Search for:


Search for:

Showing 51 - 100 of 2148 Records
-

Science & Engineering Offices, University of Illinois at Chicago Circle
View northeast across South Morgan Street showing the completed Science & Engineering Offices building (part of Phase 2 of campus construction). The brick wall marking the campus' west perimeter is in the foreground, and the Library is visible to the left.
1967

Science & Engineering Offices, University of Illinois at Chicago Circle
View northwest showing exterior construction near completion on the Science & Engineering Offices building (part of Phase 2 of campus construction). The Library and the Staff and Administrative Offices Building (University Hall) are behind it to the right.
1967

Science & Engineering Offices, University of Illinois at Chicago Circle
View north showing an excavation for underground work adjacent to the north side of the Science & Engineering Offices building (part of Phase 2 of campus construction). The south end of the Library is at the upper left.
1967

Science & Engineering Offices, University of Illinois at Chicago Circle
View southwest during construction of the thirteenth floor of the Science & Engineering Offices building (part of Phase 2 of campus construction). Concrete-framed window panels have been installed on a number of the building's floors. Burnham Hall is in the left foreground.
1967

Science & Engineering Offices, University of Illinois at Chicago Circle
View showing fire damage at top of site during construction of the Science & Engineering Offices building (part of Phase 2 of campus construction).
1967

Science & Engineering Offices, University of Illinois at Chicago Circle
Detail of fire damage at site during construction of the Science & Engineering Offices building (part of Phase 2 of campus construction).
1967

Science & Engineering Offices, University of Illinois at Chicago Circle
View southeast during construction of the fifth floor of the Science & Engineering Offices building (part of Phase 2 of campus construction). The southwest gateway to the campus at South Morgan Street is in the foreground, featuring a brick-paved plaza, granite benches, granite bollards, and a fence designed by Walter Netsch. Divided horizontally into three sections, the fence features vertical members spaced further and further apart as it rises, a design theme echoed in the three-stepped structure of University Hall.
1967

Science & Engineering Offices, University of Illinois at Chicago Circle
Detail of exterior concrete wall at the Science & Engineering Offices building (built during Phase 2 of campus construction).
1966

Science & Engineering Offices, University of Illinois at Chicago Circle
View northeast during construction of the fourth floor of the Science & Engineering Offices building (part of Phase 2 of campus construction).
1966

Science & Engineering Offices, University of Illinois at Chicago Circle
View southwest during construction of the first floor of the Science & Engineering Offices building (part of Phase 2 of campus construction).
1966

Science & Engineering Offices, University of Illinois at Chicago Circle
View northwest showing construction of the foundation for the Science & Engineering Offices building (part of Phase 2 of campus construction), with forms for poured concrete visible. Neighborhood buildings across South Morgan Street are visible in the upper part of the photograph.
1966

Library addition, University of Illinois at Chicago Circle
View southeast showing the addition at the north end of the library (part of Phase 2 of campus construction).
1968

Library addition, University of Illinois at Chicago Circle
View southeast showing the addition at the north end of the library (part of Phase 2 of campus construction). The entrance to the loading dock is at the lower right.
1968

Library addition, University of Illinois at Chicago Circle
View of a space inside the Library addition at the north end of the building (part of Phase 2 of campus construction).
1968

Library addition, University of Illinois at Chicago Circle
Library addition (part of Phase 2 of campus construction), showing open area and work areas.
1968

Art & Architecture Building, University of Illinois at Chicago Circle
View looking south showing an excavated area south of the construction site for the Art & Architecture Building. Douglas Hall is at the upper right.
1966

Art & Architecture Building, University of Illinois at Chicago Circle
View southwest during Phase 2 of campus construction, showing excavation of a site south of the Art & Architecture Building. Douglas Hall is partially visible at the right.
1966

Art & Architecture Building, University of Illinois at Chicago Circle
View west during construction of the Art & Architecture Building (part of Phase 2 of campus construction). The Commonwealth Edison (ComEd) electric substation and University Hall are visible behind it.
1966

