Street.At the far left, a second section leading down to street level at West Harrison Street is under construction.
Date:
December 29, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the Education & Communications Building (part of Phase 3 of campus construction), showing an open plaza area with brick-faced planters being installed. University Hall rises behind it.
Date:
October 1, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
Construction of the Theater, part of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
September 2, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest from University Hall, during later stages of construction of the Education & Communications Building and Theater (part of Phase 3 of campus construction). The intersection of West Harrison Street and South Morgan Street is at the lower center of the image, and the Eisenhower Expressway (I-290) is on the right of the construction site. The Behavioral Sciences Building is partially visible at the lower left.
Date:
September 2, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest from University Hall, showing later stages of construction on the Education & Communications Building, and Theater (part of Phase 3 of campus construction). The intersection of West Harrison Street and South Morgan Street is at the lower center of the image, and the Eisenhower Expressway (I-290) is to the right of the construction site. The Behavioral Sciences Building is partially visible at the lower left.
Date:
July 7, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest showing construction of upper floors of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
June 2, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest showing construction in progress on the Education & Communications Building (part of Phase 3 of campus construction).
Date:
April 28, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the Education & Communications Building (part of Phase 3 of campus construction), showing installation of steel framing for the Theater. University Hall is visible in the distance.
Date:
February 27, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the foundation of the Education & Communications Building (part of Phase 3 of campus construction). West Harrison Street is at the upper right, and University Hall is at the top right.
Date:
August 27, 1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View southwest during construction of the foundation of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
August 27, 1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the foundation of the Education & Communications Building (part of Phase 3 of campus construction). Part of University Hall and the Behavioral Science Building are visible beyond it.
Date:
September 30, 1969
Collection:
Facility Information Management
Access:
Public access


Proposed Student Services Classroom-Office Building, University of Illinois at Chicago Circle
Image nop
Drawings for the proposed (Phase 3 of campus construction) Student Services Building Classroom-Office Building, with typical north and south wall sections, and details drawings including masonry, typical column, typical head, and typical sill.
Date:
1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View of the main swimming pool during construction of the Physical Education Building (part of Phase 3 of campus construction), showing concrete work in progress.
Date:
September 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the south side of the building with exterior work near completion. The Science & Engineering Offices building is in the distance at the left.
Date:
August 20, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing an atrium open to the second floor, with a long narrow skylight above it. The entrance to the building is in the center distance.
Date:
July 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing a locker room with a coffered concrete ceiling. Lockers were installed on the low raised slabs.
Date:
June 25, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education building (part of Phase 3 of campus construction), showing exterior brick walls completed. Pipes connecting the building and a sewer are in the foreground.
Date:
May 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southwest during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the roof installed over the steel structure on the west part of the building. The steel roof structure is visible over the swimming pool at the left. Roosevelt Road is in the lower part of the photograph.
Date:
March 21, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View south in winter during construction of the Physical Education Building (part of Phase 3 of campus construction). The swimming pool is at the center of the image, with steel framing in place for its roof structure. Roosevelt Road is visible at the bottom of the photograph.
Date:
February 21, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southwest in winter during construction of the Physical Education Building (part of Phase 3 of campus construction), showing steel framing for the building's roof structure and vertical supports. The swimming pool is at the left, with steel framing in place for its roof. South Morgan Street runs across the top of the image, and Roosevelt Road is at the right.
Date:
February 21, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View showing coffered concrete ceiling and installation of pipes during construction of the Physical Education Building (part of Phase 3 of campus construction).
Date:
December 22, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the Physical Education Building (part of Phase 3 of campus construction). The swimming pool is in the upper part of the photograph. Roosevelt Road is at the upper left.
Date:
November 16, 1969
Collection:
Facility Information Management
Access:
Public access