Search for:


Search for:

Showing 1 - 50 of 128 Records
-

Art & Architecture Building, University of Illinois at Chicago Circle
View east during site preparations for construction of the Art & Architecture Building (part of Phase 2 of campus construction). South Halsted Street runs across the upper part of the photograph, and the intersection with West Harrison Street is at the upper left.
1966

Utilities Building addition, University of Illinois at Chicago Circle
Workers spreading gravel and doing finishing work on the roof of the first addition to the Utilities Building (part of Phase 2 of campus construction).
1967

Utilities Building addition, University of Illinois at Chicago Circle
Installation and ventilation of equipment during construction of the first addition to the Utilities Building (part of Phase 2 of campus construction).
1967

Utilities Building addition, University of Illinois at Chicago Circle
View northeast in winter during construction of the first addition to the Utilities Building, with the steel framework in place (part of Phase 2 of campus construction).
1967

Utilities Building addition, University of Illinois at Chicago Circle
View northeast during early stages of construction of the first addition to the Utilities Building, located on the west end of the original building (part of Phase 2 of campus construction).
1966

Utilities Building addition, University of Illinois at Chicago Circle
View northeast showing construction of the foundation for the first addition to the Utilities Building (part of Phase 2 of campus construction). The brick wall around the site's perimeter and the structure surrounding the cooling towers are partially visible at the top of the photograph.
1966

Utilities Building addition, University of Illinois at Chicago Circle
Workers constructing the foundation for the first addition to the Utilities Building (part of Phase 2 of campus construction), located on the west end of the original building. Wooden forms for poured concrete and reinforcing bars are visible.
1966

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View northwest during site preparations for construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A planned south addition remained unbuilt.
1966

Union (Student Center East), University of Illinois at Chicago Circle
View of the Union (now Student Center East) from its southwest corner, built during Phase 1 of campus construction.
1965

Union (Student Center East), University of Illinois at Chicago Circle
View west showing the exterior stairwell and sunken deck at the south end of the Union (now Student Center East), part of Phase 1 of campus construction. The stairway leads to the swimming pool in the basement of the Union. Classroom buildings and the elevated walkway are visible at the upper left.
1965

Parking lots, University of Illinois at Chicago Circle
View looking west, showing construction of campus Parking Lots 1A and 1B, located between West Vernon Park Place (on the left) and West Harrison Street (right).
1965

Halsted Street and Hull House, University of Illinois at Chicago Circle
View northeast over South Halsted Street toward the downtown Loop, showing site development at the lawn south of the Union (now Student Center East), with a brick paved plaza adjacent, along Halsted Street. The Hull House Residents' Dining Hall is at the left.
1965

Staff and Administrative Offices Building (University Hall), University of Illinois at Chicago Circle
View west from the elevated walkway showing installation of the concrete-framed window panels on the top floor of the Staff and Administrative Offices Building (University Hall).
1965

Staff and Administrative Offices Building (University Hall), University of Illinois at Chicago Circle
View of a second-floor building entrance at the Staff and Administrative Offices Building (University Hall), with a revolving door, adjacent to an elevator. A mail chute, trash can, and ashtray are to the left of the elevator doorway.
1965

Utilities Building addition, University of Illinois at Chicago Circle
View of the north and west sides of the first addition to the Utilities Building (part of Phase 2 of campus construction). looking through a gap in the brick wall which runs along the perimeter of the site.
1967

Utilities Building addition, University of Illinois at Chicago Circle
View of equipment installation during construction of the first addition to the Utilities Building (part of Phase 2 of campus construction).
1967

Utilities Building addition, University of Illinois at Chicago Circle
Construction in progress on the first addition to the Utilities Building (part of Phase 2 of campus construction).
1967

Utilities Building addition, University of Illinois at Chicago Circle
Interior work during construction of the first addition to the Utilities Building (part of Phase 2 of campus construction).
1967

Utilities Building addition, University of Illinois at Chicago Circle
View during installation of the steel framework for the first addition to the Utilities Building (part of Phase 2 of campus construction).
1967

Utilities Building addition, University of Illinois at Chicago Circle
View of site preparations for the addition to the cooling towers the Utilities Building complex (part of Phase 2 of campus construction). A number of steel reinforcing bars (rebar) are on the ground. The existing cooling tower structure is at the upper left.
1966

Union (Student Center East), University of Illinois at Chicago Circle
Workers installing tile around the perimeter of the swimming pool in the Union (renamed Chicago Circle Center, now Student Center East), during Phase 1 of campus construction.
1965

Union Tower (Student Center East Tower), University of Illinois at Chicago Circle
View of the art gallery lounge in the Union Tower (now Student Center East Tower), showing original furniture (built during of Phase 1 of campus construction).
1965

Union (Student Center East), University of Illinois at Chicago Circle
View during Phase 1 of campus construction, showing the east facade of the Union (now Student Center East) with its second story terrace and hanging staircase connecting to ground level. Other design elements including cruciform columns and the waffle slab concrete ceiling are also visible.
1965

Circle Forum under construction
View of the Circle Forum during construction. Brick pavement with openings for tree planting is in the foreground. One of the Lecture Center Buildings is at the right.
1965

Campus view towards Burnham Hall
View southeast from the elevated walkway, showing a circular open area paved with hexagonal bricks and planted with trees. Four storage pavilions are also located here. Burnham Hall is behind that, in the upper center of the photograph.
1965