Art & Architecture Building, University of Illinois at Chicago Circle
Construction of the foundation of the Art & Architecture Building (part of Phase 2 of campus construction).
1966

Art & Architecture Building, University of Illinois at Chicago Circle
View east during site preparations for construction of the Art & Architecture Building (part of Phase 2 of campus construction). South Halsted Street runs across the upper part of the photograph, and the intersection with West Harrison Street is at the upper left.
1966

Art & Architecture Building, University of Illinois at Chicago Circle
View northeast showing glazing work on the pyramid-shaped skylights at the south end of the Art & Architecture Building, during the late stages of the building's construction (part of Phase 2 of campus construction).
1968

Art & Architecture Building, University of Illinois at Chicago Circle
View from below during work on a large pyramid-shaped skylight at the south end of the Art & Architecture Building (part of Phase 2 of campus construction).
1968

Art & Architecture Building, University of Illinois at Chicago Circle
View east along the enclosed elevated walkway connecting the Art & Architecture Building with the main spine of the campus walkway system, during installation of windows (part of Phase 2 of campus construction).
1968

Art & Architecture Building, University of Illinois at Chicago Circle
View of hallway with stairs in the Art & Architecture Building, during installation of tile flooring (part of Phase 2 of campus construction).
1968

Art & Architecture Building, University of Illinois at Chicago Circle
View on the first floor of the Art & Architecture Building, showing a hallway with stairways during installation of tile flooring (part of Phase 2 of campus construction).
1968

Art & Architecture Building, University of Illinois at Chicago Circle
View during late stages of construction of the Art & Architecture Building (part of Phase 2 of campus construction), showing a basement studio on the east side of the building, with open views to the first and second floors (in the distance at top center).
1968

Art & Architecture Building, University of Illinois at Chicago Circle
View of the granite-floored first floor gallery adjacent to the main entrance of the Art & Architecture Building, during late stages of construction (part of Phase 2 of campus construction).
1968

Art & Architecture Building, University of Illinois at Chicago Circle
View during late stages of construction of the Art & Architecture Building (part of Phase 2 of campus construction), showing a second floor studio with a concrete staircase up to the third floor.
1968

Art & Architecture Building, University of Illinois at Chicago Circle
View of an octagonal atrium in the Art & Architecture Building during later stages of that building's construction (part of Phase 2 of campus construction).
1967

Art & Architecture Building, University of Illinois at Chicago Circle
View of pipes and ductwork in a mechanical room during late stages of construction of the Art & Architecture Building (part of Phase 2 of campus construction).
1967

Art & Architecture Building, University of Illinois at Chicago Circle
View of a concrete stairway in an atrium area, during interior construction of the Art & Architecture Building (part of Phase 2 of campus construction). A number of skylights are in the ceiling.
1967

Art & Architecture Building, University of Illinois at Chicago Circle
View northwest during later stages of construction of the Art & Architecture Building (part of Phase 2 of campus construction), with scaffolding in place for the installation of brick facing at the south end of the building. Jefferson Hall and University Hall are behind it at the upper left. The elevated walkway runs in front of Jefferson Hall and over West Harrison Street, leading to the CTA train station.
1967

Art & Architecture Building, University of Illinois at Chicago Circle
View southwest during later stages of construction of the Art & Architecture Building (part of Phase 2 of campus construction). Douglas Hall is behind it to the left, and University Hall rises behind it at the right.
1967

Art & Architecture Building, University of Illinois at Chicago Circle
View showing scaffolding in place during installation of brick facing on exterior walls at the north end of the Art & Architecture Building (part of Phase 2 of campus construction).
1967

Art & Architecture Building, University of Illinois at Chicago Circle
View northwest during construction of the upper levels at the south end and east side of the Art & Architecture Building (part of Phase 2 of campus construction). University Hall is beyond it at the far left.
1967

