Search for:


Search for:

Showing 1 - 50 of 1713 Records
-

Flooding during construction of Art & Architecture Building, University of Illinois at Chicago Circle
View northwest from the exterior staircase at the Union building (now Student Center East) showing a flooded area south of the construction site of the Art & Architecture Building (at right), which extends along the east side of Douglas Hall (left). University Hall is behind it.
1966

Flooding during construction of Art & Architecture Building, University of Illinois at Chicago Circle
View northeast showing a flooded area at the south end of the Art & Architecture Building during its construction (part of Phase 2 of campus construction).
1966

Parking lot, University of Illinois at Chicago Circle
View of the rear of buildings in the vicinity of the Formfit building, which was purchased by the University in 1979. The sign on the chain-link fence in the foreground reads "University of Illinois Parking - Authorized Vehicles Only".
1979

Physical Education Building, University of Illinois at Chicago Circle
View during construction of the Physical Education Building showing the smaller swimming pool near completion. The steel-frame roof structure is visible.
1970

Physical Education Building, University of Illinois at Chicago Circle
View west during construction of the Physical Education Building (part of Phase 3 of campus construction), showing exterior work near completion. A section of the elevated walkway is visible at the center right, crossing over Roosevelt Road.
1970

Physical Education Building, University of Illinois at Chicago Circle
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing installation of the floor in the gymnasium.
1970

Physical Education Building, University of Illinois at Chicago Circle
View during construction of the Physical Education Building, showing the smaller swimming pool with concrete work in progress.
1970

Physical Education Building, University of Illinois at Chicago Circle
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing cinder blocks being used for construction of interior walls.
1970

Physical Education Building, University of Illinois at Chicago Circle
View southeast across Roosevelt Road during construction of the Physical Education building( part of Phase 3 of campus construction), showing exterior brick walls completed.
1970

Physical Education Building, University of Illinois at Chicago Circle
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing installation of pipes. The open atrium is visible at the right.
1970

Physical Education Building, University of Illinois at Chicago Circle
View northeast during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the roof installed over the steel structure on the west part of the building. The steel roof structure is visible over the swimming pool at the far right. Roosevelt Road runs across the upper part of the photograph.
1970

Physical Education Building, University of Illinois at Chicago Circle
View north in winter during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the west part of the building with steel framework in place for the roof structure and vertical supports. The office area with its open atrium is visible at the right. Roosevelt Road is at the top of the photograph.
1970

Physical Education Building, University of Illinois at Chicago Circle
View south in winter during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the steel framework in place for the roof structure and vertical supports. Roosevelt Road is at the bottom of the photograph.
1970

Physical Education Building, University of Illinois at Chicago Circle
Construction of a locker room with a coffered concrete ceiling during construction of the Physical Education Building (part of Phase 3 of campus construction). Lockers were installed on the low raised slabs.
1970

Physical Education Building, University of Illinois at Chicago Circle
View southwest during construction of the Physical Education Building (part of Phase 3 of campus construction). The swimming pool is visible near the center of the image. Roosevelt Road is at the right, and South Morgan Street is at the top of the image.
1969

Physical Education Building, University of Illinois at Chicago Circle
View north during construction of the first floor of the Physical Education Building (part of Phase 3 of campus construction). Science & Engineering South is beyond it at the right.
1969

Physical Education Building, University of Illinois at Chicago Circle
View southeast showing the foundation of the Physical Education Building in the foreground, and work in progress on the first floor of the building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is at the left.
1969

Physical Education Building, University of Illinois at Chicago Circle
View southeast from Roosevelt Road showing construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is at the left.
1969

Physical Education Building, University of Illinois at Chicago Circle
View northeast during construction of the first floor of the Physical Education Building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is at the upper right, and the downtown Loop skyline is visible in the distance at the left.
1969

Physical Education Building, University of Illinois at Chicago Circle
View north during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). Roosevelt Road runs across the upper part of the image, and Parking Lot 5C and Science & Engineering South are visible at the top.
1969

Physical Education Building, University of Illinois at Chicago Circle
View east during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is at the upper center.
1969

Physical Education Building, University of Illinois at Chicago Circle
View north during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). The Science & Engineering Offices building is in the distance at the left.
1969

Physical Education Building, University of Illinois at Chicago Circle
View north during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). The Science & Engineering Offices building is visible in the distance at the right.
1969

Physical Education Building, University of Illinois at Chicago Circle
View northwest showing excavations and preparations for construction of the Physical Education Building (part of Phase 3 of campus construction).
1969

Physical Education Building, University of Illinois at Chicago Circle
View northwest showing an excavated site along the south side of Roosevelt Road, in preparation for construction of the Physical Education Building (part of Phase 3 of campus construction).
1969

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1968

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Installation of cupboards and countertops in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A blackboard is on the right.
1968

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A blackboard has been mounted on the wall.
1968

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1968

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Installation of furniture and equipment in a classroom, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A blackboard has been mounted on the back wall.
1968

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View northwest showing the completed exterior brick wall on the of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The exterior concrete pylons and steel-framed roof structure are also visible. South Taylor Street is at the far right.
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Installation of built-in furniture in a classroom laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View northeast showing the completed exterior brick wall on the south facade, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The exterior concrete pylons and steel-frame roof structure are also visible.
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View west from South Halsted Street showing the completed exterior brick walls for the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The exterior concrete pylons and steel-framed roof structure are also visible.
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View northwest during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction), showing completed exterior brick walls. The exterior concrete pylons and steel-framed roof structure are also visible.
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View northwest during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction), showing work in progress on the exterior brick walls. The exterior concrete pylons and steel-frame roof structure are also visible.
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View northeast during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction), showing work in progress on the exterior brick walls. The exterior concrete pylons and steel-framed roof structure are also visible.
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Construction work in progress on the second floor, including the installation of ductwork, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View in winter looking northeast from the elevated walkway, showing construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Workers on scaffolding during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). View is toward the south.
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View of the building's concrete structure, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View of debris on the balcony along the south wall of the Science & Engineering Laboratory (Phase 1 of campus construction), during construction of the center addition to that building (part of Phase 2 of campus construction).
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View southeast during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View northwest from the elevated walkway during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Ground-level view in winter showing building foundation and sewer installation during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1966

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View northwest during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1966

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View west from South Halsted Street during early stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1966

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View southeast during early stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1966

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View east during early stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A planned south addition remained unbuilt.
1966

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View northwest showing construction of the foundation for the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). Part of the elevated walkway is visible at the upper left.
1966