Search for:


Search for:

Showing 1 - 50 of 121 Records
-

Union (Student Center East), University of Illinois at Chicago Circle
View of the Union (now Student Center East) from its southwest corner, built during Phase 1 of campus construction.
1965

Union (Student Center East), University of Illinois at Chicago Circle
View west showing the exterior stairwell and sunken deck at the south end of the Union (now Student Center East), part of Phase 1 of campus construction. The stairway leads to the swimming pool in the basement of the Union. Classroom buildings and the elevated walkway are visible at the upper left.
1965

Union (Student Center East), University of Illinois at Chicago Circle
View of an open area during construction of the Union (part of Phase 1 of campus construction), showing the concrete "waffle slab" ceiling. The building was later renamed the Chicago Circle Center, and is now named Student Center East.
1965

Union (Student Center East), University of Illinois at Chicago Circle
View northwest showing the enclosed elevated walkway between the Union Tower (right) and Union during their construction (part of Phase 1 of campus construction). The Union was later renamed the Chicago Circle Center, and is now named Student Center East.
1965

Union (Student Center East), University of Illinois at Chicago Circle
View of the east facade of the Union (now Student Center East) during construction of its brick walls (part of Phase 1 of campus construction). A large truck-mounted crane is in the foreground. Part of the Union Tower is visible behind it, at the far right of the photograph.
1965

Union (Student Center East), University of Illinois at Chicago Circle
View from the Great Court showing the Union (now Student Center East) under construction (part of Phase 1 of campus construction).
1964

Union (Student Center East), University of Illinois at Chicago Circle
View looking northwest across South Halsted Street at the Union and Tower (now Student Center East and Student Center East Tower) under construction (part of Phase 1 of campus construction). The tower is at the right, with some of the concrete framed window panels installed.
1964

Union (Student Center East), University of Illinois at Chicago Circle
View southwest showing work in progress on the Union (now Student Center East), part of Phase 1 of campus construction. A number of other campus buildings are visible behind it, including the Science and Engineering Laboratory at the upper left, and the Great Court and Lecture Center at the far right.
1964

Union (Student Center East), University of Illinois at Chicago Circle
View southwest during phase 1 of campus construction, showing work in progress on the Union (now Student Center East), with concrete columns in a circular arrangement for the bookstore. At the upper right, the Great Court above the Lecture Center is visible, along with some of the concrete "butterfly" columns installed to support the elevated walkway system.
1964

Union (Student Center East), University of Illinois at Chicago Circle
View southwest during construction of the Union (now Student Center East), part of Phase 1 of campus construction.
1964

Union (Student Center East), University of Illinois at Chicago Circle
View south during early stages of construction of the Union (now Student Center East), part of Phase 1 of campus construction.
1964

Union (Student Center East), University of Illinois at Chicago Circle
View northwest during early stages of construction of the Union (now Student Center East), part of Phase 1 of campus construction.
1964

Union (Student Center East), University of Illinois at Chicago Circle
View northwest during early stages of construction of the Union Tower (now Student Center East Tower), part of Phase 1 of campus construction.
1964

Union (Student Center East), University of Illinois at Chicago Circle
View south during early stages of construction of the Union (now Student Center East), part of Phase 1 of campus construction.
1963

Union (Student Center East), University of Illinois at Chicago Circle
View northwest during construction of the foundation of the Union (now Student Center East), part of Phase 1 of campus construction.
1963

Union (Student Center East), University of Illinois at Chicago Circle
View west during Phase 1 of campus construction, showing work in progress on the foundation of the Union (now Student Center East). A sewer line is visible to the left of the foundation construction, near the center of the image.
1963

Union (Student Center East), University of Illinois at Chicago Circle
View northwest during construction of the foundation of the Union (now Student Center East), part of Phase 1 of campus construction.
1963

Union (Student Center East), University of Illinois at Chicago Circle
View west during early stages of construction of the Union (now Student Center East), part of Phase 1 of campus construction.
1963

Union (Student Center East), University of Illinois at Chicago Circle
View southwest showing excavations and construction of the foundation for the Union (now Student Center East), part of Phase 1 of campus construction. The photograph was shot from the roof of Hull House.
1963

Union (Student Center East), University of Illinois at Chicago Circle
View west during construction of the foundation of the Union Tower (now Student Center East Tower), part of Phase 1 of campus construction.
1963

Union (Student Center East), University of Illinois at Chicago Circle
View southwest during Phase 1 of campus construction, showing construction of the foundations of the Union (now Student Center East).
1963

Union (Student Center East), University of Illinois at Chicago Circle
Workers installing tile around the perimeter of the swimming pool in the Union (renamed Chicago Circle Center, now Student Center East), during Phase 1 of campus construction.
1965

Union Tower (Student Center East Tower), University of Illinois at Chicago Circle
View of the art gallery lounge in the Union Tower (now Student Center East Tower), showing original furniture (built during of Phase 1 of campus construction).
1965

Union (Student Center East), University of Illinois at Chicago Circle
View during Phase 1 of campus construction, showing the east facade of the Union (now Student Center East) with its second story terrace and hanging staircase connecting to ground level. Other design elements including cruciform columns and the waffle slab concrete ceiling are also visible.
1965

Union (Student Center East), University of Illinois at Chicago Circle
View showing scaffolding during construction of the Union Building (renamed Chicago Circle Center, now Student Center East), part of Phase 1 of campus construction.
1965

Union (Student Center East), University of Illinois at Chicago Circle
View southeast during construction of the Union (now Student Center East), part of Phase 1 of campus construction.
1964

