Skip to content
Home
Collections
Digital Exhibits
Help
Contact Us
Login
UIC Library Digital Collections (Beta)
Basic
Advanced
Search in fulltext
Search
Search for
:
Objects
Collections
Field
Any
Title
Creator
Contributor
Description
Identifier
Address
Building Name
Geographic Location
Collection
Subject--Genre
Subject--Name
Subject--Topic
Collection Code
Series
Condition
Must
Must not
Should
Type of search
Contain
Equal
Starts with
Value
Value
Value
Value
Add more criteria
Search for
:
Objects
Collections
Clear
Search
Display
List
Timeline
Gallery
Map
Showing
901 - 927 of 927
Records
Sort by
:
Number of results to display
:
Filter
1
Library addition, University of Illinois at Chicago Circle
Image
nop
Campus view showing early stages of construction of the addition at the north end of the library (part of Phase 2 of campus construction). Stevenson Hall is visible under construction at the lower left, and part of the elevated walkway is visible at the upper left.
Date
:
November 25, 1966
Collection
:
Facility Information Management
Access
:
Public access
Library addition, University of Illinois at Chicago Circle
Image
nop
Campus view showing construction of the addition at the north end of the library (part of Phase 2 of campus construction). Part of the elevated walkway system and Great Court are visible at the upper left. At the lower left, Stevenson Hall is visible under construction.
Date
:
September 30, 1966
Collection
:
Facility Information Management
Access
:
Public access
Library addition, University of Illinois at Chicago Circle
Image
nop
View showing early stages of construction of the addition at the north end of the library (part of Phase 2 of campus construction). Part of the Great Court is visible at the upper left, and South Morgan Street is at the right.
Date
:
August 25, 1966
Collection
:
Facility Information Management
Access
:
Public access
Library addition, University of Illinois at Chicago Circle
Image
nop
Excavation for the Library addition at the north end of the building (part of Phase 2 of campus construction).
Date
:
August 25, 1966
Collection
:
Facility Information Management
Access
:
Public access
Library addition, University of Illinois at Chicago Circle
Image
nop
View northwest towards South Morgan Street, showing construction of the addition at the north end of the Library (part of Phase 2 of campus construction).
Date
:
July 28, 1966
Collection
:
Facility Information Management
Access
:
Public access
Library addition, University of Illinois at Chicago Circle
Image
nop
View northwest towards South Morgan Street, showing the site at the south end of the library before construction of the addition (part of Phase 2 of campus construction).
Date
:
June 1, 1966
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
Installation of cabinetry and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
March 28, 1968
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
March 28, 1968
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
Installation of cabinetry and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
February 22, 1968
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
Installation of furniture in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
February 22, 1968
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
Installation of built-in furniture in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
January 25, 1968
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View of a laboratory in the later stages of installation, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
January 25, 1968
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View at ground level during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction), showing the southwest corner of the building exterior nearing completion. The exterior concrete pylons and steel-framed roof structure are also visible. Part of the elevated walkway is visible at the extreme right of the photograph.
Date
:
July 27, 1967
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View east during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction), showing the completed exterior brick wall on the west facade. A planned south addition remained unbuilt.
Date
:
April 27, 1967
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
Installation of ductwork on the ground floor interior, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
March 28, 1967
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View east showing work on the fourth floor and steel-frame roof structure during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
March 28, 1967
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View looking northwest from the elevated walkway in winter during construction of the upper levels of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The structural pylons to support the roof are also visible under construction. A planned south addition remained unbuilt.
Date
:
February 27, 1967
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View south during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). Part of the elevated walkway is visible in the center of the photograph.
Date
:
January 25, 1967
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View northwest in winter from the elevated walkway during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
December 29, 1966
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
Installation of pipes along the ceiling during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
November 25, 1966
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View southeast during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A planned south addition remained unbuilt. The intersection of West Taylor Street and South Halsted Street is visible near the center of the photograph.
Date
:
November 25, 1966
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
Construction of concrete piers for the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A planned south addition remained unbuilt.
Date
:
August 25, 1966
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View southeast showing construction of the foundation for the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The elevated walkway is visible in the upper part of the photograph.
Date
:
July 28, 1966
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View southeast showing site preparations for construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A portion of the elevated walkway is in the upper part of the photograph. At the far right, the walkway crosses over West Taylor Street.
Date
:
June 29, 1966
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View northeast showing construction of the foundation for the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A planned south addition remained unbuilt.
Date
:
July 28, 1966
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View west showing site preparations for construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A portion of the elevated walkway is visible in the upper part of the photograph.
Date
:
June 29, 1966
Collection
:
Facility Information Management
Access
:
Public access
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image
nop
View northwest during site preparations for construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date
:
June 1, 1966
Collection
:
Facility Information Management
Access
:
Public access
First
14
15
16
17
18
19
Active filters
Creator Facet:
McShane Fleming Studios
Remove all
Collection
926
Facility Information Management
1
Richard J. Daley collection
Geographic Location
926
Near West Side (Chicago, Ill.)
1
Riverdale (Chicago, Ill.)
Creator
897
Skidmore, Owings & Merrill
4
Frazier, Raftery, Orr & Fairbank Architects
1
C.F. Murphy Associates (Chicago, Ill.)
1
Skidmore, Owings & Merrill; Netsch, Walter
Medium
502
black-and-white prints (photographs)
425
black-and-white negatives
Topic
1
Architecture
1
Politicians
1
Politics and government
1
Public works
1
Schools
Contact Us
×