Search for:


Search for:

Showing 1 - 50 of 2148 Records
Parking Lot, University of Illinois at Chicago Circle
Image nop
View of the entrance to Parking Lot 1A, looking southwest from West Harrison Street.
Date:
May 27, 1967
Collection:
Facility Information Management
Access:
Public access


Parking Lots, University of Illinois at Chicago Circle
Image nop
View northwest showing university parking lots located between West Harrison Street, at the left, and the Eisenhower Expressway (I-290), to the right. Parking Lot 11, near the lower center of the photograph has cars parked on it; another parking lot and the Racine Avenue Building are beyond it. Parking Lots 1A and 1B are partially visible at the far left, and the intersection of West Harrison Street and South Racine Avenue is at the upper left.
Date:
May 27, 1967
Collection:
Facility Information Management
Access:
Public access


Parking Lot, University of Illinois at Chicago Circle
Image nop
View southwest in winter towards the intersection of South Racine Avenue and West Harrison Street, during Phase 2 of campus construction. A parking lot is under construction in the foreground. This site is now the location of the UIC Pavilion.
Date:
January 4, 1967
Collection:
Facility Information Management
Access:
Public access


Parking Lot, University of Illinois at Chicago Circle
Image nop
View southwest during construction of a parking lot at the northeast corner of West Harrison Street and South Racine Avenue. Racine Avenue runs across the top of the photograph, and the intersection with West Harrison Street is near the top center. This site is now occupied by the UIC Pavilion.
Date:
November 26, 1966
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View southeast showing the Art & Architecture Building (part of Phase 2 of campus construction). The enclosed elevated walkway leading from the building passes over the Commonwealth Edison (ComEd) electrical substation (demolished 2017) and connects with the main north-south spine of the walkway at the bottom of the photograph. South Halsted Street runs along the top of the photograph, and the intersection with West Harrison Street is at the upper left. The Union Tower (now Student Center East Tower) is at the upper right.
Date:
September 27, 1968
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View northeast showing part of the north end of the Art & Architecture Building (built during Phase 2 of campus construction) before exterior landscaping.
Date:
May 28, 1968
Collection:
Facility Information Management
Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View west showing the Plant Research Laboratory (part of Phase 2 of campus construction), located at the southeast corner of South Halsted and West Taylor Streets. A paved driveway leading to the building is in the foreground.
Date:
September 29, 1967
Collection:
Facility Information Management
Access:
Public access


Site development, University of Illinois at Chicago Circle
Image nop
View northwest showing demolition of existing building located on a parcel of land between West Harrison Street (lower left) and the Eisenhower Expressway (upper right), during Phase 2 of campus construction. The Education & Communications Building (now Education, Theatre, Music, and Social Work, ETMSW) would later be built on this site.
Date:
July 28, 1966
Collection:
Facility Information Management
Access:
Public access


Plant Research Laboratory, University of Illinois at Chicago Circle
Image nop
View southeast looking across the intersection of South Halsted and West Taylor Streets, showing site preparations for the Plant Research Laboratory (part of Phase 2 of campus construction).
Date:
June 29, 1966
Collection:
Facility Information Management
Access:
Public access


Campus view with Great Court and elevated walkway
Image nop
View of the Circle Forum, and Great Court above the Lecture Centers, during removal. A portion of the elevated walkway system is also visible. The Great Court, Circle Forum, and elevated walkway system were demolished over a six-year period extending from 1993 to 1999.
Date:
May 20, 1993
Collection:
Facility Information Management
Access:
Public access