Union (Student Center East), University of Illinois at Chicago Circle
View east during construction of the Union (now Student Center East), part of Phase 1 of campus construction. The Union Tower is visible at the far left.
1964

Union (Student Center East), University of Illinois at Chicago Circle
View southwest showing construction of the foundation of the Union Tower (now Student Center East Tower), part of Phase 1 of campus construction.
1963

Union (Student Center East), University of Illinois at Chicago Circle
View northeast showing early stages of construction of the Union (now Student Center East), part of Phase 1 of campus construction. At the top of the photograph, the rear of Hull House (at left, now Jane Addams' Hull-House Museum) and its Residents' Dining Hall (right, now ïŠï¡ï®ï¥ï€ ïï¤ï¤ï¡ï­ï³ï€§ï€ ïˆïµïŠï¡ï®ï¥ï€ ïï¤ï¤ï¡ï­ï³ï€§ï€ ïˆïµï¬ï¬ï€­ïˆï¯ïµï³ï¥ï€ ïïµï³ï¥ïµï­Jane Addams' Hull-House Dining Hall) are visible before their restoration.
1963

Union (Student Center East), University of Illinois at Chicago Circle
View northwest showing the excavated site and early stages of construction of the foundation of the Union (now Student Center East), part of Phase 1 of campus construction.
1963

Union Building (Student Center East), University of Illinois at Chicago Circle
View northeast showing site preparation and installation of a sewer pipe for the Union building (now Student Center East). Jane Addams' Hull House and Hull-House Residents' Dining Hall are in the upper part of the photograph.
1963

Union Building (Student Center East), University of Illinois at Chicago Circle
Elevation drawings for the Union building and Tower (now Student Center East and Student Center East Tower). Includes drawings for a wall-mounted marble drinking fountain, and a bronze wall sleeve for a television. Sheet number A-18.
1963

Union (Student Center East), University of Illinois at Chicago Circle
View southeast showing the Union Tower (now Student Center East Tower) at the upper left, and the Union (now Student Center East) to its right. The double semi-circular stairway leads to a second-floor entrance to both buildings.
1968

Union (Student Center East), University of Illinois at Chicago Circle
View during Phase 1 of campus construction, showing construction of offices along a hallway on the sixth floor of the Union Tower (now Student Center East Tower).
1965

Union (Student Center East), University of Illinois at Chicago Circle
View northwest during Phase 1 of campus construction, showing the enclosed elevated walkway between the Union Tower (right) and Union during their construction. The Union was later renamed the Chicago Circle Center, and is now named Student Center East.
1965

Union (Student Center East), University of Illinois at Chicago Circle
Construction of the Union Tower (now Student Center East Tower), part of Phase 1 of campus construction.
1965

Union (Student Center East), University of Illinois at Chicago Circle
View south showing construction of the Union (now Student Center East), part of Phase 1 of campus construction. Halsted Street runs to the left of it. The Science and Engineering Laboratory is visible behind it, in the upper part of the image, and a number of concrete "butterfly" columns for the elevated walkway are at the right.
1964

Union (Student Center East), University of Illinois at Chicago Circle
View northwest during construction of the Union Tower (now Student Center East Tower), part of Phase 1 of campus construction. Some of the concrete window panels have been installed.
1964

Union (Student Center East), University of Illinois at Chicago Circle
Construction of the Union (now Student Center East), part of Phase 1 of campus construction.
1964

Union (Student Center East), University of Illinois at Chicago Circle
View southeast during early stages of construction of the Union (now Student Center East), part of Phase 1 of campus construction. The foundation for one of the ventilation structures is in the foreground. The top of the Science and Engineering Laboratory is visible in the distance at the upper right.
1964

Union (Student Center East), University of Illinois at Chicago Circle
View northeast during early stages of construction of the Union (now Student Center East), part of Phase 1 of campus construction.
1964

Union (Student Center East), University of Illinois at Chicago Circle
View northeast during Phase 1 of campus construction, showing early stages of construction of the Union (now Student Center East).
1963

Union (Student Center East), University of Illinois at Chicago Circle
View southwest in winter during early stages of construction of the Union (now Student Center East), part of Phase 1 of campus construction. The swimming pool is at the center of the image.
1963

Union (Student Center East), University of Illinois at Chicago Circle
View north during construction of the foundation of the Union (now Student Center East), part of Phase 1 of campus construction.
1963

Union (Student Center East), University of Illinois at Chicago Circle
View northeast during construction of the foundation of the Union (now Student Center East), part of Phase 1 of campus construction.
1963

Union (Student Center East), University of Illinois at Chicago Circle
View northeast during construction of the foundation of the Union (now Student Center East), part of Phase 1 of campus construction. A sewer line is at the left.
1963

Union (Student Center East), University of Illinois at Chicago Circle
View west during Phase 1 of campus construction, showing an excavation with a steel saddle for a sewer line, part of the early stages of construction for the Union (now Student Center East).
1963

Union (Student Center East), University of Illinois at Chicago Circle
View southwest showing excavations and construction of the foundation for the Union (now Student Center East), part of Phase 1 of campus construction.
1963

Union (Student Center East), University of Illinois at Chicago Circle
Construction of the swimming pool in the basement of the Union (renamed Chicago Circle Center, now Student Center East), part of Phase 1 of campus construction.
1965

Union Tower (Student Center East Tower), University of Illinois at Chicago Circle
View during Phase 1 of campus construction, showing the north facade of the Union Tower during late stages of construction. (The building was renamed Chicago Circle Center Tower, and is now Student Center East Tower.)
1965