Search for:


Search for:

Showing 1 - 7 of 7 Records
-

Proposed Student Services Classroom-Office Building, University of Illinois at Chicago Circle
Drawings for the proposed (Phase 3 of campus construction) Student Services Building Classroom-Office Building, with typical north and south wall sections, and details drawings including masonry, typical column, typical head, and typical sill.
1970

Proposed Student Services Classroom-Office Building, University of Illinois at Chicago Circle
First floor plan for the proposed (Phase 3 of campus construction) Student Services Building Classroom-Office Building, with Room Finish Schedule.
1970

Proposed Student Services Classroom-Office Building, University of Illinois at Chicago Circle
Second floor plan for the proposed (Phase 3 of campus construction) Student Services Building Classroom-Office Building, with Classroom Office Building (COB) Annex, roof plan, door schedule, and Classroom Office Building (COB) room finish schedule.
1970

Proposed Student Services Classroom/Office Building, University of Illinois at Chicago Circle
Second floor plan for the proposed (Phase 3 of campus construction) Student Services Building and Classroom/Office Building, with ventilation schedule.
1970

Education & Communications Building, University of Illinois at Chicago Circle
South, west, east, and north exterior elevation drawings for the Education & Communications Building, built during Phase 3 of campus construction. Sheet number A3-1.
1968

Proposed Student Services Classroom-Office Building, University of Illinois at Chicago Circle
Property line and topography survey (Plat of Survey) for the proposed (Phase 3 of campus construction) Student Services Building Classroom-Office Building, for the area along West Harrison Street between South Morgan and South Halsted Streets.
1970

Proposed Student Services Classroom-Office Building, University of Illinois at Chicago Circle
Index of Drawings for the proposed Student Services Building Classroom-Office Building, 624 & 636, including architectural, structural, mechanical & plumbing, and electrical drawings. Part of Phase 3 of campus construction.
1970