Search for:


Search for:

Showing 1 - 50 of 1110 Records
ComEd electrical substation, University of Illinois at Chicago Circle
Image nop
View north from within the brick walls surrounding the Commonwealth Edison (ComEd) electrical substation on campus (demolished 2017). A small amount of standing water remains after flooding at the construction site of the Art & Architecture Building.
Date:
circa 1966
Collection:
Facility Information Management
Access:
Public access


Flooding during construction of Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
Construction worker standing against the south wall of Art & Architecture Building during its construction (part of Phase 2 of campus construction). Part of a large is flooded area at the building's south end is visible at the lower left.
Date:
circa 1966
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building showing the main swimming pool near completion. There are spectator bleachers along the sides, and behind the pool's deep end.
Date:
November 25, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest showing the south side of the Physical Education Building (part of Phase 3 of campus construction), with exterior construction completed. In the foreground, an access lane for vehicles runs behind the building.
Date:
November 25, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View of the smaller swimming pool during construction of the Physical Education Building, showing the completed roof and interior brickwork on the walls.
Date:
July 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View of the gymnasium during construction of the Physical Education Building (part of Phase 3 of campus construction). The steel-frame roof structure is visible.
Date:
July 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the gymnasium with the roof installed over the steel support structure.
Date:
May 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building, showing the completed roof over the swimming pool and interior brickwork.
Date:
April 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the completed roof over the gymnasium.
Date:
April 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the gymnasium roof installed over the steel structure.
Date:
March 21, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View south during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the roof installed over the steel structure on the west part of the building. The steel roof structure is visible over the swimming pool at the left. Roosevelt Road is in the lower part of the photograph. South Morgan Street is at the upper right.
Date:
March 21, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View showing coffered concrete ceiling and installation of pipes during construction of the Physical Education Building (part of Phase 3 of campus construction).
Date:
January 23, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast in winter during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the building's steel framing. Saint Francis of Assisi Church is in the distance at the left.
Date:
January 23, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast from inside the swimming pool during construction of the Physical Education Building (part of Phase 3 of campus construction), showing steel framing above for the roof structure.
Date:
December 22, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southwest during construction of the Physical Education Building (part of Phase 3 of campus construction). The swimming pool is on the left side of the building. Roosevelt Road runs diagonally across the lower part of the photograph, and the intersection with South Morgan Street is visible at the far right.
Date:
November 16, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during early stages of construction of the Physical Education Building (part of Phase 3 of campus construction). The swimming pool is visible near the top of the photograph, with a construction crane working in it. Roosevelt Road is at the left.
Date:
October 18, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast showing early stages of construction of the Physical Education Building (part of Phase 3 of campus construction). The swimming pool is at the left, with a construction crane working in it. Roosevelt Road is at the bottom of the photograph.
Date:
October 18, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest showing poured concrete for the first floor of the Physical Education Building (part of Phase 3 of campus construction).
Date:
September 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast showing the foundation of the Physical Education Building during construction (part of Phase 3 of campus construction). The Science & Engineering Laboratory and Science & Engineering South are behind it, and the downtown Loop skyline is visible in the distance.
Date:
September 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during early stages of construction of the Physical Education Building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is near the center of the image.
Date:
August 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View south showing construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). Roosevelt Road runs across the bottom of the image, and part of South Morgan Street is visible in the upper right corner.
Date:
July 16, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). Cars on Roosevelt Road are visible beyond the construction site, at the center of the image.
Date:
June 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). Saint Francis of Assisi Church and Roosevelt Road are at the left.
Date:
June 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southwest during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction).
Date:
May 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southwest showing excavations and early stages of construction of the Physical Education Building (part of Phase 3 of campus construction).
Date:
March 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southwest showing excavations and preparations for construction of the Physical Education Building (part of Phase 3 of campus construction). Roosevelt Road is at the far right.
Date:
February 20, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View west of an excavated site for construction of the Physical Education Building (part of Phase 3 of campus construction), showing a pipe with a meter attached.
Date:
January 22, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View west showing site preparations for construction of the Physical Education Building (part of Phase 3 of campus construction). Roosevelt Road is in the distance at the right.
Date:
January 22, 1969
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
March 28, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
March 28, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View of the completed facade of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A planned south addition remained unbuilt. A section of the elevated walkway is visible at the far left of the photograph.
Date:
March 28, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View looking northeast during late stages of construction on the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). Part of the elevated walkway is visible at the lower right of the photograph.
Date:
March 28, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View along a hallway during late stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A wall-mounted ashtray is at the left.
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of built-in furniture for a laboratory, and hardware including faucets, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
December 29, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northwest showing the completed exterior brick wall on the south facade, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The exterior concrete pylons and steel-framed roof structure are also visible.
Date:
September 29, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of pipes for a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
July 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction), showing the building's exterior nearing completion, and installation of windows on the fourth floor. The exterior concrete pylons and steel-frame roof structure are also visible.
Date:
July 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction), showing work in progress on the exterior brick walls. The exterior concrete pylons and steel-framed roof structure are also visible.
Date:
May 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northeast showing building of exterior walls and scaffolding around the large concrete piers, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
March 28, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Basement mechanical room during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
March 28, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View east during later stages of construction on the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction), showing exterior walls being built. The building's steel-frame roof structure is also visible.
Date:
March 28, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Construction of the foundation for the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
November 25, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northeast during early stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
October 26, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northeast during early stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
September 30, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northeast showing construction of the foundation for the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
July 28, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View of stairway during construction of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
May 28, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View east during interior construction of the Science & Engineering Offices building (part of Phase 2 of campus construction), showing a large first floor office space with floor to ceiling windows on the north side of the building.
Date:
April 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View northwest showing exterior construction completed at the Science & Engineering Offices building (part of Phase 2 of campus construction). The scissor staircase, a unique feature of Netsch's design, is visible.
Date:
March 28, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View of elevator lobby in the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access