Search for:


Search for:

Showing 251 - 300 of 2148 Records
-

Staff and Administrative Offices Building (University Hall), University of Illinois at Chicago Circle
View southeast across West Harrison Street, showing exterior construction on the upper floors of the Staff and Administrative Offices Building (University Hall) nearing completion.
1965

Staff and Administrative Offices Building (University Hall), University of Illinois at Chicago Circle
View northwest showing construction in progress on the upper floors of the Staff and Administrative Offices Building (University Hall).
1965

Staff and Administrative Offices Building (University Hall), University of Illinois at Chicago Circle
View of a meeting room under construction at the center of one of the floors of the Staff and Administrative Offices Building (University Hall). The glass doors at the left provide access to the hallway and offices located around the perimeter of the building.
1965

Staff and Administrative Offices Building (University Hall), University of Illinois at Chicago Circle
Tiled room in the Staff and Administrative Offices Building (University Hall), with plumbing installed for bathroom fixtures.
1964

Staff and Administrative Offices Building (University Hall), University of Illinois at Chicago Circle
View southeast across West Harrison Street, showing construction in progress on the upper floors of the Staff and Administrative Offices Building (University Hall).
1964

Staff and Administrative Offices Building (University Hall), University of Illinois at Chicago Circle
View northwest showing construction in progress on the upper floors of the Staff and Administrative Offices Building (University Hall).
1964

Staff and Administrative Offices Building (University Hall), University of Illinois at Chicago Circle
View of a southwest corner of the Staff and Administrative Offices Building (University Hall) before installation of the window panels.
1964

Staff and Administrative Offices Building (University Hall), University of Illinois at Chicago Circle
View west showing construction in progress on the upper floors of the Staff and Administrative Offices Building (University Hall).
1964

Staff and Administrative Offices Building (University Hall), University of Illinois at Chicago Circle
View southeast showing construction in progress on the upper floors of the Staff and Administrative Offices Building (University Hall).
1964

Staff and Administrative Offices Building (University Hall), University of Illinois at Chicago Circle
View of mechanical room with pipes installed along ceiling, during construction of the Staff and Administrative Offices Building (University Hall).
1964

Staff and Administrative Offices Building (University Hall), University of Illinois at Chicago Circle
View southeast showing construction in progress on the lower floors of the Staff and Administrative Offices Building (University Hall).
1964

Staff and Administrative Offices Building (University Hall), University of Illinois at Chicago Circle
Large concrete support piers rising from ground level at the Staff and Administrative Offices Building (University Hall).
1963

Staff and Administrative Offices Building (University Hall), University of Illinois at Chicago Circle
Interior work on the foundation of the Staff and Administrative Offices Building (University Hall).
1963

Staff and Administrative Offices Building (University Hall), University of Illinois at Chicago Circle
View southwest showing construction on the lower floors of the Staff and Administrative Offices Building (University Hall).
1963

Staff and Administrative Offices Building (University Hall), University of Illinois at Chicago Circle
View northwest during early stages of construction of the Staff and Administrative Offices Building (University Hall).
1963

Staff and Administrative Offices Building (University Hall), University of Illinois at Chicago Circle
View southwest showing construction of the foundation for the Staff and Administrative Offices Building (University Hall).
1963

Behavioral Sciences Building, University of Illinois at Chicago Circle
North and south exterior elevation drawings for the Behavioral Sciences Building. Sheet number A-14.
1967

Elevated walkways, University of Illinois at Chicago Circle
Elevation drawings for north and south parts of the campus elevated walkway. Sheet number A-7.
1962

Staff and Administrative Offices Building (University Hall), University of Illinois at Chicago Circle
West elevation of University Hall (originally named Staff and Administrative Offices Building), shown sideways on sheet. Sheet number A-11.
1962

Parking Lot, University of Illinois at Chicago Circle
View of the entrance to Parking Lot 1A, looking southwest from West Harrison Street.
1967

Parking Lots, University of Illinois at Chicago Circle
View northwest showing university parking lots located between West Harrison Street, at the left, and the Eisenhower Expressway (I-290), to the right. Parking Lot 11, near the lower center of the photograph has cars parked on it; another parking lot and the Racine Avenue Building are beyond it. Parking Lots 1A and 1B are partially visible at the far left, and the intersection of West Harrison Street and South Racine Avenue is at the upper left.
1967

