Skip to content
Home
Collections
Digital Exhibits
Help
Contact Us
Login
UIC Library Digital Collections (Beta)
Basic
Advanced
Search in fulltext
Search
Search for
:
Objects
Collections
Field
Any
Title
Creator
Contributor
Description
Identifier
Address
Building Name
Geographic Location
Collection
Subject--Genre
Subject--Name
Subject--Topic
Collection Code
Series
Condition
Must
Must not
Should
Type of search
Contain
Equal
Starts with
Value
Value
Value
Value
Add more criteria
Search for
:
Objects
Collections
Clear
Search
Display
List
Timeline
Gallery
Map
Showing
1 - 50 of 937
Records
Sort by
:
Number of results to display
:
Filter
1
×
Drag the filter control on desktop. The Timeline feature is in beta and does not currently work on mobile devices.
-
Apply range
Medical Sciences Addition, University of Illinois at the Medical Center
A worker installs a cement floor during the late stages of construction of Phase One of the Medical Sciences Addition (now the Medical Sciences Building), with elevators at the left, and the framework for a dropped ceiling in the upper part of the photograph. The building is located at 909 South Wolcott Avenue.
1963
Medical Sciences Addition, University of Illinois at the Medical Center
View southwest during construction of the upper floors of Phase One of the Medical Sciences Addition (now the Medical Sciences Building), located at 909 South Wolcott Avenue.
1963
Medical Sciences Addition, University of Illinois at the Medical Center
View northeast during construction of Phase One of the Medical Sciences Addition (now the Medical Sciences Building), located at 909 South Wolcott Avenue. Part of South Wolcott Avenue is visible at the upper left.
1962
Medical Sciences Addition, University of Illinois at the Medical Center
View of pipes suspended from the ceiling during construction of Phase One of the Medical Sciences Addition (now the Medical Sciences Building), located at 909 South Wolcott Avenue.
1962
Medical Sciences Addition, University of Illinois at the Medical Center
View southeast showing site preparations for the construction of Phase One of the Medical Sciences Addition (now the Medical Sciences Building), located at 909 South Wolcott Avenue.
1962
Physical Plant Building, University of Illinois at Chicago Circle
View of the first floor general offices in the Physical Plant Building (part of Phase 1 of campus construction), with the gypsum block screen wall in the right foreground, and rows of fluorescent lighting fixtures installed on the ceiling.
1964
Physical Plant Building, University of Illinois at Chicago Circle
View of the steel ceiling structure, ductwork, and masonry walls in the Physical Plant Building (part of Phase 1 of campus construction).
1964
Physical Plant Building, University of Illinois at Chicago Circle
Installation of ductwork in the Physical Plant Building (part of Phase 1 of campus construction).
1964
Physical Plant Building, University of Illinois at Chicago Circle
View northwest showing construction of the exterior brick walls of the Physical Plant Building (part of Phase 1 of campus construction).
1964
Physical Plant Building, University of Illinois at Chicago Circle
Site preparations and excavation for the Physical Plant Building (part of Phase 1 of campus construction).
1963
Library, University of Illinois at Chicago Circle
View just inside the second floor entrance to the Library, with concrete ceiling beams and piers visible. The entrance to the Library is at the extreme right.
1965
Library, University of Illinois at Chicago Circle
View of the west side and south end of the library during the late stages of its construction (part of Phase 1 of campus construction).
1965
Circle Forum and Library, University of Illinois at Chicago Circle
Winter view during Phase 1 of campus construction, looking west through the Circle Forum and across part of the Great Court towards the Library, in the later stages of its construction.
1964
Library, University of Illinois at Chicago Circle
View of the library interior during construction (part of Phase 1 of campus construction), looking to the east on the second floor of the building. The window wall and concrete beams are visible.
1964
Library, University of Illinois at Chicago Circle
View of the metal framing at ground level for the library entrance (part of Phase 1 of campus construction).
