ComEd electrical substation, University of Illinois at Chicago Circle
Image nop
View of standing water along a brick wall at the Commonwealth Edison (ComEd) electrical substation on campus in the aftermath of flooding at the construction site of the Art & Architecture Building. The original substation building and the surrounding brick wall were demolished in 2017.
Date:
circa 1966
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing a locker room with rows of lockers installed on low raised concrete slabs and wooden benches between them. The room has a coffered concrete ceiling.
Date:
November 25, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the Physical Education Building (part of Phase 3 of campus construction), showing exterior work near completion. Saint Francis of Assisi Church is in the distance at the left.
Date:
October 23, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest showing the south and east sides of the Physical Education Building (part of Phase 3 of campus construction) during later stages of work, with exterior brick walls completed.
Date:
October 23, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing electrical wiring and work on walls.
Date:
July 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building, showing the swimming pool with the roof in place over the steel support structure.
Date:
May 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing a locker room with a coffered concrete ceiling. Lockers were installed on the low raised slabs.
Date:
April 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast in winter during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the building's steel framing.
Date:
January 23, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest showing steel framing for the roof structure above the swimming pool, during construction of the Physical Education Building (part of Phase 3 of campus construction).
Date:
December 22, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the Physical Education Building (part of Phase 3 of campus construction), showing installation of steel framing for the roof structure and vertical supports.
Date:
December 22, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the Physical Education Building (part of Phase 3 of campus construction), showing framing in place for the roof structure and vertical supports. The swimming pool is at the upper right. Roosevelt Road is at the left.
Date:
November 16, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast showing early stages of construction of the Physical Education Building (part of Phase 3 of campus construction). The swimming pool is at the upper left, with a construction crane working in it. Roosevelt Road is visible at the lower left of the photograph.
Date:
October 18, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southwest showing early stages of construction of the Physical Education Building (part of Phase 3 of campus construction). The swimming pool is visible at the left, with a construction crane working in it. Roosevelt Road is at the bottom of the photograph, and South Morgan Street is at the upper right.
Date:
October 18, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View of a mechanical room during construction of the Physical Education Building (part of Phase 3 of campus construction).
Date:
September 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the first floor of the Physical Education Building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is at the upper right, and the downtown Loop skyline is visible in the distance at the left.
Date:
September 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). South Morgan Street is at the bottom of the image, and Roosevelt Road is at the left. Saint Francis of Assisi Church is at the top right.
Date:
July 16, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). The Science & Engineering Offices building is in the distance at the left.
Date:
June 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). The Science & Engineering Offices building is in the distance at the left.
Date:
June 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). Roosevelt Road runs across the center of the image.
Date:
May 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction).
Date:
May 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction).
Date:
April 22, 1969
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Preparations for installation of a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View of a laboratory in the later stages of installation, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View of a mechanical room, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
December 29, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northwest showing the completed exterior brick wall on the south facade, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The exterior concrete pylons and steel-framed roof structure are also visible.
Date:
November 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northeast from the southwest corner of the building, showing the completed exterior brick walls during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The exterior concrete pylons and steel-frame roof structure are also visible.Part of the elevated walkway is visible at the right, where it passes through the building.
Date:
November 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of pipes, countertops and hardware including faucets for a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
October 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of ductwork during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
August 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of pipes, countertops and hardware including faucets for a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
July 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View east during construction of the center addition to the Science and Engineering Laboratory (part of Phase 2 of campus construction). The exterior brick walls and steel-frame roof structure are in place. Part of the elevated walkway is visible at the right.
Date:
June 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View east showing construction in progress on the center addition to the Science and Engineering Laboratory (part of Phase 2 of campus construction). The exterior brick walls and steel-frame roof structure are in place. Part of the elevated walkway is visible at the right.
Date:
May 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Building in progress on the south facade exterior brick walls, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
April 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View east during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction), showing the completed exterior brick wall on the west facade.
Date:
April 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Building interior during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
February 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View east during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
February 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View north along the elevated walkway during construction of the upper levels of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of ductwork and pipes during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the third floor of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View southeast in winter from the balcony of the original building (part of Phase 1 of campus construction), during work on the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
December 29, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). South Halsted Street is in the distance in the upper part of the photograph.
Date:
November 25, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northwest during site preparations for construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
June 1, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southeast showing exterior construction completed at the Science & Engineering Offices building (part of Phase 2 of campus construction). The southwest entrance to the campus from South Morgan Street is visible in the foreground, and the brick wall that marks the campus' west perimeter is at the right.
Date:
April 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View west during construction showing a space with ground floor windows on the north side of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
March 28, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View of an office in the Science & Engineering Offices building with built-in shelving and cabinets. The narrow windows feature the Block I design.
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View northwest showing exterior construction near completion at the Science & Engineering Offices building (part of Phase 2 of campus construction). The scissor staircase, a unique feature of Netsch's design, is visible. The library and University Hall are visible behind it at the right.
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southeast across South Morgan Street showing exterior construction near completion of the Science & Engineering Offices building (part of Phase 2 of campus construction). Scaffolding is in place for work on the scissor stairs.
Date:
December 29, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southwest during construction of the thirteenth floor of the Science & Engineering Offices building (part of Phase 2 of campus construction). Concrete-framed window panels have been installed on most of the building's floors. Burnham Hall is in the left foreground, and the south end of the library is just visible at the right.
Date:
October 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southwest during construction of the thirteenth floor of the Science & Engineering Offices building (part of Phase 2 of campus construction). Concrete window panels have been installed on a number of the building's floors. Burnham Hall is in the left foreground.
Date:
September 29, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View during construction of the Science & Engineering Office building (part of Phase 2 of campus construction), showing underground work adjacent to that building.
Date:
August 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the eleventh floor of the Science & Engineering Offices building (part of Phase 2 of campus construction). Concrete-framed window panels have been installed on a number of the building's floors. The Library and the Staff and Administrative Offices Building (University Hall) are visible behind it at the right.
Date:
July 27, 1967
Collection:
Facility Information Management
Access:
Public access