Parking Lots, University of Illinois at Chicago Circle
Image nop
View northwest in winter during construction of university parking lots located between West Harrison Street, at the left, and the Eisenhower Expressway (I-290), at the right. Parking Lot 11 is the square dark lot near the center of the photograph; another parking lot and the Racine Avenue Building are beyond it. The intersection of West Harrison Street and South Racine Avenue is visible at the upper left.
Date:
January 4, 1967
Collection:
Facility Information Management
Access:
Public access


Parking Lots, University of Illinois at Chicago Circle
Image nop
View northwest showing construction of parking lots between West Harrison Street, on the left side of the photograph, and the Eisenhower Expressway (I-290) at the upper right. Parking Lot 11 is under construction in the upper part of the image, with another lot and the Racine Avenue building beyond it. The intersection of West Harrison Street and South Racine Avenue is just visible at the top left corner.
Date:
November 26, 1966
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View northeast showing the west side and south end of the Art & Architecture Building (built during Phase 2 of campus construction) before exterior landscaping.
Date:
April 25, 1968
Collection:
Facility Information Management
Access:
Public access


Parking Lots, University of Illinois at Chicago Circle
Image nop
View east showing site preparations for parking lots located between the Eisenhower Expressway (1-290) at the left, and West Harrison Street, at the right. The site in the foreground is now occupied by a parking garage, the Harrison Street Parking Structure. Construction of Parking Lot 11 is visible in the center of the photo. University Hall is at the upper right.
Date:
September 30, 1966
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago
Image nop
View northeast from the south end of the Art & Architecture Building (now Architecture and Design Studios). The exterior walls visible at the right were left without brick facing in anticipation of a planned addition. A top corner of University Hall is just visible at the far left.
Date:
1990s
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View east showing the Art & Architecture Building (part of Phase 2 of campus construction). The enclosed elevated walkway leading from the building passes over the Commonwealth Edison (ComEd) electrical substation and connects with the main north-south spine of the walkway at the bottom of the photograph. West Harrison Street is at the left, and the intersection with South Halsted Street is at the upper left. The Union Tower (now Student Center East Tower) is at the upper right.
Date:
August 28, 1968
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View northwest showing the south end of the Art & Architecture Building (part of Phase 2 of campus construction), with Douglas Hall at the left. In the left foreground, circular storage pavilions stand in an area paved with brick and planted with trees.
Date:
May 28, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View southwest showing the truck entrances on the west side of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
April 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory and Elevated Walkway, University of Illinois at Chicago Circle
Image nop
View northeast during Phase 2 of campus construction showing the south side of the Science & Engineering Laboratory (now Science & Engineering Laboratory East and Science & Engineering Laboratory West) with the elevated walkway passing through the building and crossing above West Taylor Street (at right).
Date:
April 25, 1968
Collection:
Facility Information Management
Access:
Public access


Elevated walkway, University of Illinois at Chicago Circle
Image nop
View southeast of the enclosed elevated walkway leading from the Art & Architecture Building across the top of the Vernon Park Commonwealth Edison (ComEd) electrical substation (demolished 2017). This unique part of the elevated walkway was built with a box frame truss.
Date:
April 25, 1968
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View northeast looking towards the south end of the Art & Architecture Building (part of Phase 2 of campus construction). Downtown Loop buildings are in the distance at the right.
Date:
April 25, 1968
Collection:
Facility Information Management
Access:
Public access


Memorial Grove site, University of Illinois at Chicago Circle
Image nop
View southwest showing site preparations at West Taylor and South Morgan Streets, the location of the southwest garden, named the Harry W. Pearce Memorial Grove (part of Phase 2 of campus construction). The brick wall on the campus perimeter can be seen along Taylor and Morgan Streets. Neighborhood buildings are in the distance.
Date:
August 25, 1967
Collection:
Facility Information Management
Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View east showing the interior of the Plant Research Laboratory during construction (part of Phase 2 of campus construction).
Date:
July 27, 1967
Collection:
Facility Information Management
Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View northeast during later stages of construction showing exterior brick walls and glass roof for the Plant Research Laboratory (part of Phase 2 of campus construction). The downtown Loop skyline is visible behind it.
Date:
May 27, 1967
Collection:
Facility Information Management
Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View southeast showing exterior concrete walls with brick facing and windows above, during construction of the Plant Research Laboratory (part of Phase 2 of campus construction).
Date:
April 27, 1967
Collection:
Facility Information Management
Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View east showing the interior of the Plant Research Laboratory during construction (part of Phase 2 of campus construction).
Date:
November 25, 1966
Collection:
Facility Information Management
Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View southeast looking across the intersection of South Halsted and West Taylor Streets, showing site preparations for the Plant Research Laboratory (part of Phase 2 of campus construction).
Date:
June 1, 1966
Collection:
Facility Information Management
Access:
Public access


