Library addition, University of Illinois at Chicago Circle
View southwest showing building of exterior brick walls, during later stages of construction of the addition at the north end of the library (part of Phase 2 of campus construction).
1967

Library addition, University of Illinois at Chicago Circle
View northwest showing building the brick walls during construction of the addition at the south end of the library (part of Phase 2 of campus construction).
1967

Library addition, University of Illinois at Chicago Circle
View during construction, showing the east facade of the addition at the south end of the library (part of Phase 2 of campus construction).
1967

Library addition, University of Illinois at Chicago Circle
View in winter showing construction of the first floor of the addition at the north end of the library (part of Phase 2 of campus construction), at the upper right. Part of the elevated walkway system and Great Court are visible at the upper left. Stevenson Hall is at the lower left.
1967

Library addition, University of Illinois at Chicago Circle
View southeast showing construction of the first floor of the addition at the north end of the library (part of Phase 2 of campus construction).
1967

Library addition, University of Illinois at Chicago Circle
View northwest showing construction of the addition at the north end of the library (part of Phase 2 of campus construction). South Morgan Street and neighborhood buildings beyond it are visible at the upper right.
1967

Library addition, University of Illinois at Chicago Circle
Concrete structural element visible during construction of additions to the Library (part of Phase 2 of campus construction).
1966

Library addition, University of Illinois at Chicago Circle
View northwest in winter across South Morgan Street, showing construction of the first floor of the addition at the south end of the library (part of Phase 2 of campus construction).
1966

Library addition, University of Illinois at Chicago Circle
View west towards South Morgan Street, showing the early stages of construction of the addition at the south end of the library (part of Phase 2 of campus construction).
1966

Library addition, University of Illinois at Chicago Circle
Excavation for construction of the addition at the south end of the Library (part of Phase 2 of campus construction).
1966

Library addition, University of Illinois at Chicago Circle
View north along the west side of the library, showing the site for the north end addition to the library (part of Phase 2 of campus construction). University Hall is in the distance.
1966

Library addition, University of Illinois at Chicago Circle
View of the site for the Library addition (part of Phase 2 of campus construction).
1966

Library addition, University of Illinois at Chicago Circle
Used tires laid side by side to mark a walkway at the building site at the Library during Phase 2 of campus construction
1966

Library addition, University of Illinois at Chicago Circle
View of an interior space in the library addition, with work nearing completion (part of Phase 2 of campus construction).
1968

Library addition, University of Illinois at Chicago Circle
View of an interior space in the library addition (part of Phase 2 of campus construction), with work nearing completion.
1968

Library addition, University of Illinois at Chicago Circle
Staff work area in the library, located in the north end addition (part of Phase 2 of campus construction).
1968

Library addition, University of Illinois at Chicago Circle
View at ground level inside the library's north end addition (part of Phase 2 of campus construction). Students are using typewriters and a library employee is at the left. A temporary wall divider is at the far right. The Lecture Center is visible outside the windows.
1968

Library addition, University of Illinois at Chicago Circle
View of interior space construction in the additions to the library (part of Phase 2 of campus construction).
1967

Library addition, University of Illinois at Chicago Circle
View north showing the south end library addition during late stages of construction (part of Phase 2 of campus construction).
1967

Library addition, University of Illinois at Chicago Circle
View northwest showing the addition on the south end of the library (part of Phase 2 of campus construction), during later stages of construction. University Hall is in the distance at the right.
1967

Library addition, University of Illinois at Chicago Circle
Campus view showing later stages of construction on the additions at both ends of the library (part of Phase 2 of campus construction). Part of the Great Court, Circle Forum, and elevated walkway are visible to the left of the library. South Morgan Street is at the right of the photograph.
1967

Library addition, University of Illinois at Chicago Circle
View northeast during construction of the addition on the south end of the library (part of Phase 2 of campus construction). Scaffolding is in place for building the exterior walls.
1967

Library addition, University of Illinois at Chicago Circle
View southeast showing scaffolding in place for building the exterior walls, during construction of the addition at the north end of the library (part of Phase 2 of campus construction).
1967

Library addition, University of Illinois at Chicago Circle
View of mechanical room during construction of the additions to the Library (part of Phase 2 of campus construction).
1967

Library addition, University of Illinois at Chicago Circle
View northeast showing building of the brick walls during construction of the addition at the south end of the library (part of Phase 2 of campus construction).
1967