Art & Architecture Building, University of Illinois at Chicago Circle
View north showing scaffolding in place for construction of cinder block walls in the Art & Architecture Building (part of Phase 2 of campus construction).
1967

Art & Architecture Building, University of Illinois at Chicago Circle
View southeast during construction of the Art & Architecture Building (part of Phase 2 of campus construction).
1967

Art & Architecture Building, University of Illinois at Chicago Circle
View northwest showing construction in progress at the south end of the Art & Architecture Building (part of Phase 2 of campus construction). University Hall is partially visible at the left.
1967

Art & Architecture Building, University of Illinois at Chicago Circle
View north during construction of the upper levels of the Art & Architecture Building (part of Phase 2 of campus construction), with an excavated area to the south of it in the foreground. A corner of Douglas Hall is visible at the far left.
1967

Art & Architecture Building, University of Illinois at Chicago Circle
View east towards the downtown Loop showing construction in progress on the Art & Architecture Building (part of Phase 2 of campus construction). The elevated walkway is visible at the bottom of the photograph, and a number of campus buildings are at the far right: the Union building and Tower (now Student Center East and Tower), and Douglas and Grant Halls. West Harrison Street runs up the left side of the image, and the intersection with South Halsted Street is at the middle left. The Dan Ryan Expressway (I-94) and part of the Circle interchange are in the upper part of the photograph, beyond Halsted Street. The old Post Office is at the top left.
1967

Art & Architecture Building, University of Illinois at Chicago Circle
View northwest in winter during construction of the Art & Architecture Building (part of Phase 2 of campus construction). Jefferson Hall is visible at the upper left. The elevated walkway runs in front of it and over West Harrison Street, leading to the CTA train station.
1966

Excavated site, University of Illinois at Chicago Circle
Construction of underground infrastructure in an excavated site south of the Art & Architecture Building, during Phase 2 of campus construction.
1966

Art & Architecture Building, University of Illinois at Chicago Circle
View southwest showing construction of the lower level walls for the Art & Architecture Building (part of Phase 2 of campus construction). Several campus buildings are visible in the distance, including the Union Tower (Student Center East Tower) and Union (Student Center East) at the left. Douglas Hall stands to the right of these.
1966

Art & Architecture Building, University of Illinois at Chicago Circle
View northeast showing construction of the foundation and lower level walls of the Art & Architecture Building (part of Phase 2 of campus construction).
1966

Art & Architecture Building, University of Illinois at Chicago Circle
View southwest showing construction of the foundation of the Art & Architecture Building (part of Phase 2 of campus construction). Douglas Hall is at the top center of the photograph, and Grant Hall is to the right.
1966

Henry Hall, University of Illinois at Chicago Circle
View of a classroom in Classroom Building 626 (Henry Hall), part of Phase 2 of campus construction, showing a Nesbitt heater unit in the center.
1967

Henry Hall, University of Illinois at Chicago Circle
View during a late stage of construction, showing the south facade (entrance facade) of Classroom Building 626 (Henry Hall), part of Phase 2 of campus construction. The second floor walkway connecting the building to Jefferson Hall is visible under construction at the right. Part of a sign with a campus logo designed by Walter Netsch is at the lower left.
1967

Stevenson Hall, University of Illinois at Chicago Circle
View northwest with exterior construction of Classroom Building 627 (Stevenson Hall) nearing completion (part of Phase 2 of campus construction). Work below ground is in progress on the east side of the building (lower right of the photograph). Temporary utility lines are in the lower right foreground. University Hall is visible at the top right.
1967

Stevenson Hall, University of Illinois at Chicago Circle
View southeast during construction of Classroom Building 627 (Stevenson Hall), part of Phase 2 of campus construction, showing installation of concrete-framed window panels on the upper levels, and steel framing for first floor windows.
1967

Stevenson Hall, University of Illinois at Chicago Circle
View looking west during construction of the foundation of Classroom Building 627 (Stevenson Hall), part of Phase 2 of campus construction.
1966