Walkway ramps, University Hall, University of Illinois at Chicago
Image nop
View of the curved ramps outside the west side of University Hall. The Behavioral Sciences Building is in the distance on the left.
Date:
1993
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
March 28, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
March 28, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View of the completed facade of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A planned south addition remained unbuilt. A section of the elevated walkway is visible at the far left of the photograph.
Date:
March 28, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View looking northeast during late stages of construction on the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). Part of the elevated walkway is visible at the lower right of the photograph.
Date:
March 28, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of furniture and equipment in a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View along a hallway during late stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). A wall-mounted ashtray is at the left.
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of built-in furniture for a laboratory, and hardware including faucets, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
December 29, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northwest showing the completed exterior brick wall on the south facade, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The exterior concrete pylons and steel-framed roof structure are also visible.
Date:
September 29, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of pipes for a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
July 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction), showing the building's exterior nearing completion, and installation of windows on the fourth floor. The exterior concrete pylons and steel-frame roof structure are also visible.
Date:
July 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction), showing work in progress on the exterior brick walls. The exterior concrete pylons and steel-framed roof structure are also visible.
Date:
May 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northeast showing building of exterior walls and scaffolding around the large concrete piers, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
March 28, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Basement mechanical room during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
March 28, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View east during later stages of construction on the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction), showing exterior walls being built. The building's steel-frame roof structure is also visible.
Date:
March 28, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Construction of the foundation for the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
November 25, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northeast during early stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
October 26, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northeast during early stages of construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
September 30, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northeast showing construction of the foundation for the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
July 28, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View showing a pile of fallen cinder blocks during construction of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
second half of 1960s
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View showing detail of electrical installation during construction of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
circa 1967-1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View of stairway during construction of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
May 28, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View east during interior construction of the Science & Engineering Offices building (part of Phase 2 of campus construction), showing a large first floor office space with floor to ceiling windows on the north side of the building.
Date:
April 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View northwest showing exterior construction completed at the Science & Engineering Offices building (part of Phase 2 of campus construction). The scissor staircase, a unique feature of Netsch's design, is visible.
Date:
March 28, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View of elevator lobby in the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View northeast across South Morgan Street showing the completed Science & Engineering Offices building (part of Phase 2 of campus construction). The brick wall marking the campus' west perimeter is in the foreground, and the Library is visible to the left.
Date:
November 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the thirteenth floor of the Science & Engineering Offices building (part of Phase 2 of campus construction). Concrete window panels have been installed on a number of the building's floors. The brick wall marking the campus perimeter along South Morgan Street is in the foreground, and the Library is visible at the far left.
Date:
September 29, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southwest during construction of the ninth floor of the Science & Engineering Offices building (part of Phase 2 of campus construction). A corner of Burnham Hall is visible in the left foreground.
Date:
May 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View at top of site, showing fire damage, during construction of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
May 24, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the third floor of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
November 25, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View northwest showing construction of the foundation for the Science & Engineering Offices building (part of Phase 2 of campus construction), with forms for poured concrete visible. Neighborhood buildings across South Morgan Street are visible in the upper part of the photograph.
Date:
July 28, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View northeast showing construction of the foundation for the Science & Engineering Offices building (part of Phase 2 of campus construction), with forms for poured concrete visible. Classroom buildings Burnham, Taft, and Addams Hall are visible behind it at the upper right.
Date:
June 29, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southwest showing excavations and construction of the foundation for the Science & Engineering Offices building (part of Phase 2 of campus construction), with forms for poured concrete and reinforcing visible. Buildings in the surrounding neighborhood are visible in the distance.
Date:
July 28, 1966
Collection:
Facility Information Management
Access:
Public access