A collection of photographs documenting the construction of the University of Illinois at Chicago Circle during the 1960s and early 1970s, and removal of the elevated walkways in the early 1990s, as well as documents relating to the planning, growth and development of the University of Illinois Chicago.
Showing 1 - 50 of 196 Records
Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building showing the smaller swimming pool near completion. The steel-frame roof structure is visible.
Date:
December 29, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View west during construction of the Physical Education Building (part of Phase 3 of campus construction), showing exterior work near completion. A section of the elevated walkway is visible at the center right, crossing over Roosevelt Road.
Date:
October 23, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing installation of the floor in the gymnasium.
Date:
September 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building, showing the smaller swimming pool with concrete work in progress.
Date:
August 20, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing cinder blocks being used for construction of interior walls.
Date:
June 17, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast across Roosevelt Road during construction of the Physical Education building( part of Phase 3 of campus construction), showing exterior brick walls completed.
Date:
May 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing installation of pipes. The open atrium is visible at the right.
Date:
April 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the roof installed over the steel structure on the west part of the building. The steel roof structure is visible over the swimming pool at the far right. Roosevelt Road runs across the upper part of the photograph.
Date:
March 21, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north in winter during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the west part of the building with steel framework in place for the roof structure and vertical supports. The office area with its open atrium is visible at the right. Roosevelt Road is at the top of the photograph.
Date:
February 21, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View south in winter during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the steel framework in place for the roof structure and vertical supports. Roosevelt Road is at the bottom of the photograph.
Date:
February 21, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
Construction of a locker room with a coffered concrete ceiling during construction of the Physical Education Building (part of Phase 3 of campus construction). Lockers were installed on the low raised slabs.
Date:
January 23, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southwest during construction of the Physical Education Building (part of Phase 3 of campus construction). The swimming pool is visible near the center of the image. Roosevelt Road is at the right, and South Morgan Street is at the top of the image.
Date:
November 16, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north during construction of the first floor of the Physical Education Building (part of Phase 3 of campus construction). Science & Engineering South is beyond it at the right.
Date:
September 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast showing the foundation of the Physical Education Building in the foreground, and work in progress on the first floor of the building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is at the left.
Date:
September 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast from Roosevelt Road showing construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is at the left.
Date:
August 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the first floor of the Physical Education Building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is at the upper right, and the downtown Loop skyline is visible in the distance at the left.
Date:
August 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). Roosevelt Road runs across the upper part of the image, and Parking Lot 5C and Science & Engineering South are visible at the top.
Date:
July 16, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View east during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is at the upper center.
Date:
May 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). The Science & Engineering Offices building is in the distance at the left.
Date:
May 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). The Science & Engineering Offices building is visible in the distance at the right.
Date:
May 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest showing excavations and preparations for construction of the Physical Education Building (part of Phase 3 of campus construction).
Date:
February 20, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest showing an excavated site along the south side of Roosevelt Road, in preparation for construction of the Physical Education Building (part of Phase 3 of campus construction).
Date:
January 22, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing a locker room with rows of lockers installed on low raised concrete slabs and wooden benches between them. The room has a coffered concrete ceiling.
Date:
November 25, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the Physical Education Building (part of Phase 3 of campus construction), showing exterior work near completion. Saint Francis of Assisi Church is in the distance at the left.
Date:
October 23, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest showing the south and east sides of the Physical Education Building (part of Phase 3 of campus construction) during later stages of work, with exterior brick walls completed.
Date:
October 23, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing electrical wiring and work on walls.
Date:
July 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building, showing the swimming pool with the roof in place over the steel support structure.
Date:
May 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing a locker room with a coffered concrete ceiling. Lockers were installed on the low raised slabs.
Date:
April 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast in winter during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the building's steel framing.
Date:
January 23, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest showing steel framing for the roof structure above the swimming pool, during construction of the Physical Education Building (part of Phase 3 of campus construction).
Date:
December 22, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast during construction of the Physical Education Building (part of Phase 3 of campus construction), showing installation of steel framing for the roof structure and vertical supports.
Date:
December 22, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the Physical Education Building (part of Phase 3 of campus construction), showing framing in place for the roof structure and vertical supports. The swimming pool is at the upper right. Roosevelt Road is at the left.
Date:
November 16, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southeast showing early stages of construction of the Physical Education Building (part of Phase 3 of campus construction). The swimming pool is at the upper left, with a construction crane working in it. Roosevelt Road is visible at the lower left of the photograph.
Date:
October 18, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southwest showing early stages of construction of the Physical Education Building (part of Phase 3 of campus construction). The swimming pool is visible at the left, with a construction crane working in it. Roosevelt Road is at the bottom of the photograph, and South Morgan Street is at the upper right.
Date:
October 18, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View of a mechanical room during construction of the Physical Education Building (part of Phase 3 of campus construction).
Date:
September 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the first floor of the Physical Education Building (part of Phase 3 of campus construction). Saint Francis of Assisi Church is at the upper right, and the downtown Loop skyline is visible in the distance at the left.
Date:
September 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). South Morgan Street is at the bottom of the image, and Roosevelt Road is at the left. Saint Francis of Assisi Church is at the top right.
Date:
July 16, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). The Science & Engineering Offices building is in the distance at the left.
Date:
June 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View north during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). The Science & Engineering Offices building is in the distance at the left.
Date:
June 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction). Roosevelt Road runs across the center of the image.
Date:
May 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction).
Date:
May 19, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northwest during construction of the foundation of the Physical Education Building (part of Phase 3 of campus construction).
Date:
April 22, 1969
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View of the main swimming pool during construction of the Physical Education Building (part of Phase 3 of campus construction), showing concrete work in progress.
Date:
September 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View northeast during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the south side of the building with exterior work near completion. The Science & Engineering Offices building is in the distance at the left.
Date:
August 20, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing an atrium open to the second floor, with a long narrow skylight above it. The entrance to the building is in the center distance.
Date:
July 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education Building (part of Phase 3 of campus construction), showing a locker room with a coffered concrete ceiling. Lockers were installed on the low raised slabs.
Date:
June 25, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View during construction of the Physical Education building (part of Phase 3 of campus construction), showing exterior brick walls completed. Pipes connecting the building and a sewer are in the foreground.
Date:
May 22, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southwest during construction of the Physical Education Building (part of Phase 3 of campus construction), showing the roof installed over the steel structure on the west part of the building. The steel roof structure is visible over the swimming pool at the left. Roosevelt Road is in the lower part of the photograph.
Date:
March 21, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View south in winter during construction of the Physical Education Building (part of Phase 3 of campus construction). The swimming pool is at the center of the image, with steel framing in place for its roof structure. Roosevelt Road is visible at the bottom of the photograph.
Date:
February 21, 1970
Collection:
Facility Information Management
Access:
Public access


Physical Education Building, University of Illinois at Chicago Circle
Image nop
View southwest in winter during construction of the Physical Education Building (part of Phase 3 of campus construction), showing steel framing for the building's roof structure and vertical supports. The swimming pool is at the left, with steel framing in place for its roof. South Morgan Street runs across the top of the image, and Roosevelt Road is at the right.
Date:
February 21, 1970
Collection:
Facility Information Management
Access:
Public access