1964
Library, University of Illinois at Chicago Circle
View looking across the Great Court showing the upper floors of the Library under construction (part of Phase 1 of campus construction).
1964
Library, University of Illinois at Chicago Circle
View during construction of the Library (part of Phase 1 of campus construction), showing a scale model for the concrete beams and piers.
1964
Library, University of Illinois at Chicago Circle
View west across South Morgan Street at West Polk Street, showing construction of the foundation of the Library (part of Phase 1 of campus construction).
1964
Library, University of Illinois at Chicago Circle
View west towards South Morgan Street, showing construction of the foundation of the Library (part of Phase 1 of campus construction).
1963
Science & Engineering Laboratory, University of Illinois at Chicago Circle
View during early stages of construction of the Science & Engineering Laboratory (part of Phase 1 of campus construction).
1964
Science & Engineering Laboratory, University of Illinois at Chicago Circle
Construction of the foundation of the Science & Engineering Laboratory (part of Phase 1 of campus construction).
1963
Science & Engineering Laboratory, University of Illinois at Chicago Circle
View west during construction of the foundation of the Science & Engineering Laboratory (part of Phase 1 of campus construction).
1963
Science & Engineering Laboratory, University of Illinois at Chicago Circle
Construction of the foundation of the Science & Engineering Laboratory (part of Phase 1 of campus construction).
1963
Science & Engineering Laboratory, University of Illinois at Chicago Circle
View of furniture for a laboratory before installation, during construction of the Science & Engineering Laboratory (part of Phase 1 of campus construction).
1964
Science & Engineering Laboratory, University of Illinois at Chicago Circle
View southwest showing scaffolding in place for work on the underside of the steel roof frame, during construction of Phase 1 of the Science & Engineering Laboratory. A number of concrete "butterfly" columns for the elevated walkway and part of Addams Hall are at the lower right.
1964
Science & Engineering Laboratory, University of Illinois at Chicago Circle
View northwest across South Halsted Street, during later stages of construction of Phase 1 of the Science & Engineering Laboratory.
1964
Science & Engineering Laboratory, University of Illinois at Chicago Circle
Scaffolding in place for adding the brick facing to the exterior walls, during construction of Phase 1 of the Science & Engineering Laboratory. A section of the elevated walkway is at the lower center of the photograph.
1964
Science & Engineering Laboratory, University of Illinois at Chicago Circle
View southeast during construction of the Science & Engineering Laboratory (part of Phase 1 of campus construction) showing work on the building's upper levels. Part of the elevated walkway is visible under construction at the lower right.
1964
Science & Engineering Laboratory, University of Illinois at Chicago Circle
Site preparations for construction of Phase 1 of the Science & Engineering Laboratory.
1963
Union (Student Center East), University of Illinois at Chicago Circle
View of an open area during construction of the Union (part of Phase 1 of campus construction), showing the concrete "waffle slab" ceiling. The building was later renamed the Chicago Circle Center, and is now named Student Center East.
1965
Union (Student Center East), University of Illinois at Chicago Circle
View northwest showing the enclosed elevated walkway between the Union Tower (right) and Union during their construction (part of Phase 1 of campus construction). The Union was later renamed the Chicago Circle Center, and is now named Student Center East.
1965
Union (Student Center East), University of Illinois at Chicago Circle
View of the east facade of the Union (now Student Center East) during construction of its brick walls (part of Phase 1 of campus construction). A large truck-mounted crane is in the foreground. Part of the Union Tower is visible behind it, at the far right of the photograph.
1965
Union (Student Center East), University of Illinois at Chicago Circle
View from the Great Court showing the Union (now Student Center East) under construction (part of Phase 1 of campus construction).
1964
Union (Student Center East), University of Illinois at Chicago Circle
View looking northwest across South Halsted Street at the Union and Tower (now Student Center East and Student Center East Tower) under construction (part of Phase 1 of campus construction). The tower is at the right, with some of the concrete framed window panels installed.