Library addition, University of Illinois at Chicago Circle
View southeast showing construction of the fourth floor of the addition at the north end of the library (part of Phase 2 of campus construction).
1967

Library addition, University of Illinois at Chicago Circle
View northeast showing construction of the addition at the south end of the library (part of Phase 2 of campus construction). The area that extends out at the right will enclose a stairway.
1967

Library addition, University of Illinois at Chicago Circle
View northeast showing construction of the fourth floor of the addition at the south end of the library (part of Phase 2 of campus construction). University Hall is visible at the extreme left.
1967

Library addition, University of Illinois at Chicago Circle
View northeast in winter showing construction of the second floor of the addition at the south end of the library (part of Phase 2 of campus construction). University Hall is at the upper left.
1967

Library addition, University of Illinois at Chicago Circle
View northwest in winter across South Morgan Street, showing construction of the first floor of the addition at the south end of the library (part of Phase 2 of campus construction). Part of Burnham Hall is visible at the lower right, and the Science & Engineering Offices are under construction at the left.
1966

Library addition, University of Illinois at Chicago Circle
View to the northeast showing early stages of construction of the addition at the south end of the library (part of Phase 2 of campus construction).
1966

Library addition, University of Illinois at Chicago Circle
View west towards South Morgan Street, showing the early stages of construction of the addition at the south end of the library (part of Phase 2 of campus construction).
1966

Library addition, University of Illinois at Chicago Circle
View west towards South Morgan Street, showing the site at the south end of the library before construction of the addition (part of Phase 2 of campus construction).
1966

Science & Engineering Laboratory, University of Illinois at Chicago Circle
View during early stages of construction of the Science & Engineering Laboratory (part of Phase 1 of campus construction).
1964

Science & Engineering Laboratory, University of Illinois at Chicago Circle
Construction of the foundation of the Science & Engineering Laboratory (part of Phase 1 of campus construction).
1963

Science & Engineering Laboratory, University of Illinois at Chicago Circle
View west during construction of the foundation of the Science & Engineering Laboratory (part of Phase 1 of campus construction).
1963

Science & Engineering Laboratory, University of Illinois at Chicago Circle
Construction of the foundation of the Science & Engineering Laboratory (part of Phase 1 of campus construction).
1963

Science & Engineering Laboratory, University of Illinois at Chicago Circle
Worker on wooden scaffolding around a concrete pier, during construction of the Science & Engineering Laboratory (part of Phase 1 of campus construction).
1964

Science & Engineering Laboratory, University of Illinois at Chicago Circle
Construction of the Science & Engineering Laboratory (part of Phase 1 of campus construction).
1965

Science & Engineering Laboratory, University of Illinois at Chicago Circle
View of furniture for a laboratory before installation, during construction of the Science & Engineering Laboratory (part of Phase 1 of campus construction).
1964

Science & Engineering Laboratory, University of Illinois at Chicago Circle
View southwest showing scaffolding in place for work on the underside of the steel roof frame, during construction of Phase 1 of the Science & Engineering Laboratory. A number of concrete "butterfly" columns for the elevated walkway and part of Addams Hall are at the lower right.
1964

Science & Engineering Laboratory, University of Illinois at Chicago Circle
View northwest across South Halsted Street, during later stages of construction of Phase 1 of the Science & Engineering Laboratory.
1964

Science & Engineering Laboratory, University of Illinois at Chicago Circle
Scaffolding in place for adding the brick facing to the exterior walls, during construction of Phase 1 of the Science & Engineering Laboratory. A section of the elevated walkway is at the lower center of the photograph.
1964

Science & Engineering Laboratory, University of Illinois at Chicago Circle
View southeast during construction of the Science & Engineering Laboratory (part of Phase 1 of campus construction) showing work on the building's upper levels. Part of the elevated walkway is visible under construction at the lower right.
1964

Science & Engineering Laboratory, University of Illinois at Chicago Circle
View northeast during construction of the Science & Engineering Laboratory (part of Phase 1 of campus construction).
1964

Science & Engineering Laboratory, University of Illinois at Chicago Circle
Site preparations for construction of Phase 1 of the Science & Engineering Laboratory.
1963

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View of a glass-enclosed bulletin board mounted in the center of a hallway, during late stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1968

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
View along a hallway looking towards an entrance to the building, during late stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1968

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Installation of cabinetry and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1968

Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
1968