Skip to content
Home
Collections
Digital Exhibits
Help
Contact Us
Login
UIC Library Digital Collections (Beta)
Basic
Advanced
Search in fulltext
Search
Search for
:
Objects
Collections
Field
Any
Title
Creator
Contributor
Description
Identifier
Address
Building Name
Geographic Location
Collection
Subject--Genre
Subject--Name
Subject--Topic
Collection Code
Series
Condition
Must
Must not
Should
Type of search
Contain
Equal
Starts with
Value
Value
Value
Value
Add more criteria
Search for
:
Objects
Collections
Clear
Search
Display
List
Timeline
Gallery
Map
Showing
351 - 400 of 2148
Records
Sort by
:
Number of results to display
:
Filter
1
×
Drag the filter control on desktop. The Timeline feature is in beta and does not currently work on mobile devices.
-
Apply range
Henry Hall, University of Illinois at Chicago Circle
View looking southeast from West Harrison Street showing Classroom Building 626 (Henry Hall) near completion (part of Phase 2 of campus construction). Part of the elevated walkway is visible behind it on either side.
1967
Henry Hall, University of Illinois at Chicago Circle
View looking southwest from West Harrison Street showing Classroom Building 626 (Henry Hall) near completion (part of Phase 2 of campus construction). Part of University Hall is visible behind it.
1967
Stevenson Hall, University of Illinois at Chicago Circle
View southwest from the elevated walkway showing exterior construction of Classroom Building 627 (Stevenson Hall) near completion (part of Phase 2 of campus construction). Construction of the addition to the library is visible behind it to the left.
1967
Stevenson Hall, University of Illinois at Chicago Circle
View northeast with exterior construction of Classroom Building 627 (Stevenson Hall) nearing completion, part of Phase 2 of campus construction. Openings in the facade allow delivery of building materials for interior work.
1967
Stevenson Hall, University of Illinois at Chicago Circle
View northeast during the late stages of the exterior construction of Stevenson Hall (originally named Classroom Building 627), part of Phase 2 of campus construction.Openings in the facade allow delivery of building materials for interior work.
1967
Stevenson Hall, University of Illinois at Chicago Circle
View from the elevated walkway showing ground level and below-ground work during construction of Classroom Building 627 (Stevenson Hall) (at the upper right.) Temporary utility lines are in the foreground. The library is at the upper left.
1967
Stevenson Hall, University of Illinois at Chicago Circle
View southwest from the elevated walkway showing the three-story concrete frame and ceilings constructed for Classroom Building 627 (Stevenson Hall), part of Phase 2 of campus construction. The library is behind it at the left.
1967
Stevenson Hall, University of Illinois at Chicago Circle
View northeast showing construction of the second and third floors of Classroom Building 627 (Stevenson Hall), part of Phase 2 of campus construction.
1966
Stevenson Hall, University of Illinois at Chicago Circle
View southwest showing construction of the foundation for Classroom Building 627 (Stevenson Hall), part of Phase 2 of campus construction. Part of the library is visible at the upper left.
1966
Stevenson Hall, University of Illinois at Chicago Circle
View northwest during the late stages of construction of Classroom Building 627 (Stevenson Hall), part of Phase 2 of campus construction. University Hall is visible behind it.
1967
Henry Hall, University of Illinois at Chicago Circle
View of the south facade (entrance facade) of Classroom Building 626 (Henry Hall) at a late stage of construction. The second floor walkway connecting the building to Jefferson Hall is under construction at the right. Part of a sign with a campus logo designed by Walter Netsch is at the lower left.
1967
Stevenson Hall Hall, University of Illinois at Chicago Circle
View northeast showing construction of the foundation for Classroom Building 627 (Stevenson Hall), part of Phase 2 of campus construction. The elevated walkway is visible behind it.
1966
Henry Hall, University of Illinois at Chicago Circle
View southeast during the late stages of construction of Classroom Building 626 (Henry Hall), part of Phase 2 of campus construction.
1967
Henry Hall, University of Illinois at Chicago Circle
View northwest during construction of Classroom Building 626 (Henry Hall), part of Phase 2 of campus construction, showing ground level window panels installed. The second floor walkway connecting the building to Jefferson Hall is under construction at the right. Part of a sign with a campus logo designed by Walter Netsch is at the lower left.
1967
Henry Hall, University of Illinois at Chicago Circle
View southeast during later stages of construction of Classroom Building 626 (Henry Hall), showing installation of window panels (part of Phase 2 of campus construction).
1966
Art & Architecture Building, University of Illinois at Chicago Circle
View east towards the downtown Loop, showing early stages of construction of the Art & Architecture Building (part of Phase 2 of campus construction).
1966
Art & Architecture Building, University of Illinois at Chicago Circle
View southeast showing early stages of construction of the Art & Architecture Building (part of Phase 2 of campus construction). The Union and Union Tower (now Student Center East and Student Center East Tower) are in the distance in the upper center.
1966
Art & Architecture Building, University of Illinois at Chicago Circle
View southeast showing excavations south of the Art & Architecture Building (part of Phase 2 of campus construction). Douglas Hall is at the upper right.
1966
Henry Hall, University of Illinois at Chicago Circle, Phase 2
View northeast from the elevated walkway showing construction of the first and second floors of Classroom Building 626 (Henry Hall), built during Phase 2 of campus construction. Jefferson Hall is behind it to the right.