Site preparation adjacent to the Union, University of Illinois at Chicago Circle
Site preparation adjacent to the Union Building (renamed Chicago Circle Center, now Student Center East).
1965

Classroom Buildings, University of Illinois at Chicago Circle
View during Phase 1 of campus construction, showing Taft, Burnham and Addams Halls (originally named Classroom Building 608B, Classroom Building 608C, and Classroom Building 608A). Addams Hall is on the left, and Burnham Hall is behind it. Students are seated on the plaza between the buildings. An enclosed elevated walkway connects Burnham Hall with Taft Hall.
1965

Staff and Administrative Offices Building (University Hall), University of Illinois at Chicago Circle
View showing installation of built-in shelving and cupboards on the 28th floor of the Staff and Administrative Offices Building (University Hall).
1965

Staff and Administrative Offices Building (University Hall), University of Illinois at Chicago Circle
View from above during construction of the curved walkways leading from street level to the second floor of the Staff and Administrative Offices Building (University Hall).
1965

Staff and Administrative Offices Building (University Hall), University of Illinois at Chicago Circle
View northwest during installation of the concrete-framed window panels on the top floor of the Staff and Administrative Offices Building (University Hall).
1965

Staff and Administrative Offices Building (University Hall), University of Illinois at Chicago Circle
View southeast across West Harrison Street, showing exterior construction on the upper floors of the Staff and Administrative Offices Building (University Hall) nearing completion. The curved walkways outside the west side of the building are also visible.
1965

Science & Engineering Offices, University of Illinois at Chicago Circle
Beginning stages of construction of the Science & Engineering Offices building (part of Phase 2 of campus construction).
1966

Utilities Building addition, University of Illinois at Chicago Circle
Workers on roof during construction of the first addition to the Utilities Building (part of Phase 2 of campus construction).
1967

Union (Student Center East), University of Illinois at Chicago Circle
View during Phase 1 of campus construction, showing construction of offices along a hallway on the sixth floor of the Union Tower (now Student Center East Tower).
1965

Parking lots, University of Illinois at Chicago Circle
View looking west, showing Parking Lots 1A and 1B with completed paving and striping, and parked cars. The parking lots are located between West Vernon Park Place (on the left) and West Harrison Street (right).
1965

Circle Forum, University of Illinois at Chicago Circle
View of the Circle Forum, located at the center of the Lecture Center Buildings. A brick-paved area with openings for tree plantings is in the foreground.
1965

Campus entrance from Halsted Street, University of Illinois at Chicago Circle
View northeast showing a campus entryway from South Halsted Street, located north of the Union (Student Center East). The brick wall around the campus perimeter is visible in the upper part of the photograph.
1965

Halsted Street and Hull House, University of Illinois at Chicago Circle
View southeast along South Halsted Street. The wall of the Union (now Student Center East) is at the far right, and Hull House (now Jane Addams' Hull-House Museum) is visible in the distance between that and Halsted Street.
1965

Campus view during construction, University of Illinois at Chicago Circle
View southeast during Phase 1 of campus construction, showing the intersection of South Halsted Street and West Taylor Street. The site for the Plant Research Laboratory is at the southeast corner of that intersection
1965

Campus view during construction, University of Illinois at Chicago Circle
View west during Phase 1 of campus construction, showing sites prepared for development. The Eisenhower Expressway is in the upper right of the image.
1965

Staff and Administrative Offices Building (University Hall), University of Illinois at Chicago Circle
View from the elevated walkway showing a brick wall and ground level concrete work adjacent to the east side of the Staff and Administrative Offices Building (University Hall).
1965

Staff and Administrative Offices Building (University Hall), University of Illinois at Chicago Circle
View during interior work on the 28th floor of the Staff and Administrative Offices Building (University Hall), including installation of wood paneling.
1965

Staff and Administrative Offices Building (University Hall), University of Illinois at Chicago Circle
View of a window panel being hoisted to the 28th floor (top floor) of the Staff and Administrative Offices Building (University Hall) during construction.
1965

Henry Hall, University of Illinois at Chicago Circle
View northwest showing site preparations for construction of Classroom Building 626 (Henry Hall), part of Phase 2 of campus construction.
1966

Utilities Building addition, University of Illinois at Chicago Circle
Installation of pipes and other equipment in the first addition to the Utilities Building (part of Phase 2 of campus construction).
1967

Utilities Building addition, University of Illinois at Chicago Circle
View of cooling equipment installed during construction of the first addition to the Utilities Building (part of Phase 2 of campus construction).
1967

Utilities Building addition, University of Illinois at Chicago Circle
View of the completed exterior brick wall on the north side of the first addition to the Utilities Building, with scaffolding still in place (part of Phase 2 of campus construction).
1967

Utilities Building addition, University of Illinois at Chicago Circle
Installation of equipment during construction of the first addition to the Utilities Building (part of Phase 2 of campus construction).
1967

Utilities Building addition, University of Illinois at Chicago Circle
View from above showing construction of the foundation for the addition to the cooling towers structure, part of the Utilities Building complex, during Phase 2 of campus construction.
1966

Union (Student Center East), University of Illinois at Chicago Circle
Construction of the swimming pool in the basement of the Union (renamed Chicago Circle Center, now Student Center East), part of Phase 1 of campus construction.
1965