Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southwest in winter during construction of the Physical Education Building (part of Phase 3 of campus construction), showing steel framing for the building's roof structure and vertical supports. The swimming pool is at the left, with steel framing in place for its roof. South Morgan Street runs across the top of the image, and Roosevelt Road is at the right.
Date:
February 21, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View showing coffered concrete ceiling and installation of pipes during construction of the Physical Education Building (part of Phase 3 of campus construction).
Date:
December 22, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the Physical Education Building (part of Phase 3 of campus construction). The swimming pool is in the upper part of the photograph. Roosevelt Road is at the upper left.
Date:
November 16, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest during early stages of construction of the Physical Education Building (part of Phase 3 of campus construction). The swimming pool is on the right side of the photograph, with a construction crane working in it. Roosevelt Road runs diagonally across the upper part of the image, and the intersection with South Morgan street is at the upper left.
Date:
October 18, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southwest showing early stages of construction of the Physical Education Building (part of Phase 3 of campus construction). A construction crane is in the swimming pool. Roosevelt Road is at the right, and South Morgan Street is at the top of the photograph.
Date:
October 18, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View west during construction of the first floor of the Physical Education Building (part of Phase 3 of campus construction). Roosevelt Road is at the far right.
Date:
August 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). Roosevelt Road runs along the left side of the image, and Saint Francis of Assisi Church is visible in the upper left corner.
Date:
July 16, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). The Physical Plant Building is visible in the distance at the center right.
Date:
June 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). The Science & Engineering Offices building is in the distance at the left.
Date:
June 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). Saint Francis of Assisi Church and Roosevelt Road are at the left.
Date:
April 22, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest during early stages of construction of the Physical Education Building (part of Phase 3 of campus construction).
Date:
April 22, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction).
Date:
March 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is at the upper right, and the downtown Loop skyline is visible in the distance.
Date:
March 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast showing excavations and preparations for construction of the Physical Education Building (part of Phase 3 of campus construction). Science & Engineering South and the Science & Engineering Laboratory are in the distance at the right, and the Science & Engineering Offices building is at the upper left.
Date:
February 20, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast showing an excavated site for construction of the Physical Education Building (part of Phase 3 of campus construction). A pipe with a meter is in the foreground.
Date:
January 22, 1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Education & Communications Building (part of Phase 3 of campus construction), showing formwork in place for the building foundation.
Date:
1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View west during construction of the foundations for the Education & Communications Building (part of Phase 3 of campus construction).
Date:
1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the foundation of the Education & Communications Building (part of Phase 3 of campus construction). The intersection of West Harrison Street and South Morgan Street is at the lower right of the image, and the Eisenhower Expressway (I-290) and CTA train tracks are to the right of the construction site, in the upper part of the image.
Date:
1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View east during construction of the foundation of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View west showing construction of the foundation of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
Construction of a locker room with a coffered concrete ceiling in the Physical Education Building (part of Phase 3 of campus construction). Lockers were later installed on the low raised slabs.
Date:
July 28, 1971
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Education & Communications Building (part of Phase 3 of campus construction), showing a room with a coffered concrete ceiling.
Date:
April 6, 1971
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View during the installation of study carrels in the Education & Communications Building (part of Phase 3 of campus construction).
Date:
February 23, 1971
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View towards the back of the Theater during construction, showing concrete risers where auditorium seating will be installed. The Theater is part of the Education & Communications Building, built during Phase 3 of campus construction.
Date:
February 23, 1971
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
February 23, 1971
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View towards the front of a lecture hall at the Education & Communications Building, during installation of seating (part of Phase 3 of campus construction). This space is now also used as a recital hall.
Date:
February 1, 1971
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View of the Education & Communications Building (part of Phase 3 of campus construction), looking northeast in winter from a plaza with granite benches.
Date:
February 1, 1971
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Education & Communications Building (part of Phase 3 of campus construction), showing a hallway with drywall installed, and two decorative roundels cut into the walls.
Date:
December 29, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Education & Communications Building (part of Phase 3 of campus construction), showing ductwork. A decorative roundel cut into the wall is visible in the center distance.
Date:
October 30, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View west along West Congress Parkway showing scaffolding in place during installation of bricks on the exterior of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
October 30, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View towards the back wall of the Rehearsal Hall in the Education & Communications Building (part of Phase 3 of campus construction), showing staircases to a ground-level rear exit and decorative cinder block facing installed on the walls.
Date:
September 2, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Education & Communications Building (part of Phase 3 of campus construction), showing an interior space with a coffered concrete ceiling.
Date:
March 30, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View of the intersection of West Harrison and South Morgan Streets, looking down from University Hall. The Education & Communications Building is visible under construction at the top right of the photograph (part of Phase 3 of campus construction).
Date:
January 5, 1970
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the foundation of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
August 27, 1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northeast during site preparations for construction of the Education & Communications Building (part of Phase 3 of campus construction), including excavation and demolition of old concrete foundations. Bays English Muffins is in the distance at the left.
Date:
July 29, 1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northeast during site preparations for construction of the Education & Communications Building (part of Phase 3 of campus construction). Bays English Muffins is at the far left.
Date:
July 29, 1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest during site preparations for construction of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
July 29, 1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View southeast during excavation and demolition of old concrete foundations in preparation for construction of the Education & Communications Building (part of Phase 3 of campus construction). University Hall is at the upper right.
Date:
June 30, 1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View southwest during site preparations for construction of the Education & Communications Building, including excavation and removal of old concrete foundations (part of Phase 3 of campus construction).
Date:
June 30, 1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northwest during excavation and demolition of old concrete foundations in preparation for construction of the Education & Communications Building (part of Phase 3 of campus construction).
Date:
June 30, 1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northeast during demolition of old concrete foundations in preparation for construction of the Education & Communications Building (part of Phase 3 of campus construction). Bays English Muffins building is at the upper left.
Date:
June 19, 1969
Collection:
Facility Information Management
Access:
Public access


