Showing 401 - 450 of 2148 Records
-

Library addition, University of Illinois at Chicago Circle
View northeast showing building the brick walls during construction of the addition at the south end of the library (part of Phase 2 of campus construction).
1967

Library addition, University of Illinois at Chicago Circle
View showing construction on the fourth floor of the addition at the north end of the library (part of Phase 2 of campus construction).
1967

Library addition, University of Illinois at Chicago Circle
View north showing construction of the upper floors of the addition at the south end of the library (part of Phase 2 of campus construction). University Hall is in the distance.
1967

Library addition, University of Illinois at Chicago Circle
View southwest showing construction of the second floor of the addition at the south end of the library (part of Phase 2 of campus construction).
1967

Library addition, University of Illinois at Chicago Circle
Campus view showing construction of the addition at the north end of the library (part of Phase 2 of campus construction). The Great Court and Circle Forum are visible to the left of the library, as well as part of the elevated walkway system. Stevenson Hall is visible under construction at the lower part of the photograph. South Morgan Street is at the right of the photograph.
1967

Library addition, University of Illinois at Chicago Circle
View northwest across South Morgan Street, showing construction of the foundation for the addition at the north end of the library (part of Phase 2 of campus construction).
1966

Library addition, University of Illinois at Chicago Circle
View northwest across South Morgan Street, showing early stages of construction of the addition at the north end of the library (part of Phase 2 of campus construction).
1966

Library addition, University of Illinois at Chicago Circle
View west towards South Morgan Street, showing the excavation for the addition at the south end of the library (part of Phase 2 of campus construction).
1966

Library addition, University of Illinois at Chicago Circle
Excavation for construction of the addition at the south end of the Library (part of Phase 2 of campus construction).
1966

Library addition, University of Illinois at Chicago Circle
View showing excavation for the addition at the north end of the library (part of Phase 2 of campus construction). Part of the Great Court and Circle Forum are visible at the upper left, and South Morgan Street is at the right.
1966

Library addition, University of Illinois at Chicago Circle
View of the site at the north end of the library before construction of the addition (part of Phase 2 of campus construction). Part of the Great Court and Circle Forum are visible at the upper left, and South Morgan Street is at the right.
1966

Library addition, University of Illinois at Chicago Circle
View northwest towards South Morgan Street, showing the site at the north end of the library before construction of the addition (part of Phase 2 of campus construction).
1966

Science & Engineering Laboratory, University of Illinois at Chicago Circle
View southwest during construction of the Science & Engineering Laboratory (Phase 1), showing the third floor being added. Supports for the elevated walkway are visible in the lower part of the photograph.
1964

Science & Engineering Laboratory, University of Illinois at Chicago Circle
View during early stages of construction of the Science & Engineering Laboratory (part of Phase 1 of campus construction).
1963

Science & Engineering Laboratory, University of Illinois at Chicago Circle
View during early stages of construction of the Science & Engineering Laboratory (part of Phase 1 of campus construction), showing concrete columns at the first floor level.
1963

Science & Engineering Laboratory, University of Illinois at Chicago Circle
View during early stages of construction of the Science & Engineering Laboratory (part of Phase 1 of campus construction).
1963

Science & Engineering Laboratory, University of Illinois at Chicago Circle
Construction of the Science & Engineering Laboratory (part of Phase 1 of campus construction).
1964

Science & Engineering Laboratory, University of Illinois at Chicago Circle
View along a hallway during construction of the Science & Engineering Laboratory (part of Phase 1 of campus construction).
1965

Science & Engineering Laboratory, University of Illinois at Chicago Circle
View during Phase 1 of campus construction, showing work in progress on the upper levels of the Science & Engineering Laboratory. The large concrete piers are in place.
1964

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1968

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View along a hallway during late stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A doorway to a classroom is open at the right.
1968

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A wall-mounted blackboard is at the left.
1968

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Installation of pipes, countertops and hardware including faucets in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Building in progress on the south facade exterior brick walls, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Southwest corner of the building showing exterior walls being built, during later stages of construction on the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The building's steel-frame roof structure is also visible.
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View east during later stages of construction on the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction), showing exterior walls being built. The building's steel-frame roof structure is also visible.
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Installation of ductwork and pipes during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View of the building's concrete structure, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View in winter looking northeast from the elevated walkway, showing construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View north along the elevated walkway during construction of the upper levels of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View southeast during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View northeast in winter during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A planned south addition remained unbuilt.
1966

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View northwest from South Halsted Street in winter during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1966

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Construction of the foundation for the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1966

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View southeast during early stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1966

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View northeast during early stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A planned south addition remained unbuilt.
1966

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View southeast during early stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The elevated walkway is visible crossing over West Taylor Street in the upper part of the photograph, and the intersection of West Taylor Street and South Halsted Street is at the far left.
1966

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View northwest during early stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1966

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Construction of the foundation for the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1966

Utilities Building and Blue Island Avenue, University of Illinois at Chicago Circle
View southwest showing the Utilities Building (upper left), part of Phase 1 of campus construction. A no longer extant stretch of South Blue Island Avenue is at the right.
1964

Lecture Center construction, University of Illinois at Chicago Circle
Construction of the foundation, Lecture Center Buildings.
1964

Lecture Center construction, University of Illinois at Chicago Circle
View southeast during construction of the foundation for one of the Lecture Center buildings.
1964

Lecture Center construction, University of Illinois at Chicago Circle
View southwest showing roof construction on Lecture Center A.
1964

Campus view during construction, University of Illinois at Chicago Circle
View of campus during Phase 1 of construction, looking southeast. The Commonwealth Edison (ComEd) electrical substation (demolished 2017) is at the center of the image, with concrete columns installed for the elevated walkway system in front of it. Jefferson Hall is in the left foreground.
1964

Elevated walkway construction, University of Illinois at Chicago Circle
Construction of the elevated walkway system, showing concrete "butterfly" columns and granite walkway slabs supported by them (part of Phase 1 of campus construction).
1964

Site excavation, University of Illinois at Chicago Circle
View east during Phase 1 of campus construction, showing excavation of a site on the north side of Roosevelt Road. The Physical Plant Building is partially visible at the upper left. Roosevelt Road is at the upper right.
1964

Lecture Center construction, University of Illinois at Chicago Circle
Construction of the foundation, Lecture Center Buildings.
1964

Lecture Center construction, University of Illinois at Chicago Circle
Construction of the foundation, Lecture Center Buildings.
1964

Lecture Center construction, University of Illinois at Chicago Circle
View southeast during construction of foundations for the Lecture Center Buildings. The Union (now Student Center East) is under construction behind it.
1964

Lecture Center construction, University of Illinois at Chicago Circle
Construction of the foundation of Lecture Center Buildings.
1963