Campus view with Great Court and elevated walkway
Image nop
View of the Circle Forum, and Great Court above the Lecture Centers, during removal of one of the exedrae atop the Great Court. A portion of the elevated walkway system is also visible. The Great Court, Circle Forum, and elevated walkway system were demolished over a six-year period extending from 1993 to 1999.
Date:
May 20, 1993
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Preparations for installation of a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View of a laboratory in the later stages of installation, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View of a mechanical room, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
December 29, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northwest showing the completed exterior brick wall on the south facade, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The exterior concrete pylons and steel-framed roof structure are also visible.
Date:
November 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northeast from the southwest corner of the building, showing the completed exterior brick walls during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). The exterior concrete pylons and steel-frame roof structure are also visible.Part of the elevated walkway is visible at the right, where it passes through the building.
Date:
November 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of pipes, countertops and hardware including faucets for a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
October 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of ductwork during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
August 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of pipes, countertops and hardware including faucets for a laboratory, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
July 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View east during construction of the center addition to the Science and Engineering Laboratory (part of Phase 2 of campus construction). The exterior brick walls and steel-frame roof structure are in place. Part of the elevated walkway is visible at the right.
Date:
June 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View east showing construction in progress on the center addition to the Science and Engineering Laboratory (part of Phase 2 of campus construction). The exterior brick walls and steel-frame roof structure are in place. Part of the elevated walkway is visible at the right.
Date:
May 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Building in progress on the south facade exterior brick walls, during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
April 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View east during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction), showing the completed exterior brick wall on the west facade.
Date:
April 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Building interior during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
February 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View east during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
February 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View north along the elevated walkway during construction of the upper levels of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
Installation of ductwork and pipes during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the third floor of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View southeast in winter from the balcony of the original building (part of Phase 1 of campus construction), during work on the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
December 29, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction). South Halsted Street is in the distance in the upper part of the photograph.
Date:
November 25, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Laboratory addition, University of Illinois at Chicago Circle
Image nop
View northwest during site preparations for construction of the center addition to the Science & Engineering Laboratory (part of Phase 2 of campus construction).
Date:
June 1, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southeast showing exterior construction completed at the Science & Engineering Offices building (part of Phase 2 of campus construction). The southwest entrance to the campus from South Morgan Street is visible in the foreground, and the brick wall that marks the campus' west perimeter is at the right.
Date:
April 25, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View west during construction showing a space with ground floor windows on the north side of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
March 28, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View of an office in the Science & Engineering Offices building with built-in shelving and cabinets. The narrow windows feature the Block I design.
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View northwest showing exterior construction near completion at the Science & Engineering Offices building (part of Phase 2 of campus construction). The scissor staircase, a unique feature of Netsch's design, is visible. The library and University Hall are visible behind it at the right.
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southeast across South Morgan Street showing exterior construction near completion of the Science & Engineering Offices building (part of Phase 2 of campus construction). Scaffolding is in place for work on the scissor stairs.
Date:
December 29, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southwest during construction of the thirteenth floor of the Science & Engineering Offices building (part of Phase 2 of campus construction). Concrete-framed window panels have been installed on most of the building's floors. Burnham Hall is in the left foreground, and the south end of the library is just visible at the right.
Date:
October 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southwest during construction of the thirteenth floor of the Science & Engineering Offices building (part of Phase 2 of campus construction). Concrete window panels have been installed on a number of the building's floors. Burnham Hall is in the left foreground.
Date:
September 29, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View during construction of the Science & Engineering Office building (part of Phase 2 of campus construction), showing underground work adjacent to that building.
Date:
August 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the eleventh floor of the Science & Engineering Offices building (part of Phase 2 of campus construction). Concrete-framed window panels have been installed on a number of the building's floors. The Library and the Staff and Administrative Offices Building (University Hall) are visible behind it at the right.
Date:
July 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the tenth floor of the Science & Engineering Offices building (part of Phase 2 of campus construction). The scissor stair is also visible under construction. Concrete window panels have been installed on a number of the building's floors. A corner of the Science & Engineering Laboratory is visible at the extreme left.
Date:
June 27, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
Inspection of fire damage at top of building site, during construction of the Science & Engineering Offices building (part of Phase 2 of campus construction).
Date:
May 24, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the fifth floor of the Science & Engineering Offices building (part of Phase 2 of campus construction). The Library is at the right, with the addition on its south end in progress, and part of Burnham Hall is at the lower right.
Date:
January 25, 1967
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the second floor of the Science & Engineering Offices building (part of Phase 2 of campus construction). Neighborhood buildings are visible in the distance, west of South Morgan Street.
Date:
October 26, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the third floor of the Science & Engineering Offices building (part of Phase 2 of campus construction). Neighborhood buildings are in the distance, and part of the library is visible at the far right.
Date:
November 25, 1966
Collection:
Facility Information Management
Access:
Public access


Science & Engineering Offices, University of Illinois at Chicago Circle
Image nop
View northeast showing construction of the foundation for the Science & Engineering Offices building (part of Phase 2 of campus construction), with forms for poured concrete and reinforcing visible. Classroom buildings Burnham, Taft, and Addams Hall are visible behind it at the upper right. The library is partially visible at the upper left.
Date:
August 25, 1966
Collection:
Facility Information Management
Access:
Public access


Library addition, University of Illinois at Chicago Circle
Image nop
View of interior space in the Library addition at the south end of the building (part of Phase 2 of campus construction).
Date:
February 22, 1968
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View in winter during construction of the Art & Architecture Building (part of Phase 2 of campus construction).
Date:
December 29, 1966
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View west during construction of the Art & Architecture Building (part of Phase 2 of campus construction). University Hall is in the distance.
Date:
October 26, 1966
Collection:
Facility Information Management
Access:
Public access


Art & Architecture Building, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the foundation of the Art & Architecture Building (part of Phase 2 of campus construction). The Union Tower and Union (now Student Center East) are behind it.
Date:
October 26, 1966
Collection:
Facility Information Management
Access:
Public access