Education & Communications Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the foundation of the Theater, part of the Education & Communications Building. (Built during Phase 3 of campus construction, the building is now named Education, Theatre, Music and Social Work.) West Harrison Street is at the far right.
Date:
September 30, 1969
Collection:
Facility Information Management
Access:
Public access


Proposed Student Services Classroom-Office Building, University of Illinois at Chicago Circle
Image nop
Property line and topography survey (Plat of Survey) for the proposed (Phase 3 of campus construction) Student Services Building Classroom-Office Building, for the area along West Harrison Street between South Morgan and South Halsted Streets.
Date:
1970
Collection:
Facility Information Management
Access:
Public access


Proposed Student Services Classroom-Office Building, University of Illinois at Chicago Circle
Image nop
Index of Drawings for the proposed Student Services Building Classroom-Office Building, 624 & 636, including architectural, structural, mechanical & plumbing, and electrical drawings. Part of Phase 3 of campus construction.
Date:
1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View showing the small gymnasium in use with students practicing gymnastics, in the newly completed Physical Education Building (part of Phase 3 of campus construction). The building's steel-frame roof structure is also visible.
Date:
December 29, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest showing the completed Physical Education Building (part of Phase 3 of campus construction). A section of elevated walkway crossing Roosevelt Road at the building's main entrance is visible at the right. Parking Lots 5 and 5C are at the upper right, and the Utilities Building and Physical Plant Building are at the upper left.
Date:
December 29, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast showing the completed Physical Education Building (part of Phase 3 of campus construction). South Morgan Street is in the lower part of the photograph, and Roosevelt Road is at the left. A section of elevated walkway crossing Roosevelt Road at the building's main entrance is also visible.
Date:
December 29, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction) showing the smaller gymnasium near completion, with wood floors and supports for basketball hoops installed.
Date:
November 25, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View west along Roosevelt Road showing the completed Physical Education Building (part of Phase 3 of campus construction). At the right, a section of the elevated walkway is visible crossing over Roosevelt Road.
Date:
November 25, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View of the completed main gymnasium in the Physical Education Building (part of Phase 3 of campus construction).The steel-frame roof structure is visible.
Date:
October 23, 1970
Collection:
Facility Information Management
Access:
Public access