1964
Union (Student Center East), University of Illinois at Chicago Circle
View southwest showing work in progress on the Union (now Student Center East), part of Phase 1 of campus construction. A number of other campus buildings are visible behind it, including the Science and Engineering Laboratory at the upper left, and the Great Court and Lecture Center at the far right.
1964
Union (Student Center East), University of Illinois at Chicago Circle
View southwest during phase 1 of campus construction, showing work in progress on the Union (now Student Center East), with concrete columns in a circular arrangement for the bookstore. At the upper right, the Great Court above the Lecture Center is visible, along with some of the concrete "butterfly" columns installed to support the elevated walkway system.
1964
Union (Student Center East), University of Illinois at Chicago Circle
View southwest during construction of the Union (now Student Center East), part of Phase 1 of campus construction.
1964
Union (Student Center East), University of Illinois at Chicago Circle
View south during early stages of construction of the Union (now Student Center East), part of Phase 1 of campus construction.
1964
Union (Student Center East), University of Illinois at Chicago Circle
View northwest during early stages of construction of the Union (now Student Center East), part of Phase 1 of campus construction.
1964
Union (Student Center East), University of Illinois at Chicago Circle
View northwest during early stages of construction of the Union Tower (now Student Center East Tower), part of Phase 1 of campus construction.
1964
Union (Student Center East), University of Illinois at Chicago Circle
View south during early stages of construction of the Union (now Student Center East), part of Phase 1 of campus construction.
1963
Union (Student Center East), University of Illinois at Chicago Circle
View northwest during construction of the foundation of the Union (now Student Center East), part of Phase 1 of campus construction.
1963
Union (Student Center East), University of Illinois at Chicago Circle
View west during early stages of construction of the Union (now Student Center East), part of Phase 1 of campus construction.
1963
Union (Student Center East), University of Illinois at Chicago Circle
View west during construction of the foundation of the Union Tower (now Student Center East Tower), part of Phase 1 of campus construction.
1963
Union (Student Center East), University of Illinois at Chicago Circle
View southwest during Phase 1 of campus construction, showing construction of the foundations of the Union (now Student Center East).
1963
Building a brick wall around the ComEd substation
Workers excavating a trench along the south facade of the Vernon Park Commonwealth Edison (ComEd) electrical substation on campus, in preparation for constructing a foundation for a brick wall to cover that building's south facade. The substation building and brick wall surrounding the substation were demolished in 2017.
1964
Utilities Building site, University of Illinois at Chicago Circle
View northwest showing a brick wall constructed along the west perimeter of the Utilities Building site (part of Phase 1 of campus construction). A number of buildings on a no longer extant stretch of South Blue Island Avenue are visible beyond it.
1964
Construction of the Lecture Center Buildings, University of Illinois at Chicago Circle
View southwest during construction of the Lecture Center Buildings (part Phase 1 of campus construction), showing installation of metal shoring for site development. A number of other campus buildings are under construction behind the Lecture Center Buildings.
1964
Lecture Center construction, University of Illinois at Chicago Circle
Construction of the Lecture Center Buildings.
1964
Elevated walkway construction, University of Illinois at Chicago Circle
View to the southwest, showing construction of the south part of the elevated walkway just north of West Taylor Street (part of Phase 1 of campus construction) .
1964
1
2
3
4
5
6
Last
Active filters
Creator Facet:
The Gibson Studios
Remove all
Collection
930
Facility Information Management
7
College Of Dentistry -- Class Composite Photographs
Geographic Location
930
Near West Side (Chicago, Ill.)
7
Chicago (Ill.)
Creator
742
Skidmore, Owings & Merrill
78
C.F. Murphy Associates (Chicago, Ill.)
55
A. Epstein and Sons, Inc.
47
Shaw, Metz and Associates
5
Netsch, Walter; Skidmore, Owings & Merrill
3
Skidmore, Owings & Merrill; Netsch, Walter
Contact Us
×