1966
Henry Hall, University of Illinois at Chicago Circle, Phase 2
View southeast showing construction of the first floor of Classroom Building 626 (Henry Hall), part of Phase 2 of campus construction. Jefferson Hall is behind it at the upper left.
1966
Library, University of Illinois at Chicago Circle
View northwest along one of the Library balconies during construction, showing its concrete railing (part of Phase 1 of campus construction).
1964
Library, University of Illinois at Chicago Circle
View of the west side and south end of the Library during construction (part of Phase 1 of campus construction), showing installation of brick walls and metal framing for windows.
1964
Library, University of Illinois at Chicago Circle
View southeast showing construction of the foundation of the Library (part of Phase 1 of campus construction).
1963
Library, University of Illinois at Chicago Circle
View northeast during early stages of construction of the Library (part of Phase 1 of campus construction).
1963
Library, University of Illinois at Chicago Circle
View northeast during early stages of construction of the Library (part of Phase 1 of campus construction).
1963
Library, University of Illinois at Chicago Circle
View northeast showing construction of the foundation of the Library (part of Phase 1 of campus construction).
1963
Library, University of Illinois at Chicago Circle
View northeast during early stages of construction of the Library (part of Phase 1 of campus construction).
1963
Library addition, University of Illinois at Chicago Circle
Staff work area in the library, located in the north end addition (part of Phase 2 of campus construction).
1968
Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View during interior construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1967
Library addition, University of Illinois at Chicago Circle
View southeast showing construction of the upper levels and roof of the addition at the north end of the library (part of Phase 2 of campus construction). Part of the Great Court, Circle Forum, and elevated walkway are visible at the upper left. Stevenson Hall is at the lower left.
1967
Library addition, University of Illinois at Chicago Circle
View northwest showing construction on the roof of the addition at the south end of the library (part of Phase 2 of campus construction).
1967
Library addition, University of Illinois at Chicago Circle
View southwest during construction of the fourth floor of the addition to the south end of the Library (part of Phase 2 of campus construction). Storage pavilions are visible in the foreground.
1967
Library addition, University of Illinois at Chicago Circle
View showing construction of the addition at the north end of the library (part of Phase 2 of campus construction). Part of the Great Court is visible at the upper left.
1967
Library addition, University of Illinois at Chicago Circle
View southeast showing construction of the second floor of the addition at the north end of the library (part of Phase 2 of campus construction).
1967
Library addition, University of Illinois at Chicago Circle
View in winter during construction of the second floor of the addition at the south end of the library (part of Phase 2 of campus construction).
1967
Library addition, University of Illinois at Chicago Circle
View northwest across South Morgan Street, showing construction of the first floor of the addition at the north end of the library (part of Phase 2 of campus construction).
1967
Library addition, University of Illinois at Chicago Circle
Campus view showing construction of the addition at the north end of the library (part of Phase 2 of campus construction). Part of the elevated walkway system, Great Court, and Circle Forum are visible at the left. Stevenson Hall is visible under construction at the bottom of the photograph.
1967
Library addition, University of Illinois at Chicago Circle
View to the east showing construction of the foundation for the addition at the north end of the library (part of Phase 2 of campus construction).
1966
Library addition, University of Illinois at Chicago Circle
View to the northeast in winter, showing early stages of construction of the addition at the south end of the library (part of Phase 2 of campus construction).
1966
Library addition, University of Illinois at Chicago Circle
View west towards South Morgan Street, showing the foundation in place for the addition at the south end of the library (part of Phase 2 of campus construction).
1966
Library addition, University of Illinois at Chicago Circle
View west towards South Morgan Street, showing work on the foundation for the addition at the north end of the library (part of Phase 2 of campus construction).
1966
Library addition, University of Illinois at Chicago Circle
View to the east showing early stages of construction of the addition at the north end of the library (part of Phase 2 of campus construction).
1966
Library addition, University of Illinois at Chicago Circle
View north along the west side of the library, showing construction materials and equipment during Phase 2 of campus construction.
1966
Library addition, University of Illinois at Chicago Circle
View showing the site at the north end of the library before construction of the addition (part of Phase 2 of campus construction).
1966
Library addition, University of Illinois at Chicago Circle
View north along the west side of the library, showing workers at the building site during Phase 2 of campus construction. University Hall is behind them.
1966
Library addition, University of Illinois at Chicago Circle
View south showing the site at the north end of the library before construction of the addition (part of Phase 2 of campus construction). Exedrae on the Great Court are visible at the left.
1966
Library addition, University of Illinois at Chicago Circle
View of work in progress on an interior space in the library addition (part of Phase 2 of campus construction).
1968
Library addition, University of Illinois at Chicago Circle
View northwest showing the south end of the library addition near completion (part of Phase 2 of campus construction).
1968
Library addition, University of Illinois at Chicago Circle
Interior construction work on the additions to the library (part of Phase 2 of campus construction).
1967
Library addition, University of Illinois at Chicago Circle
Interior construction work on the additions to the library (part of Phase 2 of campus construction).
1967
First
3
4
5
6
7
8
9
10
11
12
13
Last
Active filters
Creator Facet:
Skidmore, Owings & Merrill
Remove all
Creator
897
McShane Fleming Studios
742
The Gibson Studios
71
Architectural Camera, Ltd.
Medium
1472
black-and-white prints (photographs)
670
black-and-white negatives
6
color prints (photographs)
Contact Us
×