Parking Lot, University of Illinois at Chicago Circle
View southwest in winter towards the intersection of South Racine Avenue and West Harrison Street, during Phase 2 of campus construction. A parking lot is under construction in the foreground. This site is now the location of the UIC Pavilion.
1967

Parking Lot, University of Illinois at Chicago Circle
View southwest during construction of a parking lot at the northeast corner of West Harrison Street and South Racine Avenue. Racine Avenue runs across the top of the photograph, and the intersection with West Harrison Street is near the top center. This site is now occupied by the UIC Pavilion.
1966

Art & Architecture Building, University of Illinois at Chicago Circle
View southeast showing the Art & Architecture Building (part of Phase 2 of campus construction). The enclosed elevated walkway leading from the building passes over the Commonwealth Edison (ComEd) electrical substation (demolished 2017) and connects with the main north-south spine of the walkway at the bottom of the photograph. South Halsted Street runs along the top of the photograph, and the intersection with West Harrison Street is at the upper left. The Union Tower (now Student Center East Tower) is at the upper right.
1968

Art & Architecture Building, University of Illinois at Chicago Circle
View northeast showing part of the north end of the Art & Architecture Building (built during Phase 2 of campus construction) before exterior landscaping.
1968

Plant Research Laboratory, University of Illinois at Chicago Circle
View west showing the Plant Research Laboratory (part of Phase 2 of campus construction), located at the southeast corner of South Halsted and West Taylor Streets. A paved driveway leading to the building is in the foreground.
1967

Site development, University of Illinois at Chicago Circle
View northwest showing demolition of existing building located on a parcel of land between West Harrison Street (lower left) and the Eisenhower Expressway (upper right), during Phase 2 of campus construction. The Education & Communications Building (now Education, Theatre, Music, and Social Work, ETMSW) would later be built on this site.
1966

Plant Research Laboratory, University of Illinois at Chicago Circle
View southeast looking across the intersection of South Halsted and West Taylor Streets, showing site preparations for the Plant Research Laboratory (part of Phase 2 of campus construction).
1966

Campus view with Great Court and elevated walkway
View of the Circle Forum, and Great Court above the Lecture Centers, during removal. A portion of the elevated walkway system is also visible. The Great Court, Circle Forum, and elevated walkway system were demolished over a six-year period extending from 1993 to 1999.
1993

Campus view with Great Court and elevated walkway
View of the Circle Forum, and Great Court above the Lecture Centers, during removal of one of the exedrae atop the Great Court. A portion of the elevated walkway system is also visible. The Great Court, Circle Forum, and elevated walkway system were demolished over a six-year period extending from 1993 to 1999.
1993

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Preparations for installation of a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1968

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View of a laboratory in the later stages of installation, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1968

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View of a mechanical room, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View northwest showing the completed exterior brick wall on the south facade, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The exterior concrete pylons and steel-framed roof structure are also visible.
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View northeast from the southwest corner of the building, showing the completed exterior brick walls during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The exterior concrete pylons and steel-frame roof structure are also visible.Part of the elevated walkway is visible at the right, where it passes through the building.
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Installation of pipes, countertops and hardware including faucets for a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Installation of ductwork during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Installation of pipes, countertops and hardware including faucets for a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View east during construction of the center addition to the Science and Engineering Laboratory (part of Phase 2 of campus construction). The exterior brick walls and steel-frame roof structure are in place. Part of the elevated walkway is visible at the right.
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View east showing construction in progress on the center addition to the Science and Engineering Laboratory (part of Phase 2 of campus construction). The exterior brick walls and steel-frame roof structure are in place. Part of the elevated walkway is visible at the right.
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Building in progress on the south facade exterior brick walls, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View east during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction), showing the completed exterior brick wall on the west facade.
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Building interior during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View east during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View north along the elevated walkway during construction of the upper levels of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Installation of ductwork and pipes during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View northeast during construction of the third floor of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1967

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View southeast in winter from the balcony of the original building (part of Phase 1 of campus construction), during work on the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1966

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View southeast during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). South Halsted Street is in the distance in the upper part of the photograph.
1966

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View northwest during site preparations for construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1966